Loading...
HomeMy WebLinkAboutFile Documents.232 E Main St.0053-2020-BCHOThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 1 0053-2020-BCHO 232 EAST MAIN STREET FIRE SPRINKLERS REQUIRED