Loading...
HomeMy WebLinkAboutFile Documents.415 North St.0101.2019 (22).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 0101.2019.ARBK ARENA 5 LLC 415 W NORTH 273512411002 05/03/2019 05/03/2019 05/03/2019 05/03/2019 05/03/2019 ALL REPLACEMENT DOORS AND WINDOWS, INCLUDING THE GARAGE, SHALL HAVE A MAX U VALUE OF .28 AND SHALL BE NFRC STICKERED AT INSPECTION. 06/21/2019 NO EXTERIOR LIGHTING IN SCOPE OF WORK. 05/03/2019 140,000.00 X X X X X LL 5/3/19 3266.25 163.80 325.00 875.26 753.75 875.26 325.00 420.00 5025.00 350.00 0101.2019.ARBK JH 5/15/19 Dr 5/22/19 SV 06/21 PH 05/28 DAM 6/21/19