HomeMy WebLinkAboutFile Documents.541 Race St.0084.2019 (4).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
04/23/2019
This project is on the 2009 IRC
SEE NOTES #1 PLANS
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
05/
2
0
/
2
0
1
9
nic
k
t
City of Aspen
130 South Galena Street, Aspen, Colorado 81611
Phone (970) 920-5090 Fax (970) 920-5440
Legal Description Block
Alternate Phone No.
CONTACT INFORMATION
Owner's Authorized Agent
Name Phone No.Alternate Phone No.
Mailing address City Zip
Mailing address
PLEASE PROVIDE ANY ADDITIONAL INFORMATION THAT MAY HELP US CONTACT YOU FOR ANY QUESTIONS REGARDING YOUR BUILDING PERMIT APPLICATION
Other Contact
Name Phone No.Alternate Phone No.
City Zip
PERMIT NO.
Permit TypeJob Address
Owner
PERMIT INFORMATION
Lot Tract or Subdivision Parcel ID (call 920-5160)
Name Phone No.Alternate Phone No.
City Zip
Name Phone No.
Mailing address
Mailing address City Zip
General Contractor
Mailing address City Zip
E-mail Address
E-mail Address
E-mail Address
Name Phone No.Alternate Phone No.
Zip
Architect or Designer of Record
Name Phone No.Alternate Phone No.
General / Building Permit Contact Sheet
E-mail Address
E-mail Address
Mailing address City Zip
E-mail Address
Landscape Architect of Record
Engineer of Record
Name Phone No.Alternate Phone No.
E-mail Address
Mailing address City
CO541 Race Alley / Aspen CO 81611
6 Fox Crossing 273707392007
Fox Crossing Properties Lots 4&6 LLC (281) 984-3091
6330 Mercer Street / Houston, TX / 77005
jgm@tcire.com
Willis Pember Architects Inc. 970.920.1727
412 N Mill St Aspen, CO 81611
willispa@comcast.net
Rudd Construction / Scott Duryea + Tim Thompson (970) 618-7200 (970) 927 4038 (ext.5)
Rudd Construction 132 Park Ave, Basalt, CO 81621
scott@ruddconstruction.com
Willis Pember Architects, INC / 970.920.1727 / 970 379 6074
412 N Mill St / Aspen, CO 81611
willispa@comcast.net
Lift Studio / 970.404.5610 (970) 404-5610
PO BOX 2748 / Aspen, CO / 81612
ryan@liftstudiolandscape.net
Evolve Structural Design (Sara Mickus) / 970.510.0773 (206) 910-7766
1040 Main Street / Carbondale, CO / 81623
steve@evolvestruct.com
Woody Creek Engineering, LLC / (970) 429-8297
520 E Hyman Ave #201 / Aspen, CO 81612
josh@woodycreekengineering.com
0034.2017.ARBK
4/01/2019
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__
UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
x
2009 IRC
X X X
X
X X
X
X
0 0 0
3774
1 1
3 bedrooms, 2 full baths, 1 3/4 bath, family room, laundry, 2 mechanical rooms,
1 bedroom, 1 full bath, 1 1/2 bath, kitchen, living, dining, 2 car garage
4 3
1 1
1
2
2
nt 5/20/19
0084.2019.ARBK
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
Special inspection is required per 2009 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
MANDATORY TESTING
REQUIRED
This construction project is required to
comply with the 2009 International
Energy Conservation Code. Residential
projects will require a blower door test
performed in the manner complying with
section 402.4.2.1 of the 2009 IECC.
External Energy Use Approved
RREMP CREMP
PERMIT #DATE
SNOWMELT _____________________________
POOL _____________________________
SPA _____________________________
OFFSET:________________________________
REMP SHEET: ___________________________
REVIEWED BY: _________________________
4
nickt
5/20/20190084.2019.ARBK
0 sqft
0 sqft
0 sqft
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
City of Aspen General / Building Permit Application
130 South Galena Street, Aspen, Colorado 81611
Phone (970) 920-5090 Fax (970) 920-5440
Legal Description Block
Address
Owner's Authorized Agent Phone No.Alternate Phone No.E-mail
E-mail
Permit Type: BD CO DE FD FN MH MS RF SN
Census Code Occupancy Group Lot Area Zone District No. of Stories
Parks Energy Code Ped. Amenity Fee
Water Eng. Sys. Dev.School Ded.
Sanitation Permit Fee TDM Impact
CMP Plan Check Zoning
Fire District REMP Other
Other Water Tap Other
RECEIPTS PLEASE CALL IN INSPECTION TO (970) 920-5448
Architect Phone No.Alternate Phone No.
License No.
Date
Two sets of 24" x 36" drawings and one set of 11" x 17" drawings, drawn to scale, must accompany this application.
No. of Dwellings
FOR CITY USE ONLY
Deed Restricted
Zoning
HPC
City Use Tax
THIS IS A PERMIT ONLY
WHEN VALIDATED. WORK
STARTED WITHOUT PERMIT
WILL BE DOUBLE FEE.
Use of Building:
Class of Work:
Valuation of Work $Existing Sq. Ft. of Unit:Sq. Ft. This Permit:Food Service in this Building?
Date:
Alarm System Req.Fire Sprinkler Req.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of
construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes.
USE TAX:The General Contractor or Owner Builder is required to pay a Use Tax Deposit to both the City of Aspen (2.1%, first $100,000 is exempt) and Pitkin County (0.5%,noexemption)on the building
permit at the time of issuance. All sub-permits pulled under a building permit are paid by this deposit payment and should not pay use tax.
Occupancy Load Type of Construction:
Owner Signature (if Owner/Builder)Print Name
Presubmittal by:
NOTICE: Separate permits are required for electrical, plumbing or mechanical work. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if
construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced.
Cost
General Contractor Phone No.E-mail
PLANS LOCATION #
Historic Property?HPC Certificate of Appropriateness
Lot Tract or Subdivision Parcel ID (call 920-5160)
Best Contact Name/Phone/Cell Phone/E-mail
Phone No E-mail
Contractor Signature Print Name Date
Description of work:
Owner
Job Address
County Use Tax
Application Accepted by:
Date:
Date:
Plan Check by:
Date:
Approved for issuance by:
Date:
Size of Building (Total Sq. Ft.)No. of Parking Spaces
covered: uncovered:
No. Bedrooms added:No. Bathrooms added:
Cost
Aspen San. Dist.
Engineering
FEES
BUILDING FEES ZONING FEES
PERMIT NO.
Park Impact
Issued by:
APPROVALS Authorized by:Date FEES
G.I.S.
Housing Cash-in-lieu
Env. Health
yes no
Single Family Multi-Family Commercial/Residential Commercial
OtherNewAdditionAlterationRepair
Other
nonoyesyes noyesyes
Move Tenant Finish Demo
no
541 Race Alley Aspen, CO 81611
4&6 273707392007
Willis Pember / Willis Pember Architects LLC / 970.920.1727 / willispa@comcast.net
Fox Crossing Properties Lots 4&6 LLC / 6330 Mercer Street / Houston, TX 77005 (John Morton)
Willis Pember / Willis Pember Architects LLC / 970.920.1727 / willispa@comcast.net
Rudd Construction / Scott Duryea 970 927 4038 ext. 5 scott@ruddconstruction.com 7630
Willis Pember / Willis Pember Architects LLC / 970.920.1727 / willispa@comcast.net
-$96,250 1511 3621.8
4
4
4
Changes to the permit occurred for three reasons;
a. value engineering b. changes driven by site conditions following excavation and c. refinements to the
HVAC design.
Value engineering items include:
1. eliminating south property line retaining wall.
2. raised corner of 'L' shaped interior court walls by 16".
3. eliminate AIA industries greenhouse construction; replace with solid roofs and
a skylight at connectors.
4. replace all Quantum windows with Loewen. New skylight by Wasco.
5. revised roof framing - eliminate tube steel roof bents and replace with LVL
2x8's.
6. elimination of outdoor fireplace and concrete bench @ lower level terrace.
Changes based on new site conditions include a revised drainage design- (ref.
civil):
1. pump vault changed location
2. discharge line routed N instead of S.
court-well yard trench drain changed inlets.
3. an alternate pump is specified
Refinements to the HVAC design include:
1. ERV intake location changed.
2. radiant heat in lower level slab is provided.
3. boiler location changed.
4. reduced load in dining room and stair well following elimination of greenhouse construction.
5. Elimination of make-up air (MUA). Range hood is lees than 400cfm.
0034.2017.ARBK
Tim Thompson 3.18.19
na
4/01/2019
0084.2018.ARBK
x
x
x
x
jb
BN 4/23/19
0
0
0
0
0
650
NT
5/20/19
3774
x x
IRC VB
AS 7/08/19
JD 5/21/19
DR 9/10/19
0084.2019.ARBK
FOX CROSSING PROPERTIES LOTS 4
541 RACE ALY
273707392007
4/01/2019
DAM
9/13/19