HomeMy WebLinkAboutFile Documents.813 W Smuggler St.0253.2018 (28).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
09/16/2019
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0253.2018.ARBK 10/1/19
130 SF
0
0
A3.2, M-3
95%
NONE
JH
09/30/2019
CCC/justinh
Recessed luminaires installed
in building thermal envelope
shall be sealed and IC-rated– IECC sec R402.4.5
Any recessed light fixtures
in contact with insulation
must be IC rated.
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
All snowmelt systems shall meet the following:
- Any portions in the Right of Way must be on a separate zone. A ROW permit
and Permanent Encroachment License are required.
- R10 insulation shall be installed under the area to be snowmelted or R5 insulation
shall be installed under the slab edges. (Ordinance 11 Series 2011)
- Automatic controls installed for system shut off when pavement temperature is above
50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5)
- Automatic or manual controls installed for system shut off when outdoor temperature
is above 40°F. (2015 IECC R403.9 and C403.2.3.5)
- Inspection by testing hydrostatically at 1.5 times max system design pressure, but not
less than 100psi, for 15 minutes. (2015 IMC 1208.1)
Code Editions
Fire Sprinkler System
Type Kf Construction Fire Alarms /nstalled
Required Special /nspections
Energy Code Compliance
Exterior Energy Use Total Approved Kn-Site Snowmelt________ Spa_______ Pool _________
Building Type/Kccupancy Group
CKMMUE/Tz DEVELKPMEET DEPARTMEET
BUILDING DESCRIPTION FORM - IRC & IBC
C/Tz KF ASPEE 1ϯ0 S. GALEEA ST ͮ ASPEE, CK 81ϲ11
BUILDING CODE INFORMATION
Ϯ015 /RC
Existing?EFPA 1ϯ EFPA 1ϯ R
,igh-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Kther _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
η Stories Above Grade ______ η Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
η Bedrooms ______ η Full Baths ______ Deck Area ______
η ϯ/ϰ Baths ______ η 1/Ϯ Baths ______
η <itchens ______ η Wood Fireplaces ______
η Gas Appliances ______ η Gas Logs______
EFPA 1ϯ D
RESCheck UA Alternative
zes Eo
Kne Family Two Family
Townhouse
Reviewed By͗ _____________________Date͗__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
Ϯnd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
ϯrd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
/s there an ADU?
η Living Rooms_____
η <itchens _____
η Full Baths _____
η ϯ/ϰ Baths _____
η 1/Ϯ Baths _____
η Bedrooms _____
η Kther Rooms (List)____________
ADU BUILDING DESCRIPTION
zes
Eo
PERM/T EUMBER͗ _______________________________
(As Adopted and Amended)
Kther (Please Explain)
_________________
_________________
VA VB /V ///A ///B //A //B /A /B
Sprayed Fire-Resistants
CKMCheck UA Alternative
(Existing + Eew)
A__B
B (A ф50)
F__
,__
/ __
E R__
S__
U
M
IRC
IBC
Ϯ015 /BC
(As Adopted and Amended)
zes
Eo Required?zes
Eo Type
January 2018
Ϯ015 /EBC
(As Adopted
and Amended)
Kther _____________
Gross Area of Building͗ __________ Gross Area of Unit͗ __________
Kccupant Load͗ ___________
■
130
■
2 bedrooms, media room, gym, 3 - 3/4 baths, laundry room, mechanical room
Kitchen, living room, bedroom, 3/4 bath, 1/2 bath, garage
Bedroom, full bath
JH 10/2/19
5550 5550
02
02
01
N/AN/A
04
04
01
04
01
01
0
0
393 sf
N/A
N/A
n/a n/a
4/04/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
/NSPEd/ONS: dhe 'eneral ontractor must schedule insƉections online͘
Please ǀisit www͘asƉenƉitkin͘comͬDeƉartmentsͬommunityͲDeǀeloƉmentͲFormsͬ to do so͘
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE OELY) Owner builder approved by͗________________________Date͗______________________ Affidavit on file
ADDRESS͗ ____________________________PERMIT EUMBER͗ _______________________________
August 2017
813 W. SMUGGLER ST., ASPEN
REA COULTER
ROB SINCLAIR ROB@SIN-BAD.COM970-925-4269
REA@SIN-BAD.COM970-379-9894
SMUGG LLC
COP.O. BOX 10521
CSANDERS@SHERMANHOWARD.COM
ASPEN 81612-7344
CURTIS B. SANDERS, ESQ.
CO
970-925-6300
730 E. DURANT AVE., 2nd FLOOR
CSANDERS@SHERMANHOWARD.COM
ASPEN 81611
970-300-0114
ROB SINCLAIR
CO
970-925-4269
P.O. BOX 8114
ROB@SIN-BAD.COM
ASPEN 81612-8114
970-948-4269
ALBRIGHT & ASSOCIATES 970-927-4363
402 PARK AVENUE • UNIT A
JACK@ALBRIGHT-ASSOCIATES.COM
BASALT 81621
970-927-3039
ROBERT G. SINCLAIR
970-925-4269
P.O. BOX 8114
ROB@SIN-BAD.COM
ASPEN 81612-8114
970-948-4269SINCLAIR BLDG | ARCH. | DESIGN
HIGH COUNTRY ENGINEERING 970-945-8676
1517 BLAKE AVENUE • SUITE 101
RNEAL@HCENG.COM
GLENWOOD SPGS 81601
970-945-2555
CO
CO
ROBERT G. SINCLAIR, AIA
970-925-4269
P.O. BOX 8114
ROB@SIN-BAD.COM
ASPEN 81612-8114
970-948-4269SINCLAIR BLDG | ARCH. | DESIGN
03/15/2019
CO
970-925-6300 970-300-0114
4/04/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work
or construction authorized is not commenced within 180 days, or if construction or work is suspended or
abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use
IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Dedication
Zoning
Review (50%)
CMP (50%)TDM Impact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
ReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.
Unit Sq Ft: Gross square footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed
New Sq Ft: Total added square footage for additions to net livable or net leasable space.
Building Footprint: Grade floor square footage of the permitted structure.
Hardscape Area: Square footage of impervious lot surface.
Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review
• Projects involving less than 50%
hardscape area and work affecting
75% or greater of unit sq ft
• Projects involving greater than
50% hardscape area and work
affecting 50% or greater of unit
sq ft
• Projects involving 1,000+ sq ft of
soil disturbance area
Water Efficient Landscaping
• Projects that trigger a major
engineering review
• Projects involving interior
alterations affecting 50% or more
of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
0253.2018.ARBK
x jb 4/4/19
x JRB 9/17/19
x JH 10/2/19
x JH 10/2/19
28616.25 44025 17287.40 x JD 10/14/19
x
10113.41 4781.25 31008.28 x
x
4781.25 3009.37 1934.92 x
6603.75 0 x
3009.37 500 285031.78 x
198.57 25200
5738.21 6250
813 W. SMUGGLER STREET, ASPEN N/A 273512428003
ROB@SIN-BAD.COM970-948-4269SMUGG LLC
RANGER STATION SUBDIVISIONUNPLATTED3
ROB@SIN-BAD.COM970-948-4269ROBERT G. SINCLAIR
03/15/2019
NEW SINGLE-FAMILY HOME ON 2-LEVELS + FINISHED BASEMENT, TO INCLUDE 4-BEDROOMS (2 @BASEMENT, 1 @MAIN LEVEL,
MASTER SUITE @UPPER LEVEL) & 5 1/2 BATHROOMS. BASEMENT INCLUDES MEDIA ROOM W/ BAR, WINE STORAGE, YOGA/GYM
& LAUNDRY. 2-CAR GARAGE OFF ALLEY. AND INTEGRAL FRONT PORCH.
R-6
5,228 SF
$2.5M
N/A
535 SF
4,930 SF
6,639 SF
5,228 SF
2,653 SF
6
1
2
1
4
8
7
512
2
n/a
n/a
4/04/2019
rm 10/16/19
rm 10/16/19
DAM 10/23/19
AR 10/21/19
SW 10/21/19
AR 10/21/19
PM 5/8/19
FIRE
SPRINKLERS
REQUIRED
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
@SLOPED
ROOFS
@FLAT
ROOFS
√
√
@FLAT
ROOFS
@SLOPED
ROOFS
09/30/2019
CCC/justinh
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
1
813 W. SMUGGLER ST., ASPEN 0253.2018.ARBK
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
2. Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
3. Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
2. Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
09/30/2019
CCC/justinh
09/30/2019
CCC/justinh
JH Justin Hahn 10/3/19
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
09/30/2019
CCC/justinh