HomeMy WebLinkAboutFile Documents.210 S West End St.0011-2021-BCHO (21)The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
06/01/2021
Holesaw size (R) (diameter): 0 inches
On Center Spacing (T): 0 inches
% Open (30% minimum req'd): #DIV/0!
Minimum required thickness of EPS/XPS
insulation to get overall R-10:#DIV/0! inches
Holesaw size (R) (diameter): 2.5 inches
Vertical On Center Spacing (U1): 4 inches
Horizontal On Center Spacing (U2): 4 inches
% Open (30% minimum req'd): 30.7%
Minimum required thickness of EPS/XPS
insulation to get overall R-10: 2.61 inches
City of Aspen
V1 modified 1/25/2017
Pervious Snowmelt Insulation Perforation Calculator
The City of Aspen has created and provided this software solely as
a reference. Users should obtain assistance from a qualified
professional to verify accuracy and applicability before
proceeding. The City of Aspen makes no express or implied
warranty with respect to this software or any information
contained herein. To the full extent permissible by law, the City of
Aspen disclaims all responsibility for any damages or losses
(including, without limitation, structural damage, building defects,
financial loss, damages for loss in business projects, loss of profits
or other consequential losses) arising in contract, tort or
otherwise from the use of or inability to use this software, or from
any action or decision taken as a result of using this software.
Sand with snowmelt tubing
Pervious pavers
3" of insulation (R-15) with holes sized and spaced as calculated
Screened rock below filter fabric
example section detail
Compacted road base
08/10/2021
SEE CIVIL SHEET C7 FOR
CORRESPONDING DETAILING
08/31/2021
justinh
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0011-2021-BCHO 8/31/21
761 SQ.FT. TOTAL (726 EXISTING, 35 NEW)
A-002
94.4%
NONE
JH
08/31/2021
justinh
SEE NOTES #1 PLANS