HomeMy WebLinkAboutFile Documents.1322 Snowbunny Ln.0291.2018 (34).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
12/13/2018
12/13/2018
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
Electric vehicle charging (IRC 309.6).
Newly constructed one- or two-family dwellings and townhouses with a dedicated attached or
detached garage shall facilitate future installation and use of electric vehicle chargers. For each
dwelling unit, a 208/240-volt individual branch circuit or a listed raceway to accommodate a future
individual branch circuit shall be installed. The raceway shall not be less than trade size 1 (nominal
1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall
terminate into a listed cabinet, box or other enclosure, and in close proximity to the proposed
location of the electric vehicle charger. Raceways are required to be continuous at enclosed,
inaccessible or concealed areas and spaces. The service panel or subpanel circuit directory shall
provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s) reserved to
permit installation of a branch circuit overcurrent device. Electrical vehicle supply equipment shall be
installed in accordance with NFPA 70. 20
Exception: Additions and alterations to existing one- or two-family dwellings and townhomes
constructed per the IRC are exempt from this requirement.
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
05/31/2019
justinh
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0290/0291.2018.ARBK 5/31/19
0
0
0
N/A
N/A
N/A
JH
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU?
# Living Rooms_____
# Kitchens _____
# Full Baths _____
# 3/4 Baths _____
# 1/2 Baths _____
# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
Yes
No
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M
IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
January 2018
2015 IEBC
(As Adopted
and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
0 00
2 0
1 0 0
2
1
1 0
2 0
NA
1322 Snowbunny (WEST UNIT)
12/13/2018
8071 3083
1 BEDROOM, 3/4 BATH, 1/2 BATH, GARAGE, KITCHEN, DINING ROOM, LIVING ROOM, LAUNDRY ROOM
BEDROOM, 3/4 BATH
2
JH 6/19/19
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU?
# Living Rooms_____
# Kitchens _____
# Full Baths _____
# 3/4 Baths _____
# 1/2 Baths _____
# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
Yes
No
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M
IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
January 2018
2015 IEBC
(As Adopted
and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
0 00
2 1
2 0 0
5
2
1 0
3 0
1320 Snowbunny (EAST UNIT)
12/13/2018
8071 4988
JH 6/19/19
3 BEDROOMS, FULL BATH, 2 - 3/4 BATHS, 1/2 BATH, LAUNDRY, MECHANICAL, MEDIA ROOM, STORAGE
KITCHEN, DINING ROOM, DEN, LIVING ROOM, 1/2 BATH, GARAGE
2 BEDROOMS, 2 - 3/4 BATHS
1
4
X
X
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 180 days, or
if construction or work is suspended or
abandoned for a period of 180 days at
any time after work is commenced.
__________________
_________________
__________________
____________________
________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use
IFFR
Tenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Disturbed Exterior Area: Square footage of lot affected by permit application.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
Duplex
0290.2018.ARBK
1320 Snowbunny Lane 273501311004
4 2 Snowbunny Subdivision
CBS 1320 LLC 970-963-3833 crawforddesignbuild@comcast.net
Martin Mata 970-274-6011 matadesign@mac.com
New Duplex Building
$1,689,797 7
7500
4230 s.f.
15,000
7500
4230 s.f.
84
Duplex
n x195
1111
11
R-15
LL 12/13/2018
20716.77
X
31871.96 1,732.28 X sv 06/24/19
15613.21 6375.00 485.57 X JH 6/19/19
6375.00 4012.50 193.89 X JH 6/19/19
X JD 6/18/19
4780.79 X AR 5/20/19
X SW 7/3/19
4012.50 17,129.95 X AR 12/26/18
225.00 X PM 12/26/18
6875.00 16692.87 X
500.00 4224.49 RMX
103
x
xx
x
x
x
12/13/2018
5/31/19Dr
6/7/19
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 180 days, or
if construction or work is suspended or
abandoned for a period of 180 days at
any time after work is commenced.
__________________
_________________
__________________
____________________
________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use
IFFR
Tenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Disturbed Exterior Area: Square footage of lot affected by permit application.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
Duplex
0291.2018.ARBK
1322 Snowbunny Lane 273501311004
4 2 Snowbunny Subdivision
CBS 1320 LLC 970-963-3833 crawforddesignbuild@comcast.net
Martin Mata 970-274-6011 matadesign@mac.com
New Duplex Building
$1,304,219 3
7500
2387 s.f.
15,000
7500
2387
25
Duplex
n x1321211
11
R-15
LL 12/13/201816957.39
X
26088.29 12,930.34 X sv 06/24/19
15613.21 6375.00 22,119.27 X JH 6/19/19
6375.00 4012.50 1,447.25 X JH 6/19/19
X JD 6/18/19
3913.24 X AR 5/20/19
X SW 7/3/19
4012.50 .38 FTE X AR 12/26/18
225.00 X PM 12/26/18
6875.00 12644.30 X
500.00 3260.55 RMX
103
x
xx
x
x
x
12/13/2018
5/31/19Dr
6/7/19
0290.2018.ARBK; 0291.2018.AR
CBS 1320 LLC
1320 1322 SNOWBUNNY LN
273501311004
DAM 7/15/19
DAM 7/15/19
05/17/2019
05/17/2019 05/17/2019
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
05/17/201905/17/2019
05/31/2019
justinh
05/17/2019 05/17/2019 05/17/2019
05/31/2019
justinh
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
05/17/2019
05/17/2019
05/17/2019
05/31/2019
justinh
05/17/2019
05/31/2019
justinh
Field Plan Set Must Be Printed In Color
Air Pollution Control Division – Indoor Environment Program – Asbestos/IAQ Air Unit
4300 Cherry Creek Drive South, APCD-IE-B1
Denver, Colorado 80246-1530
Phone: 303-692-3100 – Fax: 303-782-0278
E-mail: asbestos@state.co.us
Colorado Department of Public Health and Environment
Approval issued on: 6/4/2019
Record number: 149083 $65.00
Check number: 14735Notice Number: 19PI3356D
For the location specified below:
Residence
1320 Snowbunny Lane
Aspen
Pitkin County
This notice has been issued to:
Crawford Design Build, LLC
Issued by: SM
Asbestos Building Inspector:
Inspection Date: 12/10/2018
Fee Paid:
1101 Village Rd. #LL2B
Carbondale, co 81623
DEMOLITION APPROVAL NOTICE
This approval notice is granted subject to Colorado Air Quality Control Commission Regulation
No. 8, Part B, adopted December 21, 2007, and effective January 30, 2008 and the Colorado Air
Pollution Prevention and Control Act C.R.S. (25-7-101 and 25-7-501 et seq). This notice signifies
that the structure was inspected for asbestos, luminous exit signs (containing radioactive material),
and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the
Colorado Department of Public Health and Environment pursuant to Regulation No. 8, Part B.
THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES.
Immediately notify the Asbestos/IAQ Unit of project modifications by fax (number above) or e-mail
(address above) and the appropriate county health department by fax. Project modifications include
changes in the scope of work or the scheduled work dates, etc.
This demolition approval notice is valid beginning 6/3/2019.
The actual scheduled work dates are from 6/3/2019 through 7/3/2019.
Please note that certain asbestos-containing materials (ACM) may remain in the structure
during demolition. Therefore, any demolition debris left behind after the completion of post-
demolition site cleanup may constitute a "reason to know of asbestos-contaminated soil" at the
site, subject to the requirements of Section 5.5 of the Solid Waste Regulations (6 CCR 1007-2,
Part 1).
As a contractor, you may be subject to other demolition licenses and permits, depending on the
requirements of the county and municipality in which the work is being performed. The Colorado
Department of Public Health and Environment, Air Pollution Control Division, strongly suggests
that you check with county and municipal authorities in order to determine any other local
building/permitting requirements that must be met.
Ellen Johnson
23799Cerification No.:
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items.
2.
4.
1
1320 SNOWBUNNY LN 0290.2018.ARBK
0291.2018.ARBK1322 SNOWBUNNY LN
5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items.
Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work without special inspection.
2
0290.2018.ARBK
JH JUSTIN HAHN 6/19/19
0291.2018.ARBK1322 SNOWBUNNY LN
';?,
2. Approval offabricator. Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication; the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
perfonned in accordance with the approved construction documents.
G. Buitding Department Responsibilities
1. Approve special-inspedion program. The building department shall approve all
special inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, in
addition to that of the !)pecial inspector, must be obtained prior to placement of concrete,
covering of structural steel, or other similar materials. ·
3. Review inspection reports. The building officialshould review special-inspection
progress and final reports.
4. Perform final inspection. The building official should perfonn the final inspection and
approval for a project [IBC Sec. 109 .3 .1] after the final special-inspection repo1t has. been
reviewed and approved.
Project Address: 1320 Snowbunny Permit Number:. ________ _
ACKNOWLEDGMENTS
l have read and agree to comply with the conditions of this agreement.
Special Inspection Agency: Signature: Printed Name: Date:
Printed Name Date
[$~o Gi,.~ L2•12.·1t
Engineer/ Architect: Signature: Printed Name: Date:
Ernest Kollar Engineers, Inc. Fl'IU!lt Kq/tty,, Ernest Kollar 10/26/2018
Contractor: Signature: Printed Name: Date:
c..~~it,tLJ~l,-,GJW B,,uc.., (3,t,.,.J') 1'2• 1'2.•18
Approved Fabricator:
Inspected Fabricator:
, 6~1)~111.:,Jtt~
(circle one)
CITY OF ASPEN
PITKIN COUNTY:
Signature:
Printed Name: Date:
~,c.. B'fUl,v\C6l'L ~-·-
Printed Name: Date:
3
r
JH JUSTIN HAHN 6/19/19
0290.2018.ARBK
0291.2018.ARBK1322 SNOWBUNNY LN
05/31/2019
justinh