Loading...
HomeMy WebLinkAboutFile Documents.720 W Smuggler St.0198.2019 (8).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 09/16/2019 NO EXTERIOR LIGHTING IN SCOPE OF WORK SEE NOTES #1 PLANS COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD / hereby certify that / have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. /t is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date /NSPEd/ONS: dŚe 'eneral ontractor ŵust scŚedule inspections online͘ Please ǀisit www͘aspenpitkin͘coŵͬDepartŵentsͬoŵŵunitLJ-Deǀelopŵent-Forŵsͬ to do so͘ ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). zou must take a test and complete the owner/building affidavit. (C/Tz USE KELz) Kwner builder approved by͗________________________Date͗______________________ Affidavit on file ADDRESS͗ ____________________________PERM/T EUMBER͗ _______________________________ August 2017 720 W. Smuggler Street Aspen, CO. 81611 (970)987-0906Zeph Williams Zeph@blueriverconstruction.net (970)987-0906Zeph Williams Zeph@blueriverconstruction.net Tom & Lesha Elsenbrook 720 W Smuggler St.Aspen CO 81611 (970)923-8530Willard Humphrey (970)618-1158 PO Box 5958 Snowmass Village CO 81615 Willard@humphrey.net (970)704-1963Joe Lawrenz (303)704-6145 PO Box 3788 Basalt CO 81621 Jlawrenz@blueriverconstruction.net (970)927-3036Karen White Interior Design (970)948-5019 227 Midland Ave, #15A Basalt CO 81621 studio@karenwhiteid.com (970)704-1963Blue River Construction LLC, Inc.(303)704-1963 PO Box 3378 Basalt CO 81621 Jlawrenz@blueriverconstruction.net William J Lawrenz Digitally signed by William J Lawrenz Date: 2019.08.29 10:57:36 -06'00'08/29/2019 09/16/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ Commerical Multi-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%) CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County Use Tax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Lavatory (Wash Basin) ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ____Laundry Bar, Utility Sink ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment ReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration. Unit Sq Ft: Gross square footage, not FAR, of permitted unit. Lot Size: Total surveyed square footage of property. Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed New Sq Ft: Total added square footage for additions to net livable or net leasable space. Building Footprint: Grade floor square footage of the permitted structure. Hardscape Area: Square footage of impervious lot surface. Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review • Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft • Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft • Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping • Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 08/29/2019 720 W. Smuggler Street Aspen, CO. 81611 2735-124-06-002 P & Q 14 Original Aspen Townsite Elsenbrook Joe Lawrenz (303) 704-6145 Jlawrenz@blueriverconstruction.net Remodel 4 bathrooms not included in original scope of work - new cabinetry, fixtures and lighting/switching design. Apply new tile veneer at lower level fireplace, no changes to fireplace appliance.445000 64 ■8 ■ 5211 ■ 450 4109 6000 100 0 1150 R6 Apply new tile veneer at lower level fireplace, no change to appliance. 09/16/2019 0198.2019.ARBK 25.00 x ll 9/16/19 x x x x SV 09.16.19 162.50 tf 10/2/19 sw 9/23/19 cs 10/4/19 0198.2019.ARBK ELSENBROOK 720 W SMUGGLER 2735124060022 MASTER PERMIT 0234.2018.ARBK DAM 10/10/19