HomeMy WebLinkAboutFile Documents.802 E Cooper Ave.0088.2019 (60).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
ADDRESS: 802 E Cooper Unit 1 PERMIT NUMBER:
Cell Phone
X!'ilil',s, 93 1 Gibson Ave .,q,AsPen -st"t" CO zrP 8161 1
i-Jlairss ad am roth berg @comcast. n et
prr" Adam Rothberg Cell Phone
MailineAddres's State ZIP
i-jt?!,,qd am roth be rg @comcast. net
gs.u Kim Raymond
MailinsAddres-s
;-gair,, Kim@krai.us
1r." High Country Cell Phone
MailinsAddres-s
[-JXarr,, f he?l@ hceng. com
iill;gg 931 Gibson Ave -st,t" CO zo !] 91-1
i-ji?l,, gd a m roth berg @ comcast. net
INSPECTIONS: The General Contractor must schedule inspections online,Please visit www.aspenpitkin.com/Departments/community-Devehcpment-Forms/ to do so.
I hereby r:ertify that I have read and examined this application and know the same to be true and correct, All provisions of laws ano
ordinances governing this type of work will be complied with wht-.ther specified herein or rrot. The granting of a permit does notpresume to give authority torriolate or carrcel the provisions of any otlrer state or local law regulating construction or the performance
of construction. lt is review the approved pletns and any comments that are contained thereon and see that thestructure and/or all
ContractorSignature_Dil"0312112019
n Check if you are a tested (single-family homes only). You must take a test and complete the owner/building affidavit.(CITY USE ONLY) Owner r approved by:Date:Affidavit on file
COMMUNITY DEVELOPMENTDEPARTM ENT
,,twfiffij
i .l t'/ t:,\i /rti'p,{:y4
BUILDING PERMIT CONTACT SHEIET
jack@alb rig ht- associateri. com
CITY OF ASPf l\augustzorz 13CI S. GALENA ST ASPEN, CO 8T61.I04/24/2019
05/08/2019
04/24/2019
06/
1
8
/
2
0
1
9
nic
k
t
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__
UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
n
n
n
n
n
4,104 sq ftN/A
2
n
1 1
1 1
3 3 0
1
1
4
Bedroom + Bath w/ closet
Garage, guest bedroom w/ guest bathroom, master bedroom w/ master bath, living room, dining room, kitchen
power room & entry/foyer
NT 6/18/19
04/24/2019
2
FIRE
SPRINKLERS
REQUIRED
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
EngineeringReview Zoning Review (50%)School Lands Dedication
Zoning Review (50%)CMP (50%)TDM Impact
Energy CodeReview REMPPayment Pedestrian Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area
Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
4/5/19 0088.2019.ARBK
802 East Cooper Avenue 1 273718228030
Original Street
Rick Wark 713-560-9341 rewark@aol.com
Kim Raymond 970-925-2252 kim@krai.us
Interior remodel of existing unit. Updating of finishes and fixtures
$100,000
4
0
5
n
3
1
1
1
± 400 sq ft
4104 sq ft
6000 sq ft 1
0
0 sq ft
0 sq ft
2213 sq ft
0
N/A
R/MF
x jb 4/24/19
x JRB 5/8/19
x NT 6/18/19
1962.19 3018.75 0 x
162.50 0 x
162.50 214 0 x
0
214 0
227.85 250
04/24/2019
DAM 6/19/19
PH 6/11/19
SW 6/11/19
PM 5/8/19
0088.2019.ARBK
WARK
802 EAST COOPER #1
273718228030