Loading...
HomeMy WebLinkAboutFile Documents.541 Race St.0197.2019 (6).ARBKWPA  | #1403 |March 24th, 2020 |541 Race Alley, Lot 6 Fox Crossing Subdivision, Aspen, CO 81611          03/24/2020 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 08/28/2019 0197.2019.ARBK FOX CROSSING PROP LOTS 4 & 6 541 RACE ALY 273707392006 10/04/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of WorkNewAdditionAlterationRepair ________YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact EngineeringReview Zoning Review (50%)School Lands Dedication Zoning Review (50%)CMP (50%)TDM Impact Energy CodeReview REMPPayment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County Use Tax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 8.26.19 0034.2017.arbk 0197.2019.ARBK 541 Race Alley - line shacks na 273707392007 #6 fox crossing subdivision John Morton (713) 299-7674 jgm@tcire.com Willis Pember (970) 379-6074 willispa@comcast.net 547.98 SF of added hydro snow-melt to exterior hardscape areas. Paving areas already approved under permit app and HPC land use review. No change to approved hardscape finish materials. $11,250 5 3 6 n 4 1 1 1 6,068 na 6,068 sf 1 0 net zero net zero 2,247.7 sf 1 1 547.98SF R6 X PL 9.10.19 X Jpo 10/4/19 X X 25.00 0 0 0 0 0 X 08/28/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 541 Race Alley - line shacks 0197.2019.ARBK 281 984 3091john morton 713 299 7674 6330 Mercer st Houston TX 77005 jgm@tcire.com 970 920 1727willis pember 970 379 6074 412 n mill st aspen co 81611 willispa@comcast.net 970 927 4038scott duryea - rudd construction 970 618 7200 132 park ave basalt co 81621 scott@ruddconstruction.com 970 920 1727willis pember architects 970379 6074 412 n mill st aspen CO 81611 willispa@comcast.net 970 429 8297Woody Creek engineering 970 309 7130 PO Box 575 woody creek co 81656 josh@woodycreekengineering.com 970 510 0773Evolve structural design (206) 910-7766 1040 main st carbondale co 81623 steve@evolvestruct.com 970 927 9119Rudd Construction 132 Park Avenue basalt co 81621 scott@ruddconstruction.com 8.26.19 8.26.19 08/28/2019 External Energy Use Approved RREMP CREMP PERMIT #DATE SNOWMELT _____________________________ POOL _____________________________ SPA _____________________________ OFFSET:________________________________ REMP SHEET: ___________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) x 0197.2019.ARBK 11/22/2019 548 0 0 A201, A202 0 TF SEE NOTES #1 PLANS TF TF 11/22/19 11/22/19 FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 1 2 MASTER PERMIT 0034.2017.ARBK CHANGE ORDER 1: 0084.2018.ARBK CHANGE ORDER 2: 0197.2019.ARBK WPA | willis pember architects, inc  412 n mill street   |  aspen, co  81611  |  970 920 1727    City of Aspen                                       1.15.20  Building Department  120 Galena Street  Aspen, CO  81611    RE: Permit # 0197.2019.arbk_additional Narrative_ CHANGE ORDER #2    Dear Building Officials,    In addition to the REMP fee calculation and layout drawings previously submitted (11/19) please accept  this letter as a further explanation of additional items relating to Change Order 2. Further, no  intersection with previous approvals or agencies is anticipated.     1. Minor framing changes are proposed on the main level floor; in the dining room #102, at the  stair opening #105 and at the master bathroom shower, rm #111.  Please reference Structural  drawing S1.02. Changes to the framing are clouded as change # 2.    2. S1.01 – Lower level framing and foundation plan.  Rudd Construction would like to propose  changes described on this sheet.  We propose a gas line chase from the lower level mechanical  room # 014, up onto the West wall of the Garage 101. It will be in an accessible chase  throughout.    3. Relocation of a drain line from under a tree drip‐line at the edge of Fox Crossing Park.  This was  requested by Dave Radeck and incorporated into the civil design by Josh Rice. Please reference  further revisions to the Civil design.  CO #2 changes highlighted in yellow on sheets C2.0 and  C3.1.    If you require anything further, please advise.    Very truly yours,        Willis Pember, AIA        Applicant:  Fox Crossing Lots #4& 6, LLC                     Representative:     Willis Pember Architects, Inc   John Morton      Willis Pember   6330 Mercer St      412 N. Mill Street        Houston, TX 77005     Aspen, CO 81611c    713 299 7674 vc   970 920 1727 vc    Cc: Scott Duryea, Rudd Construction          02/21/2020 MINIMUM BOILER AFUE: 85% This Project is on the 2009 IRC 06/23/2020 justinhWPA  | #1403 |March 24th, 2020 |541 Race Alley, Lot 6 Fox Crossing Subdivision, Aspen, CO 81611        541 RACE ALLEY   SNOW/ICE PROTECTION         To  Permit coordinators, Stephen Kanipe  From  Willis Pember Architects  Subject  Snow and Ice protection of meters, equipment  Date  3.24.20      Re: Gas Meter    Gas meters and other equipment are located along the north wall of the garage under a 16” overhang of  the garage roof.  The gas meter will be mounted directly on the wall and will be entirely under the  overhang.        Best regards,          Willis Pember, AIA                                      03/24/2020 03/24/2020 From:Dale Abbott To:willis pember Cc:Scott Duryea Subject:541 Date:Tuesday, March 03, 2020 3:50:24 PM Attachments:IMG_3303.jpgATT00001.txtIMG_3302.jpgATT00002.txtIMG_3301.jpgATT00003.txt Willis I do believe this is our inspection sheet for Mitch Miller’s walk-through special inspections wasrequested to see if this was possible and or acceptable by the building department as I recall MitchMiller did not have a problem with the way we ran these utilities due to the fact that we had no otheraccess around the garage steel The perimeter of the dirt and dug a hole is reinforced by ABS 18 inchpipe with sleeves and separation Hopefully this is suffice for the building department for it was our Bestoption 03/24/2020 03/24/2020 03/24/2020 06/23/2020 justinh 03/24/2020