HomeMy WebLinkAboutFile Documents.802 E Cooper Ave.0011-2020-BCHO (13)These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0011-2020-BCHO
802 E Cooper LLC
802 E Cooper #1
273718228030
02/25/2020
stephenk
SEE NOTES #1 PLANS
0088.2019.ARBK
1/29/20
02/07/2020