HomeMy WebLinkAboutFile Documents.210 S West End St.0111.2019 (36).ARBK05/13/2019
2
8665
JH 10/22/19
Unit #4 - kitchen, living room, 3/4 bath and 1 bedroom
Unit #3 lower level - 2 car garage, mudroom Common space - storage room and mechanical
Unit #1 - kitchen, living room, 3/4 bath, 1 bedroom Unit #2 - living room, kitchen, 3/4 bath, 1 bedroom
Unit #3 Main Level - 3 bedrooms, 1 full bath, 2 3/4 baths, laundry room
Unit #3 Upper Level - office, kitchen, dining room, living room, 1/2 bath
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
05/13/2019
0111.2019.ARBK
05/13/2019
West End Home LLC Kenneth Sack 5/8/19
05/13/2019
0111.2019.ARBK
JH Justin Hahn 8/7/19
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
x
0111.2019.ARBK 8/7/19
835 SF (726 SF Existing, 109 SF New)
A-002
96%
N/A
JH SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
FIRE
SPRINKLERS
REQUIRED
Per this project’s asbestos inspection report, your project
does not require a State asbestos abatement permit.
However, the following OSHA regulation must be
strictly adhered to: Standard Title 29, Part 1910.134,
1910.1001, and 1926.1101 of the Code of Federal
Regulations. It is recommended that you familiarize
yourself with these regulations and have a certified
General Abatement Contractor (GAC) conduct the removal
of the Asbestos Containing Material (ACM) under
engineering controls and that once the removal process is
completed, a visual inspection and clearance air
monitoring be conducted by an independent, certified Air
Monitoring Specialist. Furthermore, identified ACM may
be in areas which were either not covered in the scope of
the asbestos inspection or were inaccessible or hidden
due to their application during the construction process
and their subsequent enclosure or covering with building
and finish materials. These areas should be inspected
when renovation or demolition activities are scheduled
which may disturb the materials within, or beneath these
barriers.
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
10/21/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ
Use of Building Class of Work
New
ĚĚŝƟŽŶůƚĞƌĂƟŽŶRepair
________
YesNo
Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍
NOTICE: This permit becomes null and void if work
ŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶ
ϭϴϬĚĂLJƐ͕ŽƌŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌ
ĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚĂŶLJƟŵĞĂŌĞƌ
work is commenced.
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
DŝdžĞĚͲhƐĞ
IFFRTenant FinishĞŵŽůŝƟŽŶChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
ĞĚŝĐĂƟŽŶ
Zoning
Review (50%)
CMP (50%)TDM Impact
ŶĞƌŐLJŽĚĞ
Review
REMP
WĂLJŵĞŶƚ
Pedestrian
ŵĞŶŝƚLJ
CMP (50%) GIS Housing Cash in Lieu
Parks Review ŝƚLJhƐĞ
Tax Water Tap
hƟůŝƚLJZĞǀŝĞǁ ŽƵŶƚLJhƐĞ
Tax ^ĂŶŝƚĂƟŽŶ
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
ͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
ͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
^ĂŶŝƚĂƟŽŶ
Env. Health
Parks
Landscape
ĸĐŝĞŶĐLJ
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Reviewer^ŝŐŶͲKī
NEW SQ FT
WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘
^Ƌ&ƚŽĨƵŝůĚŝŶŐtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨŝŶƚĞƌŝŽƌĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘
hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘
>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘
^Ƌ&ƚŽĨ^ŽŝůŝƐƚƵƌďĂŶĐĞ͗ Exterior area of the lot where the ground is disturbed
EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐĂďůĞƐƉĂĐĞ͘
ƵŝůĚŝŶŐ&ŽŽƚƉƌŝŶƚ͗'ƌĂĚĞŇŽŽƌƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƚŚĞƉĞƌŵŝƩĞĚƐƚƌƵĐƚƵƌĞ͘
,ĂƌĚƐĐĂƉĞƌĞĂ͗Square footage of impervious lot surface.
ŽŶĞŝƐƚƌŝĐƚ͗hŶĚĞƌůLJŝŶŐnjŽŶĞĚŝƐƚƌŝĐƚŽĨƉĞƌŵŝƩĞĚƉĂƌĐĞů͘
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review
• Projects involving less than 50%
ŚĂƌĚƐĐĂƉĞĂƌĞĂĂŶĚǁŽƌŬĂīĞĐƟŶŐ
ϳϱйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚƐƋŌ
• Projects involving greater than
50% hardscape area and work
ĂīĞĐƟŶŐϱϬйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚ
ƐƋŌ
• WƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐϭ͕ϬϬϬнƐƋŌŽĨ
soil disturbance area
tĂƚĞƌĸĐŝĞŶƚ>ĂŶĚƐĐĂƉŝŶŐ
• Projects that trigger a major
engineering review
• Projects involving interior
ĂůƚĞƌĂƟŽŶƐĂīĞĐƟŶŐϱϬйŽƌŵŽƌĞ
ŽĨĞdžŝƐŝƟŶŐŐƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
210 S West End Street 273718206004
K,L & M 32 East Aspen Addition
Sheri Sack sherisack@vcaaspen.com
Janet Leverson 429-1286 jleverson@galambosarchitects.net
Renovation of Unit 4 (R.O. and the lower and main level of Unit 3, new windows and exterior doors, new roofing,
siding and stone veneer, expansion of garage and back stair.
$2,500,000
6
1
6
■
4
2
2
1
3,809 SF
8,102 SF Existing
9,000 SF 2
approx 960 SF
122 SF
3,923 SF Existing
1
2
1,485 SF Existing
R/MF
05/20/2019
X LL 5/20/19
X
X
X
X
X
X
X
X
28616.25
2989.35
270.00
2952.75
1681.05
2038.35
6603.75
2038.35
2952.75
25200.00
44025.00
6250.00
0111.2019.ARBK
Dr 8/16/19
HG 10/9/190
0
0
0
439.78
JRB 10/21/19
JH 10/22/19
JH 10/22/19
PH 6/26/19
SW 10/21/19
CS 6/13/19
05/13/2019
FIRE DAMPERS REQUIRED
Ducts and air transfer openings in fire
resistive floor/ceiling or roof/ceiling
assemblies shall be protected with approved
fire dampers installed in accordance with
their listing (IBC 717.5.2 & 717.5.4)
FIRE RATED HATS REQUIRED
Where floor/ceiling or roof/ceiling
assemblies are required to have a
fire-resistive rating, recessed fixtures shall
be installed such that the required fire
resistance will not be reduced (IBC 714.4.2)
READ THIS OR FAIL YOUR INSPECTION!
Furred & Dropped Ceilings, Soffits, and Walls
20015 IBC 803.13
This applies to the attachment of finishes or furring to any
assemblies that are required to be either fire-rated or
non-combustible and is separate from the fire-rated
assembly requirement.
Walls, Ceilings & Soffits: If furred 1 ¾ inches or
less, do one of the following:
4.Fill spaces with Class A material.
5.Fill spaces with inorganic or non-combustible material.
6.Fire block 8 feet in all directions.
Walls: If set out (furred) greater than 1 ¾ inches,
do one of the following:
4.Use a Class A finish material (such as drywall).
5.Use non-combustible framing.
6.Protect both sides with fire sprinklers.
Ceilings & Soffits: If dropped (furred) greater
than 1 ¾ inches:
Framing members, hangers, and other assembly
members must be non-combustible. You may not
use wood.
In Type III and V construction only, you may use fire
retardant treated wood or non-combustible framing.
Recessed luminaires installed
in building thermal envelope
shall be sealed and IC-rated
– IECC sec R402.4.5
Any recessed light fixtures
in contact with insulation
must be IC rated.
DAM 10/22/19
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0011-2021-BCHO 8/31/21
761 SQ.FT. TOTAL (726 EXISTING, 35 NEW)
A-002
94.4%
NONE
JH
master 0111.2019.ARBK
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
05/13/2019
JH 8/7/19
0111.2019.ARBK
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
FIRE
SPRINKLERS
REQUIRED