HomeMy WebLinkAboutFile Documents.232 E Main St.0132.2018 (101).ACBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
12/05/2019
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0132.2018.ACBK 11/26/19
0
0
0
N/A
NT
MANDATORY TESTING
REQUIRED
This construction project is required to
comply with the 2015 International
Energy Conservation Code.
Commercial projects will require a
blower door test performed in the
manner complying with section C402.5
of the 2015 IECC.
Maximum 0.40 cfm/sqft at 75 Pa.
CORE AND SHELL PERMIT.
TENANT FINISHES ON
SEPARATE PERMITS
Air Pollution Control Division – Indoor Environment Program – Asbestos/IAQ Air Unit
4300 Cherry Creek Drive South, APCD-IE-B1
Denver, Colorado 80246-1530
Phone: 303-692-3100 – Fax: 303-782-0278
E-mail: asbestos@state.co.us
Colorado Department of Public Health and Environment
Approval issued on: 10/3/2018
Record number: 142138 $60.00
Check number: 050508Notice Number: 18PI6713D
For the location specified below:
Conoco Gas Station
232 E. Main St.
Aspen
Pitkin County
This notice has been issued to:
Stutsman - Gerbaz Earthmoving
Issued by: TS
Asbestos Building Inspector:
Inspection Date:06/06/2017
Fee Paid:
30376 Hwy 82
Snowmass, CO 81654
DEMOLITION APPROVAL NOTICE
This approval notice is granted subject to Colorado Air Quality Control Commission Regulation
No. 8, Part B, adopted December 21, 2007, and effective January 30, 2008 and the Colorado Air
Pollution Prevention and Control Act C.R.S. (25-7-101 and 25-7-501 et seq). This notice signifies
that the structure was inspected for asbestos, luminous exit signs (containing radioactive material),
and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the
Colorado Department of Public Health and Environment pursuant to Regulation No. 8, Part B.
THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES.
Immediately notify the Asbestos/IAQ Unit of project modifications by fax (number above) or e-mail
(address above) and the appropriate county health department by fax. Project modifications include
changes in the scope of work or the scheduled work dates, etc.
This demolition approval notice is valid beginning 3/1/2019.
The actual scheduled work dates are from 3/1/2019 through 4/1/2019.
Please note that certain asbestos-containing materials (ACM) may remain in the structure
during demolition. Therefore, any demolition debris left behind after the completion of post-
demolition site cleanup may constitute a "reason to know of asbestos-contaminated soil" at
the site, subject to the requirements of Section 5.5 of the Solid Waste Regulations (6 CCR
1007-2, Part 1).
As a contractor, you may be subject to other demolition licenses and permits, depending on the
requirements of the county and municipality in which the work is being performed. The Colorado
Department of Public Health and Environment, Air Pollution Control Division, strongly suggests
that you check with county and municipal authorities in order to determine any other local
building/permitting requirements that must be met.
Brian Guzman
21876Cerification No.:
09/06/2019
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level ________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__
UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
X
X X
X
X
X X X
X
X
828 SF
X
5,709 SF N/A
57 TOTAL
2 0
0 0 0
0 0
0 0
0 0
00
575 SF
N/A
SPACE 'A' - FUTURE BUSINESS USE, SPACE 'B' - FUTURE BUSINESS USE, AND
MECH. ROOM.
SPACE 'B' - FUTURE BUSINESS USE
N/A
N/A
9-4-18
X
1
_____
2
BRANCH BANK TENANT SPACE
12/26/2018
0132.2018.ACBK
3346sqft + 907sqft roof & gutter deicing
5353
54, subject to TI
NT 1/13/20
01/
1
3
/
2
0
2
0
nic
k
t
FIRE
SPRINKLERS
REQUIRED
0 0 0
The State of Colorado has specific
requirements that must be met during the
removal and abandonment of Fuel Storage
Tanks. All criterion must be met during tank
removal including soil testing, observation, and
disposal.
0132.2018.ACBK
232 EAST MAIN STREET LLC
232 EAST MAIN STREET
273707320008
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
03/06/2020
03/06/2020
03/06/2020
09/06/2019
0132.2018.ACBK
09/06/2019
Myers & Company Dennis Clemons 08/20/2019
09/06/2019
NICK THOMPSON 1/13/20
0132.2018.ACBK
01/
1
3
/
2
0
2
0
nic
k
t
COMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit Date:1/2018
Vertical Glazing / Wall Area:29%
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
232 E. MAIN ST.
Aspen, CO 81611
Owner/Agent:
Brad Hribar
Centaur Construction
1200 W Lake St Suite 200
Chicago, IL 60607
312-714-8519
bhribar@centaurco.com
Designer/Contractor:
Steve Coughlin
modif. architecture
1229 N. North Branch Street Suite
206
Chicago, IL 60642
708-261-2611
steve.coughlin@modifarchitecture.c
om
Project Information
Energy Code:
232 MAIN ST.
1%Skylight / Roof Area
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Building Area Floor Area
1-Ground Floor (Retail) : Nonresidential 4445
2-Second Floor (Office) : Nonresidential 1600
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1 wood shigle roof (type 1): Attic Roof with Wood Joists, [Bldg.
Use 2 - Second Floor]
2393 19.0 23.6 0.023 0.021
Roof 2 gable roof (type 2): Insulation Entirely Above Deck, [Bldg. Use 1
- Ground Floor]
2142 ---23.6 0.041 0.028
Skylight 1: Metal Frame with Thermal Break:Glass, No Curb, Perf.
Type: Energy code default, Double Pane, Clear , SHGC 0.70, VT 0.60,
[Bldg. Use 1 - Ground Floor]
62 ------1.100 0.500
Roof 2 second level plaza deck floor (type 3): Insulation Entirely Above
Deck, [Bldg. Use 1 - Ground Floor]
1200 ---8.6 0.107 0.028
Floor 1 (type 2A): Slab-On-Grade:Unheated, [Bldg. Use 1 - Ground
Floor] (d)
275 ------0.730 0.520
NORTH
Exterior North Wall (type D): Concrete Block:8", Partially Grouted, Cells
Empty, Normal Density, Furring: Metal, [Bldg. Use 1 - Ground Floor]
603 0.0 15.0 0.055 0.071
Door 1: Insulated Metal, Swinging, [Bldg. Use 1 - Ground Floor]21 ------0.660 0.370
Exterior NorthWall (type C6): Steel-Framed, 16" o.c., [Bldg. Use 2 -
Second Floor]
167 19.0 15.0 0.041 0.064
Exterior North Wall (type D2): Concrete Block:8", Partially Grouted,477 0.0 15.0 0.055 0.071
Project Title:
Data filename:
232 MAIN ST.
C:\Users\mwarnes\Modif Dropbox\Aspen\2016-005 232 E Main St\municipal\ComCheck\232 MAIN
ST 3-12-19_permit comments.cck
01/13/20Report date:
131 ofPage
01/13/2020
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Cells Empty, Normal Density, Furring: Metal, [Bldg. Use 1 - Ground
Floor]
Door 9: Insulated Metal, Non-Swinging, [Bldg. Use 1 - Ground Floor]90 ------0.140 0.179
EAST
Exterior East Wall (type C8): Steel-Framed, 16" o.c., [Bldg. Use 1 -
Ground Floor]
807 25.0 20.0 0.032 0.064
Window 4 around door C-1: Metal Frame with Thermal Break:Fixed,
Perf. Specs.: Product ID PORTELLA, SHGC 0.25, PF 0.14, VT 0.34,
[Bldg. Use 1 - Ground Floor] (c)
41 ------0.290 0.290
Window 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID PORTELLA, SHGC 0.25, PF 0.14, VT 0.34, [Bldg. Use 1 -
Ground Floor] (c)
97 ------0.290 0.290
Window 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID PORTELLA, SHGC 0.25, PF 0.14, VT 0.34, [Bldg. Use 1 -
Ground Floor] (c)
97 ------0.290 0.290
Window 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID PORTELLA, SHGC 0.25, PF 0.14, VT 0.34, [Bldg. Use 1 -
Ground Floor] (c)
108 ------0.290 0.290
Window 10: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID KAWNEER, SHGC 0.27, PF 0.33, VT 0.56, [Bldg. Use 1 -
Ground Floor] (c)
22 ------0.340 0.290
Door 4 (type C-1): Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID PORTELLA, SHGC 0.22, PF 0.14, VT 0.45,
[Bldg. Use 1 - Ground Floor] (c)
66 ------0.350 0.770
Exterior East Wall (type B1): Steel-Framed, 16" o.c., [Bldg. Use 1 -
Ground Floor]
476 0.0 15.0 0.056 0.064
Window 10: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID PORTELLA, SHGC 0.25, PF 0.14, VT 0.34, [Bldg. Use 1 -
Ground Floor] (c)
54 ------0.290 0.290
Window 9 around door: Metal Frame with Thermal Break:Fixed, Perf.
Specs.: Product ID PORTELLA, SHGC 0.25, PF 0.14, VT 0.34, [Bldg.
Use 1 - Ground Floor] (c)
45 ------0.290 0.290
Door 3 (type C): Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID PORTELLA, SHGC 0.22, PF 0.14, VT 0.34,
[Bldg. Use 1 - Ground Floor] (c)
63 ------0.350 0.770
Exterior East Wall (type D): Concrete Block:8", Partially Grouted, Cells
Empty, Normal Density, Furring: Metal, [Bldg. Use 1 - Ground Floor]
35 0.0 15.0 0.055 0.071
SOUTH
Exterior South Wall (Curtain Wall): Steel-Framed, 16" o.c., [Bldg. Use 1
- Ground Floor]
1224 19.0 0.0 0.109 0.064
Window 1: Other Window:Fixed, Perf. Specs.: Product ID KAWNEER,
SHGC 0.27, PF 0.33, VT 0.56, [Bldg. Use 1 - Ground Floor] (c)
506 ------0.340 0.290
Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID PORTELLA, SHGC 0.22, PF 0.33, VT 0.34, [Bldg.
Use 1 - Ground Floor] (c)
60 ------0.350 0.770
Door 2 -1: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product ID Nanawall HSW60, SHGC 0.27, PF 0.33, VT
0.33, [Bldg. Use 1 - Ground Floor] (c)
84 ------0.340 0.770
Door 2 -2: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product ID Nanawall HSW60, SHGC 0.27, PF 0.33, VT
0.33, [Bldg. Use 1 - Ground Floor] (c)
290 ------0.340 0.770
WEST
Exterior West Wall (type A4): Concrete Block:8", Partially Grouted, Cells
Empty, Normal Density, Furring: Metal, [Bldg. Use 1 - Ground Floor]
1225 0.0 15.0 0.055 0.071
Exterior West Wall (type C6): Steel-Framed, 16" o.c., [Bldg. Use 2 -
Second Floor]
476 19.0 15.0 0.041 0.064
Window 13: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID KAWNEEER, SHGC 0.27, VT 0.56, [Bldg. Use 2 - Second
6 ------0.340 0.290
Project Title:
Data filename:
232 MAIN ST.
C:\Users\mwarnes\Modif Dropbox\Aspen\2016-005 232 E Main St\municipal\ComCheck\232 MAIN
ST 3-12-19_permit comments.cck
01/13/20Report date:
132 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Floor] (c)
Window 12 around door D: Metal Frame with Thermal Break:Fixed,
Perf. Specs.: Product ID PORTELLA, SHGC 0.25, VT 0.34, [Bldg. Use
2 - Second Floor] (c)
48 ------0.290 0.290
Door 5 (type D): Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID PORTELLA, SHGC 0.22, VT 0.45, [Bldg. Use
2 - Second Floor] (c)
42 ------0.350 0.770
Exterior West Wall (type D): Concrete Block:8", Partially Grouted, Cells
Empty, Normal Density, Furring: Metal, [Bldg. Use 1 - Ground Floor]
74 0.0 15.0 0.055 0.071
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)'Other' components require supporting documentation for proposed U-factors.
(c)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 4% better than code
Project Title:
Data filename:
232 MAIN ST.
C:\Users\mwarnes\Modif Dropbox\Aspen\2016-005 232 E Main St\municipal\ComCheck\232 MAIN
ST 3-12-19_permit comments.cck
01/13/20Report date:
133 ofPage
STEVE COUGHLIN - PRINCIPAL 1-13-2020
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0132.2018.ACBK
Permit Date:2019
Construction Site:
232 East Main Street
Aspen, CO 81611
Owner/Agent:
Brad Hribar
Centaur Construction
1200 W Lake St Ste 200
Chicago, IL 60607
3127148519
bhribar@centaurco.com
Designer/Contractor:
Zachary Gains
AEC
9707488520
zach@aec-vail.com
Project Information
Energy Code:
232 East Main Street
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Retail:Sales Area 4302 1.43 6152
6152Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-Retail:Sales Area
LED 1: Fixture Type F: Other:1 20 42 840
840Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES: Design 86% better than code
Project Title:
Data filename:
232 East Main Street
P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical
COMcheck.cck
12/18/19Report date:
71 ofPage
Zachary Gains 12/18/19
12/20/2019
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0132.2018.ACBK
Permit Date:2019
Construction Site:
232 East Main Street
Aspen, CO 81611
Owner/Agent:
Brad Hribar
Centaur Construction
1200 W Lake St Ste 200
Chicago, IL 60607
3127148519
bhribar@centaurco.com
Designer/Contractor:
Zachary Gains
AEC
9707488520
zach@aec-vail.com
Project Information
Energy Code:
232 East Main Street
4 (High activity metropolitan commercial district)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Main entry 90 ft of door 30 Yes 2700
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
2700
2700
1300
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 1300 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Main entry (90 ft of door width): Tradable Wattage
LED 1: FIXTURE A: Other:1 11 17 187
LED 2: FIXTURE B: Other:1 2 10 21
LED 3: FIXTURE H: Other:1 1 25 25
233Total Tradable Proposed Watts =
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 94% better than code
Project Title:
Data filename:
232 East Main Street
P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical
COMcheck.cck
12/18/19Report date:
72 ofPage
Zachary Gains 12/18/19
12/20/2019
COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No..0132.2018.ACBK
Permit Date:2018
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
232 E Main St
Aspen, CO 81611
Owner/Agent:
Brad Hribar
Centaur Construction
1200 W Lake St Suite 200
Chicago, IL 60607
3127148519
bhribar@centaurco.com
Designer/Contractor:
Bryan Urban
AEC
40801 US Hwy 6
Ste 214
Avon, CO 81620
970-748-8520
burban@aec-vail.com
Project Information
Energy Code:
232 E Main Core and Shell
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Central Furnace, Gas, Capacity = 150 kBtu/h
Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Single Package DX Unit, Capacity = 73 kBtu/h, Evaporatively Cooled Condenser, Air Economizer
Proposed Efficiency = 12.80 EER, Required Efficiency: 11.90 EER + 12.1 IEER
Fan System: RTU-1 FAN -- Compliance (Brake HP method) : Passes
Fans:
RTU 1 FAN Supply, Multi-Zone VAV, 3000 CFM, 5.0 motor nameplate hp, 2.4 design brake hp (2.4 max. BHP), 80.0 fan efficiency
grade
1 RTU-1 (Multiple-Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 150 kBtu/h
Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Single Package DX Unit, Capacity = 87 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 13.50 EER, Required Efficiency: 11.00 EER + 12.6 IEER
Fan System: RTU-1 FAN -- Compliance (Brake HP method) : Passes
Fans:
RTU 1 FAN Supply, Multi-Zone VAV, 3000 CFM, 5.0 motor nameplate hp, 2.4 design brake hp (2.4 max. BHP), 80.0 fan efficiency
grade
1 RTU-2 (Multiple-Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 72 kBtu/h
Proposed Efficiency = 82.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Single Package DX Unit, Capacity = 30 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 15.50 SEER, Required Efficiency: 14.00 SEER
Fan System: RTU-3 FAN -- Compliance (Brake HP method) : Passes
Fans:
RTU 3 FAN Supply, Multi-Zone VAV, 1380 CFM, 1.5 motor nameplate hp, 0.9 design brake hp (0.9 max. BHP), 80.0 fan efficiency
grade
1 RTU-3 (Multiple-Zone):
Project Title:
Data filename:
232 E Main Core and Shell
P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Mechanical
COMcheck.cck
12/18/19Report date:
171 ofPage12/20/2019
Quantity System Type & Description
Heating: 1 each - Central Furnace, Gas, Capacity = 72 kBtu/h
Proposed Efficiency = 82.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Single Package DX Unit, Capacity = 41 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.40 SEER, Required Efficiency: 14.00 SEER
Fan System: RTU-4 FAN -- Compliance (Brake HP method) : Passes
Fans:
RTU 4 FAN Supply, Multi-Zone VAV, 2000 CFM, 3.0 motor nameplate hp, 1.8 design brake hp (1.8 max. BHP), 80.0 fan efficiency
grade
1 RTU-4 (Multiple-Zone):
Heating: 1 each - Unit Heater (UH-1), Electric, Capacity = 3 kBtu/h
No minimum efficiency requirement applies
Fan System: None
3 UH-1 (Single Zone):
Heating: 1 each - Unit Heater (UH-2), Electric, Capacity = 5 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 UH-2 (Single Zone):
Heating: Hot Water Boiler, Capacity 1250 kBtu/h, Gas
Proposed Efficiency: 95.00 % Et, Required Efficiency: 80.00 % Et
1 Boiler-1:
Electric Storage Water Heater, Capacity: 7 gallons
Proposed Efficiency: 2.00 SL, %/h (if > 12 kW), Required Efficiency: 4.16 SL, %/h (if > 12 kW)
1 WH-1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
232 E Main Core and Shell
P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Mechanical
COMcheck.cck
12/18/19Report date:
172 ofPage
Bryan Urban 12/18/19
12/20/2019
01/
1
3
/
2
0
2
0
nic
k
t