Loading...
HomeMy WebLinkAboutFile Documents.503 W Main St.0121.2019 (5).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 05/09/2019 0121.2019.ARBK HESSIAN ASPEN LLC 503 W MAIN ST #B-102 273512449014 2015 IBC 601 Fire Resistive Requirements for Type of Construction: ____ Primary Structural Frame: ____hr (columns, beams, girders, etc) Exterior Bearing Walls: ____hr Interior Bearing Walls: ____hr Floors/Ceilings: ____hr Roof : ____hr Unless noted otherwise for occupancy separation or fire separation distance. Dwelling Separation Required - 2015 IBC -708 Fire Partitions, 711 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. Exhaust fans require ceiling radiation damper. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. RESIDENTIAL REFERENCES FROM 2015 IBC CV/CS = crawl space ventilation sec. 1203.4. 18” x 24” access required 1209.1 EE = emergency escape required sec 1030 EU = enclosed usable space under stairs shall be 1-hr construction or stair enclosure rating. No access from stair enclosure. ½” gypsum permitted for stairs inside a single dwelling unit. 1011.7.3. RV = roof and rafter ventilation required 1203.2 A = Attic Access 20” x 30” 1209.2 SA = smoke alarm (NFPA 72) required sec 907.2.11 CO = carbon monoxide detector req. per Aspen Municipal Code 8.15 SG = safety glazing required sec 2406 V = mechanical ventilation required sec 1203.1 & IMC 403 (bath fans and whole house ventilation) GR = guards, 42” min ht, 4” max opening. Guards within dwelling unit 36” min ht sec 1015 HR = handrails 34”-38” ht sec 1014 DS = Draft stopping / fire blocking 718 RD = Roof drainage 1503.4 STC = Sound transmission class not less than 50 at dwelling separations, sec 1207 SI = Stairway Illumination 1205.4 PD = protect against decay, sec 2304.12 REFERENCES FROM 2015 IMC DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement fenestration shall not exceed 0.28 U-factor, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 05/09/2019 VB 0 0 0 0 0 05/09/2019 Per contractor, drywall is not being replaced at the party wall. If this changes, contact the Building Department for a listed/tested assembly. FIRE SPRINKLERS REQUIRED Maintain existing fire sprinkler coverage 05/22/2019 bonniem 0121.2019.ARBK x PL 5.20.19 x x x x 25.00 503 05/09/2019 BM 5/22/19 BM 5/22/19 BM 5/22/19 DAM 5/22/19 05/09/2019 05/09/2019 05/09/2019 05/09/2019