Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0111.2019 (36).ARBK05/13/2019 2 8665 JH 10/22/19 Unit #4 - kitchen, living room, 3/4 bath and 1 bedroom Unit #3 lower level - 2 car garage, mudroom Common space - storage room and mechanical Unit #1 - kitchen, living room, 3/4 bath, 1 bedroom Unit #2 - living room, kitchen, 3/4 bath, 1 bedroom Unit #3 Main Level - 3 bedrooms, 1 full bath, 2 3/4 baths, laundry room Unit #3 Upper Level - office, kitchen, dining room, living room, 1/2 bath The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. 05/13/2019 0111.2019.ARBK 05/13/2019 West End Home LLC Kenneth Sack 5/8/19 05/13/2019 0111.2019.ARBK JH Justin Hahn 8/7/19 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ x 0111.2019.ARBK 8/7/19 835 SF (726 SF Existing, 109 SF New) A-002 96% N/A JH SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 FIRE SPRINKLERS REQUIRED Per this project’s asbestos inspection report, your project does not require a State asbestos abatement permit. However, the following OSHA regulation must be strictly adhered to: Standard Title 29, Part 1910.134, 1910.1001, and 1926.1101 of the Code of Federal Regulations. It is recommended that you familiarize yourself with these regulations and have a certified General Abatement Contractor (GAC) conduct the removal of the Asbestos Containing Material (ACM) under engineering controls and that once the removal process is completed, a visual inspection and clearance air monitoring be conducted by an independent, certified Air Monitoring Specialist. Furthermore, identified ACM may be in areas which were either not covered in the scope of the asbestos inspection or were inaccessible or hidden due to their application during the construction process and their subsequent enclosure or covering with building and finish materials. These areas should be inspected when renovation or demolition activities are scheduled which may disturb the materials within, or beneath these barriers. ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 10/21/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ Use of Building Class of Work New ĚĚŝƟŽŶůƚĞƌĂƟŽŶRepair ________ YesNo Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍ NOTICE: This permit becomes null and void if work ŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶ ϭϴϬĚĂLJƐ͕ŽƌŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌ ĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚĂŶLJƟŵĞĂŌĞƌ work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) DŝdžĞĚͲhƐĞ IFFRTenant FinishĞŵŽůŝƟŽŶChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands ĞĚŝĐĂƟŽŶ Zoning Review (50%) CMP (50%)TDM Impact ŶĞƌŐLJŽĚĞ Review REMP WĂLJŵĞŶƚ Pedestrian ŵĞŶŝƚLJ CMP (50%) GIS Housing Cash in Lieu Parks Review ŝƚLJhƐĞ Tax Water Tap hƟůŝƚLJZĞǀŝĞǁ ŽƵŶƚLJhƐĞ Tax ^ĂŶŝƚĂƟŽŶ SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater ^ĂŶŝƚĂƟŽŶ Env. Health Parks Landscape ĸĐŝĞŶĐLJ Approved To Issue Issuance Date ApprovedReviewingDepartment Reviewer^ŝŐŶͲKī NEW SQ FT WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘ ^Ƌ&ƚŽĨƵŝůĚŝŶŐtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨŝŶƚĞƌŝŽƌĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘ hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘ >Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘ ^Ƌ&ƚŽĨ^ŽŝůŝƐƚƵƌďĂŶĐĞ͗ Exterior area of the lot where the ground is disturbed EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐĂďůĞƐƉĂĐĞ͘ ƵŝůĚŝŶŐ&ŽŽƚƉƌŝŶƚ͗'ƌĂĚĞŇŽŽƌƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƚŚĞƉĞƌŵŝƩĞĚƐƚƌƵĐƚƵƌĞ͘ ,ĂƌĚƐĐĂƉĞƌĞĂ͗Square footage of impervious lot surface. ŽŶĞŝƐƚƌŝĐƚ͗hŶĚĞƌůLJŝŶŐnjŽŶĞĚŝƐƚƌŝĐƚŽĨƉĞƌŵŝƩĞĚƉĂƌĐĞů͘ January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review • Projects involving less than 50% ŚĂƌĚƐĐĂƉĞĂƌĞĂĂŶĚǁŽƌŬĂīĞĐƟŶŐ ϳϱйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚƐƋŌ • Projects involving greater than 50% hardscape area and work ĂīĞĐƟŶŐϱϬйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚ ƐƋŌ • WƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐϭ͕ϬϬϬнƐƋŌŽĨ soil disturbance area tĂƚĞƌĸĐŝĞŶƚ>ĂŶĚƐĐĂƉŝŶŐ • Projects that trigger a major engineering review • Projects involving interior ĂůƚĞƌĂƟŽŶƐĂīĞĐƟŶŐϱϬйŽƌŵŽƌĞ ŽĨĞdžŝƐŝƟŶŐŐƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 210 S West End Street 273718206004 K,L & M 32 East Aspen Addition Sheri Sack sherisack@vcaaspen.com Janet Leverson 429-1286 jleverson@galambosarchitects.net Renovation of Unit 4 (R.O. and the lower and main level of Unit 3, new windows and exterior doors, new roofing, siding and stone veneer, expansion of garage and back stair. $2,500,000 6 1 6 ■ 4 2 2 1 3,809 SF 8,102 SF Existing 9,000 SF 2 approx 960 SF 122 SF 3,923 SF Existing 1 2 1,485 SF Existing R/MF 05/20/2019 X LL 5/20/19 X X X X X X X X 28616.25 2989.35 270.00 2952.75 1681.05 2038.35 6603.75 2038.35 2952.75 25200.00 44025.00 6250.00 0111.2019.ARBK Dr 8/16/19 HG 10/9/190 0 0 0 439.78 JRB 10/21/19 JH 10/22/19 JH 10/22/19 PH 6/26/19 SW 10/21/19 CS 6/13/19 05/13/2019 FIRE DAMPERS REQUIRED Ducts and air transfer openings in fire resistive floor/ceiling or roof/ceiling assemblies shall be protected with approved fire dampers installed in accordance with their listing (IBC 717.5.2 & 717.5.4) FIRE RATED HATS REQUIRED Where floor/ceiling or roof/ceiling assemblies are required to have a fire-resistive rating, recessed fixtures shall be installed such that the required fire resistance will not be reduced (IBC 714.4.2) READ THIS OR FAIL YOUR INSPECTION! Furred & Dropped Ceilings, Soffits, and Walls 20015 IBC 803.13 This applies to the attachment of finishes or furring to any assemblies that are required to be either fire-rated or non-combustible and is separate from the fire-rated assembly requirement. Walls, Ceilings & Soffits: If furred 1 ¾ inches or less, do one of the following: 4.Fill spaces with Class A material. 5.Fill spaces with inorganic or non-combustible material. 6.Fire block 8 feet in all directions. Walls: If set out (furred) greater than 1 ¾ inches, do one of the following: 4.Use a Class A finish material (such as drywall). 5.Use non-combustible framing. 6.Protect both sides with fire sprinklers. Ceilings & Soffits: If dropped (furred) greater than 1 ¾ inches: Framing members, hangers, and other assembly members must be non-combustible. You may not use wood. In Type III and V construction only, you may use fire retardant treated wood or non-combustible framing. Recessed luminaires installed in building thermal envelope shall be sealed and IC-rated – IECC sec R402.4.5 Any recessed light fixtures in contact with insulation must be IC rated. DAM 10/22/19 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0011-2021-BCHO 8/31/21 761 SQ.FT. TOTAL (726 EXISTING, 35 NEW) A-002 94.4% NONE JH master 0111.2019.ARBK The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 05/13/2019 JH 8/7/19 0111.2019.ARBK SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 FIRE SPRINKLERS REQUIRED