HomeMy WebLinkAboutFile Documents.110 Coach Rd.0079.2018 (136).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0079.2018.ARBK
Oyster Shores LLC
110_112 Coach Road
2735 0230 3007
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__H__I __
E R__S__
UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
3707.3 s.f.120 s.f.
12,008.9 s.f.
2 1 1
1
3
4 1 338.3 1
3 3 1
1 0 Storage, Laundry
2 1
Mechanical, Laundry, Bedrooms (3), Bathrooms (3), Walk-In Closets (3), Powder Rooms (2), Kitchenette, Family Room
Garage, Mudroom, Office, Wine, Powder, Pantry, Kitchen, Dining, Living Room
Master Bedroom, Master Bathroom, Master Dressing
ADU: Storage, Living Room, Kitchen, Laundry, Bedroom, Bathroom, Closet
Bonnie Muhigirwa 12/31/18
4/5/2018
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
110+112 Coach Road
970-429-8470Zone 4 Architects LLC / Jeff McCollum jmccollum@zone4architects.com
970-920-1558Hansen Construction / Blake Hansen bhansen@hansenconst.com
970-925-3771Oyster Shores LLC / Contact: Peter Van Domelen (Special Manager)
c/o Peter Van Domelen; 400 E. Main Street, Suite #2 Aspen CO 81611
vand@reesehenry.com
970-925-3771Oyster Shores LLC / Contact: Peter Van Domelen
c/o Peter Van Domelen; 400 E. Main Street, Suite #2 Aspen CO 81611
vand@reesehenry.com
970-429-8470Zone 4 Architects LLC / Contact: Jeff McCollum
PO Box 2508 Aspen CO 81612
jmccollum@zone4architects.com
970-429-8470Zone 4 Architects LLC / Contact: Jeff McCollum
PO Box 2508 Aspen CO 81612
jmccollum@zone4architects.com
970-340-4130Roaring Fork Engineering / Contact: Tyler Stevens
592 Highway 133 Carbondale CO 81623
tylers@rfeng.biz
970-510-0773Evolve Structural Design
1040 Main Street Carbondale CO 81623
steve@evolvestruct.com
970-920-1558Hansen Construction / Contact: Blake Hansen
310 Aspen Business Center Aspen CO 81611
bhansen@hansenconst.com
3-23-18Blake Hansen
4/5/2018
3387 80
External Energy Use Approved
RREMP CREMP
PERMIT #DATE
SNOWMELT _____________________________
POOL _____________________________
SPA _____________________________
OFFSET:________________________________
REMP SHEET: ___________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
3387 sf
0
80
A-102
19.82kw
BM
X
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
The following criteria must also be met with construction:
Ø A construction fence must be erected along the entire dripline of
all trees on site and any tree canopy from neighboring property.
This will serve as the tree protection zone (TPZ). This fence is to
be constructed in such a manner that the area inside the dripline is
protected. AN INSPECTION OF THIS FENCE MUST BE
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION
ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION
WITH BEN CARLSEN AT 429-2034.
Ø No materials may be stored in the TPZ, including but not limited
to, construction backfill, construction traffic, or any other
construction materials.
Ø No excavation, grading or trenching may occur within the TPZ
without the consent of the City of Aspen Forester or his designee.
Ø No parking of vehicles or equipment may occur in the TPZ.
Ø No dumping of any waste products may occur in the TPZ.
Ø Any roots cut during excavation shall be pruned with sharp
loppers/pruners back to the soil line. The roots will further be
protected by burlap draped over the side of the excavation
covering the exposed roots. This burlap shall be kept moist until
the excavation is backfilled.
Ø Pruning to provide clearance for construction activities shall only
be done under the direction of an arborist.
Ø Site inspections shall be performed on a weekly basis, to ensure
the above listed conditions are met.
Ø Any unapproved improvements or activities outside of those
approved within this permit will be subject to mitigation in the form
of restoration.
Ø This permit must be posted on site during the construction
process.City of Aspen - Tree Planting Specifications
Trunk caliper shallmeet ANSI Z60 current
edition for root ball size.
Modified soil. Depth
varies. (See soil preparation
plan).
Finished grade.
Bottom of root ball rests on
existing or recompacted
soil.
Central leader. (See crown
observations detail).
SECTION VIEW
Remove 1/3 of burlap and basket wire.
Round-topped
soil berm 4" high x 8" wide
above root ball surface
shall be constructed around
the root ball. Berm shall
begin at root ball periphery.
Top of root ball shall be flush with
finished grade.
Prior to mulching, lightly tamp soil
around the root ball in 6" lifts to
brace tree. Do not over compact.
When the planting hole has been
backfilled, pour water around theroot ball to settle the soil.
4" layer of mulch.
No more than 1" of mulch on
top of root ball. (See
specifications for mulch).
Notes:1- Trees shall be of quality
prescribed in crown
observations and root
observations details and
specifications.
2- See specifications for
further requirements related to
this detail.
Existing soil.
TP-1
s >5
1/ iT\ 1//0/1>/1'/1';;; /1'/1 \ */ ’ \ */ \ */ \ */ \ */ \"-'i .-..t ■ 1 'i.i-i 1 i- -i-- V »
I.v '/ O'/' \ '/ ' '/ O'/' O/^ i'l —I r i'l [v-
I yqTTE3TTr=rrfSSvSOI ItFFt
Tr TT
ALJ
The City of Aspen
City of Aspen - Tree Protection Zone
Crown drip line or other limit of Tree Protection area. See
tree preservation plan for fence alignment.
4'-
0
"
Maintain existing
grade with the tree
protection fence
unless otherwise
indicated on the
plans.
2" x 6' steel postsor approved equal.
Tree Protection
fence: High densitypolyethylene fencing
with 3.5" x 1.5"
openings; Color-
orange. Steel posts
installed at 8' o.c.
5" thicklayer of mulch.
Notes:
1- See specifications for additional tree
protection requirements.
2- If there is no existing irrigation, see
specifications for watering requirements.
3- No pruning shall be performed except
by approved arborist.
4- No equipment shall operate inside the
protective fencing including during fence
installation and removal.
5- See site preparation plan for any
modifications with the Tree Protection
area.
SECTION VIEW
KEEP OUT
TREE
PROTECTIONAREA
8.5" x 11"
sign
laminated inplastic spaced
every 50'
along the
fence.
URBAN TREE FOUNDATION OPEN SOURCE FREE TO USETPZ-1
Tree protection fencing is required at the driplines of all trees shown.
There is NO activity allowed within this fenced area, including, but notlimited to: digging, storage of material, equipment, machinery, foot orvehicle traffic.
Please contact the City Forester or his designee at 920-5120 for aninspection of this fencing Prior to any activity.
If the need arises to perform any activity in the tree protection area, pleasecontact the City Forester and you will be given specific instructions as tohow to proceed to minimize impacts to the tree root zone.
Reviewed by Engineering
02/26/2019 5:26:53 PM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen. The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements." The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.
City Development Engineer's Comments
1. Encroachments: Any existing or planned encroachments into the public
right-of-way, including temporary construction trailers and dumpsters, must be
applied for licensing at City Engineering (920- 5080). Five davs advance
notice is required to obtain a temporary encroachment license.
2. Right-of-way Permits: Approval of these plans by the City Building Dept. is
for work on private property only. Design approvals for proposed work
(including landscaping) in the public right-of-way (ROW) must be obtained
from City Engineering Dept. (920-5080) and Parks Dept. (920-5120) . A
permit for work in the public right-of-way must be obtained from the City
Engineering Dept. five days in advance of when the permit is needed.
3. Mud, dirt and debris may not be tracked onto the adjacent public ROW,
and the adjacent ROW must be clean at the end of eachworkday. Construct
mud rack if needed. Trucks hauling demolished materialsmust becovered.
4. Utilities in ROW: No utility pedestals, meters, or electric transformers can
be installed in the public right-of-way. Provide utility easements on private
property as needed.
5. Certificate of Occupancy (CO) Inspection: Engineering CO Inspection
includes but is not limited to: (a) witnessing that all property corners
havemonuments, (b) drainage improvements were installed as approved, (c)
easements are documented, (d) no unapproved ROW encroachments exist,
and (e) the ROW has been restored. Call 429-2750 to arrange CO inspection.
6. Snowmelt Driveways : (i) Snowmelt runoff from driveway cannot flow into
street . A grate or swale must intercept runoff before street. (ii) Snowmelt
installation in the public ROW requires an encroach- ment permit.
7. Drainage Issues: (i) Foundation drains cannot go to a dry well receiving
other drainage flows. (ii) City must be notified of drainage plan changes. (iii)
Plan approval assumes no ground water. If ground water is encountered, call
the Senior Dev. Engineer at 920-5080. Call for an open hole inspection prior
to placement of the drywell.
8. No Loose Material Storage allowed in R.O.W.
9. Neighbor Notification: For all excavation, the Contractor must comply with
neighbor notification requirements per Section 3307 of the 2003 International
Building Code (IBC)
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning (Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
04/05/2018 0079.2018.ARBK
110+112 Coach Road, Aspen, CO 81611 273502303007
7 Stage Road PUD
Oyster Shores LLC 970-925-3771 vand@reesehenry.com
Zone 4 Architects, LLC / Jeff McCollum 970-429-8470 jmccollum@zone4architects.com
New construction of single-family residence including lower (below grade), entry, and upper levels. New Construction of Accessory Dwelling Unit (ADU) including lower storage and crawlspace (below grade) and entry level.
$7,876,250 8
9,694.9 s.f.
N/A
155,641 s.f.
27,180 s.f.
House: 7,498.5 sf.; ADU: 998.7 s.f.
165.2 s.f.
X3
11
53414
05
4
PD 3707.2 s.f.
4/3/18
62950.47
JB
96846.88 x bn 4/5/19
32915.61 10300.94 x BM 12/31/18
10300.94 5186.83 x BM 12/31/18
x mh 2/26/19
14527.03 x tk 2/14/19
x sw 4/3/19
5186.83 x
815.39 x PM 5/7/18
81650.63 x
500 19690.63 x
434
12XX
XXXXXx
4x
4/5/2018
RM 2.21.19
Dr 3/15/19
sw 4/3/19
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
DAM 4/15/19
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items.
2.
4.
1
0079.2018.ARBK110 Coach Rd
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work without special inspection.
2
4/5/2018
ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: _____________________________________________
o Your Name (Person Completing Part A): ____________________________________________
o Your Company: ________________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
110 + 112 Coach Road, Aspen, CO, 81611
Jeff McCollum
Zone 4 Architects LLC
Architectural 100'-0" = Site Elevation 7780.0'
7766.82'
4/5/2018
REScheck Software Version 4.6.4
Compliance Certificate
Project Bar X Residence
Energy Code:2015 IECC
Location:Aspen, Colorado
Construction Type:Single-family
Project Type:New Construction
Conditioned Floor Area:8,511 ft2
Glazing Area 48%
Climate Zone:7 (9922 HDD)
Permit Date:
Construction Site:
Coach Road
Aspen, CO 81612
Owner/Agent:
Contact: Architect
Oyster Shores LLC
Aspen, CO 81611
Designer/Contractor:
Jeff McCollum
Zone 4 Architects
432a E. Hyman Avenue
Aspen, CO 81612
jmccollum@zone4architects.com
Permit Number:
Compliance: Passes using UA trade-off
2.6% Better Than Code Maximum UA:1681 Your UA:1637
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Floor Over Crawl Space: All-Wood Joist/Truss:Over Unconditioned Space 3,261 38.0 0.0 0.026 85
Floor Over Outside: All-Wood Joist/Truss:Over Outside Air 832 38.0 0.0 0.026 22
W-1: Solid Concrete or Masonry
Wall height: 10.5'
Depth below grade: 10.5'
Insulation depth: 10.5'
314 13.0 5.0 0.039 12
W-2: Solid Concrete or Masonry
Wall height: 10.5'
Depth below grade: 10.5'
Insulation depth: 10.5'
441 20.0 5.0 0.032 14
W-2 with ducts: Solid Concrete or Masonry
Wall height: 10.5'
Depth below grade: 10.5'
Insulation depth: 10.5'
205 5.0 5.0 0.051 10
W-3: Solid Concrete or Masonry:Interior Insulation 1,066 20.0 0.0 0.057 61
W-3 with ducts: Solid Concrete or Masonry:Interior Insulation 110 5.0 0.0 0.167 18
W-4: Wood Frame
Wall height: 10.5'
Depth below grade: 10.5'
Insulation depth: 10.5'
398 21.0 0.0 0.039 16
W-5 & W-6: Wood Frame, 16" o.c.6,085 29.0 0.0 0.049 112
Window: Wood Frame:Double Pane with Low-E 2,741 0.320 877
Project Title: Bar X Residence
Data filename: J:\Jobs\2018 - Jobs\18003.00 - DBX7\Mechanical\Calculations\REScheck\18003-Rescheck
House.rck
Page 1 of10
10/19/18Report date:
10/19/18
10/30/2018
01/17/2019
bonniem
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Glass Door: Glass 716 0.320 229
Solid Door: Solid 348 0.300 104
5/8:12 Slope Roof: Cathedral Ceiling 2,241 57.0 0.0 0.019 43
Deck Roof: Cathedral Ceiling 201 57.0 0.0 0.019 4
Flat Roof: Cathedral Ceiling 1,515 57.0 10.0 0.016 24
Lower Level Ceiling to Grade: Cathedral Ceiling 388 57.0 10.0 0.016 6
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.6.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Notes:
Calcs By: Joshua Westerlind - Rader Engineering (970)-845-7910
Project Title: Bar X Residence
Data filename: J:\Jobs\2018 - Jobs\18003.00 - DBX7\Mechanical\Calculations\REScheck\18003-Rescheck
House.rck
Page 2 of10
10/19/18Report date:
Joshua Westerlind - Mechanical Engineer 10/19/18
10/30/2018
REScheck Software Version 4.6.4
Compliance Certificate
Project Bar X Residence Detached Guest Quarters
Energy Code:2015 IECC
Location:Aspen, Colorado
Construction Type:Single-family
Project Type:New Construction
Conditioned Floor Area:653 ft2
Glazing Area 51%
Climate Zone:7 (9922 HDD)
Permit Date:
Construction Site:
Coach Road
Aspen, CO 81611
Owner/Agent:
Oyster Shores LLC
Aspen, CO 81612
Designer/Contractor:
Jeff McCollum
Zone 4 Architects
432a E. Hyman Avenue
Aspen, CO 81612
jmccollum@zone4architects.com
Permit Number:
Compliance: Passes using UA trade-off
5.4% Better Than Code Maximum UA:166 Your UA:157
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Floor Over Crawl: All-Wood Joist/Truss:Over Unconditioned Space 367 38.0 0.0 0.026 10
Lower Level Ceiling to Grade: Cathedral Ceiling 63 49.0 0.0 0.022 1
Flat Roof: Cathedral Ceiling 286 57.0 0.0 0.019 5
Above Grade Wall: Wood Frame, 16" o.c.316 21.0 0.0 0.057 2
Windows: Wood Frame:Double Pane with Low-E 263 0.320 84
Glass Doors: Glass 24 0.320 8
Above Grade Wall with Concrete Veneer: Wood Frame, 16" o.c.246 21.0 0.0 0.057 14
Below Grade Furred Wall: Wood Frame
Wall height: 9.0'
Depth below grade: 9.0'
Insulation depth: 9.0'
860 13.0 5.0 0.038 33
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.6.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Notes:
Project Title: Bar X Residence Detached Guest Quarters
Data filename: J:\Jobs\2018 - Jobs\18003.00 - DBX7\Mechanical\Calculations\REScheck\18003-Rescheck
Detached Guest Quarters.rck
Page 1 of10
10/19/18Report date:
Joshua Westerlind - Mechanical Engineer 10/19/18
10/19/18
10/30/2018
01/17/2019
bonniem
BM BONNIE MUHIGIRA