HomeMy WebLinkAboutFile Documents.203 E Hallam St.0174.2018 (5).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0174.2018.ARBK
Styslinger
203 E Hallam
2737 0731 6002
September 11, 2018
Seth Hmielowski
Z-Group Architects, P.C.
411 East Main Street, Suite 205
Aspen, Colorado 81611
970.925.3383
RE: Roof Deck Addition and New Mudroom Door/Window
Styslinger Remodel – 203 E Hallam, Aspen, Colorado 81611
Seth,
As requested, we have reviewed the architectural drawing A3.1, received via email on June 11, 2018 for
structural implications of the proposed roof deck on the existing roof and the new door and window at the
mudroom at the above site. The new door and window at the mudroom will fit within the existing rough
opening width on the west wall of the mudroom. Infill frame with 2x6 @ 16”o.c. around new openings as
needed with a minimum of two studs between the new window and door.
The roof deck is proposed to be 2x wood decking over 2x wood sleepers and is specified to cover a portion of
the east end of the flat roof area in the middle of the home. The deck is intended to be placed approximately
between grids 2 and 3 and grids B and C as noted on sheet A3.1 referenced above. The new roof deck is
proposed to be accessed through a new roof hatch of approximately 3’ x 8’ in size and located to the north of
grid 3 between grids A and B, in an existing closet behind the stairs.
The new roof hatch is to be cut into the roof framing in the bay defined above and shall be framed out with
(2) 14” (2.0E) LVLs typical at its edges. The new LVL beam on the east side of the opening shall bear on the
wall to the north and hang off the existing beam at grid 3 in an HU412 Simspon hanger. Provide IUS hangers
to support cut rafters at edge of new opening and HU412 hangers at new framing beam to beam
connections. The contractor shall temporarily shore the roof framing during construction as needed.
As outlined above, the existing roof structure of 14” TJI 360 @ 16”o.c., or equal, is sufficient to support the
new roof deck. Should you have any further questions or require any additional information regarding this
matter, please contact our office.
Sincerely,
Evolve Structural Design LLC
Steven R. Edmiston, P.E., S.E.
Senior Engineer
1/7/2019
City of Aspen - Tree Planting Specifications
Trunk caliper shall
meet ANSI Z60 currentedition for root ball size.
Modified soil. Depth
varies. (See soil preparation
plan).
Finished grade.
Bottom of root ball rests onexisting or recompacted
soil.
Central leader. (See crown
observations detail).
SECTION VIEW
Remove 1/3 of burlap and basket wire.
Round-topped
soil berm 4" high x 8" wide
above root ball surface
shall be constructed around
the root ball. Berm shall
begin at root ball periphery.
Top of root ball shall be flush with
finished grade.
Prior to mulching, lightly tamp soil
around the root ball in 6" lifts to
brace tree. Do not over compact.When the planting hole has been
backfilled, pour water around the
root ball to settle the soil.
4" layer of mulch.
No more than 1" of mulch on
top of root ball. (See
specifications for mulch).
Notes:
1- Trees shall be of qualityprescribed in crown
observations and root
observations details and
specifications.
2- See specifications for
further requirements related to
this detail.
Existing soil.
TP-1
s >5
1/ iT\ 1//0/1>/1'/1';;; /1'/1
\ */ ’ \ */ \ */ \ */ \ */ \"-'i .-..t ■ 1 'i.i-i 1 i- -i-- V »
I.v '/ O'/' \ '/ ' '/ O'/' O/^ i'l —I r i'l [v-
I yqTTE3TTr=rrfSSvSOI ItFFtTrTT
ALJ
The City of Aspen City of Aspen - Tree Protection Zone
Crown drip line or other limit of Tree Protection area. See
tree preservation plan for fence alignment.
4'-
0
"
Maintain existing
grade with the tree
protection fence
unless otherwise
indicated on the
plans.
2" x 6' steel posts
or approved equal.
Tree Protection
fence: High density
polyethylene fencingwith 3.5" x 1.5"
openings; Color-
orange. Steel posts
installed at 8' o.c.
5" thick
layer of mulch.
Notes:
1- See specifications for additional treeprotection requirements.
2- If there is no existing irrigation, seespecifications for watering requirements.
3- No pruning shall be performed except
by approved arborist.
4- No equipment shall operate inside the
protective fencing including during fence
installation and removal.
5- See site preparation plan for any
modifications with the Tree Protection
area.
SECTION VIEW
KEEP OUTTREE
PROTECTION
AREA
8.5" x 11"
sign
laminated in
plastic spaced
every 50'
along the
fence.
URBAN TREE FOUNDATION OPEN SOURCE FREE TO USETPZ-1
The following criteria must also be met with construction:
Ø A construction fence must be erected along the entire dripline of
all trees on site and any tree canopy from neighboring property.
This will serve as the tree protection zone (TPZ). This fence is to
be constructed in such a manner that the area inside the dripline is
protected. AN INSPECTION OF THIS FENCE MUST BE
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION
ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION
WITH IAN GRAY AT 429-2031.
Ø No materials may be stored in the TPZ, including but not limited
to, construction backfill, construction traffic, or any other
construction materials.
Ø No excavation, grading or trenching may occur within the TPZ
without the consent of the City of Aspen Forester or his designee.
Ø No parking of vehicles or equipment may occur in the TPZ.
Ø No dumping of any waste products may occur in the TPZ.
Ø Any roots cut during excavation shall be pruned with sharp
loppers/pruners back to the soil line. The roots will further be
protected by burlap draped over the side of the excavation
covering the exposed roots. This burlap shall be kept moist until
the excavation is backfilled.
Ø Pruning to provide clearance for construction activities shall only
be done under the direction of an arborist.
Ø Site inspections shall be performed on a weekly basis, to ensure
the above listed conditions are met.
Ø Any unapproved improvements or activities outside of those
approved within this permit will be subject to mitigation in the form
of restoration.
Ø This permit must be posted on site during the construction
process.
Tree protection fencing is required at thedriplines of all trees shown.
There is NO activity allowed within this fencedarea, including, but not limited to: digging,storage of material, equipment, machinery,foot or vehicle traffic.
Please contact the City Forester or hisdesignee at 920-5120 for an inspection of thisfencing Prior to any activity.
If the need arises to perform any activity inthe tree protection area, please contact theCity Forester and you will be given specificinstructions as to how to proceed to minimizeimpacts to the tree root zone.
External Energy Use Approved
RREMP CREMP
PERMIT #DATE
SNOWMELT _____________________________
POOL _____________________________
SPA _____________________________
OFFSET:________________________________
REMP SHEET: ___________________________
REVIEWED BY: _________________________
4
bonniem
4/1/20190174.2018.ARBK
760 sqft
0 sqft
48 sqft
L.1.05
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
none
REFERENCES FROM 2015 IRC
CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4
EE = emergency escape required sec R310.1
EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7
G/D = garage/dwelling separation, sec R302.5 and R302.6
STC = Sound transmission class not less than 45 at dwelling separations, app
K
RV = roof and rafter ventilation required, R806.1
A = attic access 22” x 30”, 30” headroom above, R807.1
SA = smoke alarms installed to NFPA 72 requirements, sec R314
CO = carbon monoxide detector per City Ordinance 41 series 2008
SG = safety glazing required, sec R308.4
GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36”
horizontally, sec R312
WFP = window fall protection- operable window <24” AFF & >72” above
grade: use opening control device listed to ASTM F2090, sec R312.2
HR = handrails 34”-38” ht, sec R311.7.8
SI = stairway illumination, sec R303.7
PD = protect against decay, sec R317
REFERENCES FROM 2015 IMC
V = bathroom and balanced whole house mechanical ventilation req.
Ordinance 40, 2016
DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM
AS = access and service space for maintenance req’d, sec 306
MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2
ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes,
501.3.1
IT= intake openings 10’ from lot line & contaminant sources (vents, streets),
401.4
D = fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
DV = direct vent req’d, sec 303.3
CA = combustion air not taken from bedrooms, bathrooms or
storage sec 303.3
OD = outdoor appliances must be listed for outdoor use, sec 303.6
REFERENCES FROM 2015 IECC
F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label
required, Ordinance 40, 2016
L = 75% of lamps in permanently installed lights must be high efficacy, sec
R404.1
SE = Continuous air barrier required; all exterior joints, cracks, and holes to be
caulked, gasketed, sealed, table R402.4.1.1
REFERENCES FROM 2014 NEC
EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
04/12/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check (Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
6/27/18 0174.2018.ARBK
203 East Hallam 273707316002
A and B 72 Aspen Townsite
Mark and Jennifer Styslinger 205-902-7374 mark.styslinger@altec.com
Seth Hmielowski 970.319.8327 seth@zgrouparchitects.com
roof deck addition and new exterior door, interior finish renovation, landscaping renovation
500,000.00
372.5 SF
3,240 SF
6,000 SF
1266 SF
181 Deck
n/a
bar sink
jb 6/27/18
8303.75
x
12775 x JPo 4/12/19
2272.45 162.50 x BM 4/1/19
162.50 0 x BM 4/1/19
HG 2/12/19
1916.25 x TK 2/22/19
x SW 3/18/19
0
x PM 7/12/18
4200 x
1250
1
06/27/2018
Dr 3/28/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
970.319.8327Seth Hmielowski seth@zgrouparchitects.com
970.948.2550Craig Barnes craig@cbcaspen.com
Mark and Jennifer Styslinger 205-902-7374
203 East Hallam Aspen CO 81611
mark.styslinger@altec.com
970.925.1832Seth Hmielowski 970.319.8327
411 East Main Street, Suite 205 Aspen CO 81611
seth@zgrouparchitects.com
same as owner's agent
970.925.1832Seth Hmielowski 970.319.8327
411 East Main Street, Suite 205 Aspen CO 81611
seth@zgrouparchitects.com
Steve Edmiston 206.910.7766
1040 Main Street Carbondale CO 81623
steve@evolvestruct.com
Craig Barnes 970.348.2550
190 Riverdown Dr.Aspen CO 81611
craig@cbcaspen.com
06/27/2018
FIRE
SPRINKLERS
REQUIRED
JH 4/24/19