Loading...
HomeMy WebLinkAboutFile Documents.711 E Cooper Ave.0115.2018 (5).ACBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 28085 04/15/2019 4/22/2019 28085 04/15/2019 4/22/2019 05/03/2019 nickt External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ x 0115.2018.ACBK 5/3/19 0 0 0 NT 11/1/2018 11/1/2018 0 0 0 NT 5/3/19 09/13/2019 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 11/1/2018 0115.2018.ACBK 325 3253436.61 3916.25 810 968.35 968.35 6025 450 840 x jb 11/1 x x x x x x x 437 Dr 4/4/19 rm/dr 4/19/19 NT 5/3/19 0 JPo 9/13/19 pj 9/12/19 ar 1/9/19 DAM 10/14/19 11/04/2019 12/18/2019