Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0025.2019 (28).ACBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK CL/PD. SERVICE USE ALLOWED ON MAIN FLOOR. PUBLIC MUST READILY BE ABLE TO RENT LOCKERS. NO EXTERIOR LIGHTING IN SCOPE OF WORK. NO CHANGES IN FENESTRATION. 11/16/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of WorkNewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL BuildingReview BuildingPermit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%)CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County UseTax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 10-21-19 0025.2019.ACBK 555 E Durant Ave C2-E 273718249021 Jeff Gorsuch 970 343 0141 jeffgorsuch@gorsuch.com Josh Baumgartner 970 456 2712 josh@bcbaspen.com delete 2 changing rooms and one vaniy, add lockers, relocate electric fireplace, eliminate south vestibule and new reflected ceiling plan $675,760 2 0 2 0 0 0 0 0 0 0 1 0 0 CL/PD 10/25/2019 0064.2019.ACBK LL SV 11/18/19 BM 11/26/19 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Construction Site:Owner/Agent:Designer/Contractor: Project Information Energy Code: Gorsuch Aspen - Locker Room Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 2-East and West Locker Room Areas (Common Space Types:Locker Room) 1033 0.75 775 1.00 400 (b)Allowance: Decorative Appearance / Fix. ID: L1 - L6 1003 (a) 1-North Vestibule (Common Space Types:Lobby - General) 112 0.90 101 3-North Vanity Area and Toilet Compartments (Common Space Types:Restrooms) 158 0.98 155 4-Cleaning and Storage Room (Common Space Types:Storage <50 sq.ft.) 18 1.24 22 1453Total Allowed Watts = (a) Area claimed must not exceed the illuminated area permitted for this allowance type. (b) Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less. Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures East and West Locker Room Areas ( Common Space Types:Locker Room 1033 sq.ft.) LED 3: A4-40: Element Recessed Downlight - 4": Other: 1 17 32 544 LED 4: A2-30 40: Element Recessed Downlight - 2": Other: 1 5 12 62 LED 32: L1 - L6: Low Voltage LED Tape light: Other: 1 2 200 400 North Vestibule ( Common Space Types:Lobby - General 112 sq.ft.) LED 3: A4-40: Element Recessed Downlight - 4": Other: 1 3 18 54 North Vanity Area and Toilet Compartments ( Common Space Types:Restrooms 158 sq.ft.) LED 3: A4-40: Element Recessed Downlight - 4": Other: 1 2 18 36 LED 27: FM: Modern Forms Flush Mount: Other: 1 2 27 54 LED 33: S: LED Side-lighted Mirror: Other: 1 2 67 134 Cleaning and Storage Room ( Common Space Types:Storage <50 sq.ft. 18 sq.ft.) LED 31: SM: WAC Surface Mount Light: Other: 1 1 15 15 1299Total Proposed Watts = 11/26/2019 bonniem Interior Lighting Compliance Statement Interior Lighting PASSES November 25, 2019 SEE NOTES #1 PLANS DAM 11/26/19 0064.2019.ACBK GORSUCH 555 EAST DURANT 2C 273718249021 1