BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
BuildingReview BuildingPermit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Dedication
Zoning Review (50%)CMP (50%)TDM Impact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County UseTax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area
Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
555 E Durant 273718249021
Gorsuch 970.343.0141 jeffgorsuch@gorsuch.com
Don Bateman 970.948.3757 don@bbconstruction.biz
conversion of existing retail space into a public locker room. existing bath will be relocated and 1 bathroom added. Modification of mechanical systems
787,577 2
414141414nana027,143 Per North of Nell PUD0Commercial Lodging N.O.N. PUD
4/15/2019
x jb 4/15/19
x
xx
x
x
x
x
2671.14
1237.25
1484.70
756.49
756.49
11574.94
1968.94
7219.56
17807.60
CL/PD. SERVICE USE ALLOWED ON GROUND FLOOR. PUBLIC MUST READILY BE ABLE TO RENT LOCKERS.
SV 07/09/19
BM 7/16/19
BM 7/16/19
PH 5/15/19
CH 5/8/19
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
970.343.0141Vail263 Gore Creek Drive
don@bbconstruction.biz
CO
970.948.3757Don Bateman
970.948.3757
555 E Durant
Gorsuch
don@bbconstruction.bizDon Bateman
970.948.3757
81657
Josh Baumgartner
Don Bateman Aspen CO
PO Box 2676 CO
PO Box 2676
970.456.2712Aspen
81612
jeffgorsuch@gorsuch.com
CA 94549
NA
Lafayette
81612
Pierce & Frye Architects936 Dewing Ave 970.949.0899
Carbondale CO
PO Box 2676 CO
970.510.0773Evolve Structural 81623
Baumgartner & Bateman Construction, Inc Aspen970.948.3757
1040 Main St
4.11.19
4.11.19
81612don@bbconstruction.biz
4/15/2019
FIRE
SPRINKLERS
REQUIRED
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
00 0
27 27,143
n
1414
1 1
2
Commercial
mechanical
4.11.19
4/15/2019
0025.2019.ACBK
X X
X
X
X
X
Locker Room with two accessible bathrooms, two changing rooms, and sitting area
Bonnie Muhigirwa 7/16/19
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Gorsuch Aspen - Locker Room
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-East and West Locker Room Areas (Common Space Types:Locker Room) 767 0.75 575
1.00 260 (b)Allowance: Decorative Appearance / Fix. ID: P 260 (a)
2-North Lobby Area (Common Space Types:Lobby - General) 101 0.90 91
3-South Lobby Area (Common Space Types:Lobby - General) 105 0.90 94
4-North Vanity Area and Toilet Compartment (Common Space Types:Restrooms) 105 0.98 103
5-South Vanity Area and Toilet Compartment (Common Space Types:Restrooms) 108 0.98 106
6-North Changing Room (Retail:Dressing/Fitting Room) 37 0.71 26
7-South Changing Room (Retail:Dressing/Fitting Room) 41 0.71 29
8-Cleaning and Storage Room (Common Space Types:Storage <50 sq.ft.) 20 1.24 25
1310Total Allowed Watts =
(a) Area claimed must not exceed the illuminated area permitted for this allowance type.
(b) Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less.
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
East and West Locker Room Areas ( Common Space Types:Locker Room 767 sq.ft.)
LED 26: HP-2: Finelite -Linear Direct/Indirec: Other: 1 48 10 504
Incandescent 1: P: Bover Siam 200: Other: 8 1 480 480
North Lobby Area ( Common Space Types:Lobby - General 101 sq.ft.)
LED 3: A4-40: Element Recessed Downlight - 4": Other: 1 3 18 54
South Lobby Area ( Common Space Types:Lobby - General 105 sq.ft.)
LED 3: A4-40: Element Recessed Downlight - 4": Other: 1 2 18 36
North Vanity Area and Toilet Compartment ( Common Space Types:Restrooms 105 sq.ft.)
LED 27: FM: Modern Forms Flush Mount: Other: 1 2 27 54
LED 29: S: Modern Forms Wall Sconce: Other: 1 1 21 21
South Vanity Area and Toilet Compartment ( Common Space Types:Restrooms 108 sq.ft.)
07/02/2019
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LED 27: FM: Modern Forms Flush Mount: Other: 1 2 27 54
LED 29: S: Modern Forms Wall Sconce: Other: 1 1 21 21
North Changing Room ( Retail:Dressing/Fitting Room 37 sq.ft.)
LED 27: FM: Modern Forms Flush Mount: Other: 1 1 27 27
South Changing Room ( Retail:Dressing/Fitting Room 41 sq.ft.)
LED 27: FM: Modern Forms Flush Mount: Other: 1 1 27 27
Cleaning and Storage Room ( Common Space Types:Storage <50 sq.ft. 20 sq.ft.)
LED 30: SM: WAC: Other:1 1 15 15
1293Total Proposed Watts =
Interior Lighting Compliance Statement
Interior Lighting PASSES
06/28/19
07/02/2019
COMMERCIAL REFERENCES FROM 2015 IBC
EU = enclosed usable space under stairs shall be 1-hr construction or stair
enclosure rating. No access from stair enclosure.1011.7.3
SG = safety glazing required sec 2406
V = ventilation required, including from bathrooms. sec 1203.1, IMC 402 & 403
GR = guards, 42” min ht, 4” max opening sec 1015
HR = handrails 34”-38” ht sec 1014
AS = risers shall be solid in accessible egress stairs sec 1011.5.5.3
DS = Draft stopping / fire blocking 718
RD = Roof drainage 1503.4
STC = Sound transmission class not less than 50 at dwelling separations, sec
1207
PD = protect against decay, sec 2304.12
REFERENCES FROM 2015 IMC
AS = access and service space for maintenance req’d, sec 306
MA = kitchen hood make up air required, sec 508
ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes,
501.3.1
IT= intake openings 10’ from lot line & contaminant sources (vents, streets),
401.4
D = fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
CA = combustion air not taken from bathrooms or storage, sec 303.3
REFERENCES FROM 2015 IECC
F = new or replacement glazing U factors may not exceed:
Fixed fenestration: U 0.29
Operable fenestration: U 0.37
Entrance doors: U 0.77
-Must have NFRC label or ASHRAE calcs, sec C402.4
REFERENCES FROM 2014 NEC
EP = electric panel ‘happy space’ 30”x36”x78”, not in storage, sec 110.26
IIIA
1
2
1
1
1
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
READ THIS OR FAIL YOUR INSPECTION!
Furred & Dropped Ceilings, Soffits, and Walls
20015 IBC 803.13
This applies to the attachment of finishes or furring to any
assemblies that are required to be either fire-rated or
non-combustible and is separate from the fire-rated
assembly requirement.
Walls, Ceilings & Soffits: If furred 1 ¾ inches or
less, do one of the following:
4.Fill spaces with Class A material.
5.Fill spaces with inorganic or non-combustible material.
6.Fire block 8 feet in all directions.
Walls: If set out (furred) greater than 1 ¾ inches,
do one of the following:
4.Use a Class A finish material (such as drywall).
5.Use non-combustible framing.
6.Protect both sides with fire sprinklers.
Ceilings & Soffits: If dropped (furred) greater
than 1 ¾ inches:
Framing members, hangers, and other assembly
members must be non-combustible. You may not
use wood.
In Type III and V construction only, you may use fire
retardant treated wood or non-combustible framing.
4/15/2019
2015 IBC 601 Fire Resistive Requirements for
Type of Construction: ____
Primary Structural Frame: ____hr
(columns, beams, girders, etc)
Exterior Bearing Walls: ____hr
Interior Bearing Walls: ____hr
Floors/Ceilings: ____hr
Roof : ____hr
Unless noted otherwise for occupancy separation or fire
separation distance.
IIIA
1
2
1
1
1
DAM 8/13/19
3
2. Approval of fabricator.Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication.Upon completion of fabrication, the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G. Building Department Responsibilities
1. Approve special-inspection program. The building department shall approve all
special inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, in
addition to that of the special inspector, must be obtained prior to placement of concrete,
covering of structural steel, or other similar materials.
3. Review inspection reports. The building official should review special-inspection
progress and final reports.
4. Perform final inspection. The building official should perform the final inspection and
approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been
reviewed and approved.
Project Address: __________________________________ Permit Number:______________________
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency:
__________________________
Owner:
__________________________
Engineer/ Architect:
__________________________
Contractor:
__________________________
Approved Fabricator:
__________________________
Inspected Fabricator:
__________________________
(circle one)
CITY OF ASPEN
PITKIN COUNTY:
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Printed Name:
__________________________
Printed Name
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Date:
__________________________
Date
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Jeff Gorsuch
Myers & CO Dennis Clemons
Myers & CO
Doug YoungWest Slope testing & inspection
4.11.19
Evolve Structural Brian Rossiter 4.11.19
Baumgartner & Bateman
Don Bateman 4.11.19
555 E Durant Ave
6.13.19
07/02/2019 3
2. Approval of fabricator.Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3.Completion of fabrication.Upon completion of fabrication, the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G.Building Department Responsibilities
1. Approve special-inspection program. The building department shall approve all
special inspectors and special-inspection requirements.
2.Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, in
addition to that of the special inspector, must be obtained prior to placement of concrete,
covering of structural steel, or other similar materials.
3.Review inspection reports. The building official should review special-inspection
progress and final reports.
4.Perform final inspection. The building official should perform the final inspection and
approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been
reviewed and approved.
Project Address: __________________________________ Permit Number:______________________
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency:
__________________________
Owner:
__________________________
Engineer/ Architect:
__________________________
Contractor:
__________________________
Approved Fabricator:
__________________________
Inspected Fabricator:
__________________________
(circle one)
CITY OF ASPEN
PITKIN COUNTY:
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Printed Name:
__________________________
Printed Name
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Date:
__________________________
Date
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Jeff Gorsuch
Myers & CO Dennis Clemons
Myers & CO
Doug YoungWest Slope testing & inspection 4.11.19
Evolve Structural Brian Rossiter 4.11.19
Baumgartner & Bateman
Don Bateman 4.11.19
6/13/2019
Dennis Clemons 6/13/2019
0025.2019.ACBK555 E. Durant Ave, Unit C-2
07/02/2019 3
2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication, the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G. Building Department Responsibilities
1. Approve special-inspection program. The building department shall approve all
special inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, in
addition to that of the special inspector, must be obtained prior to placement of concrete,
covering of structural steel, or other similar materials.
3. Review inspection reports. The building official should review special-inspection
progress and final reports.
4. Perform final inspection. The building official should perform the final inspection and
approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been
reviewed and approved.
Project Address: __________________________________ Permit Number:______________________
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency:
__________________________
Owner:
__________________________
Engineer/ Architect:
__________________________
Contractor:
__________________________
Approved Fabricator:
__________________________
Inspected Fabricator:
__________________________
(circle one)
CITY OF ASPEN
PITKIN COUNTY:
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Printed Name:
__________________________
Printed Name
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Date:
__________________________
Date
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Jeff Gorsuch
Myers & CO Dennis Clemons
Myers & CO
Doug YoungWest Slope testing & inspection 4.11.19
Evolve Structural Brian Rossiter 4.11.19
Baumgartner & Bateman Don Bateman 4.11.19
0025.2019.ACBK555 E. Durant Ave, Unit C-2
07/02/2019 07/02/2019
0025.2019.ACBK555 E. Durant Ave, Unit C-2
07/02/2019
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
2. Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
3. Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
2. Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2 07/02/2019
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
1
555 E Durant
07/02/2019