These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SEE NOTES #1 PLANS
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
EngineeringReview Zoning Review (50%)School Lands Dedication
Zoning Review (50%)CMP (50%)TDM Impact
Energy CodeReview REMPPayment Pedestrian Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area
Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
11.21.2019 0117.2019.ARBK
150 Roaring Fork Drive n/a 273718120031
21 Eastwood
Morris 521-663-9362 kristal.ben@gmail.com
Claude Salter 970-309-7955 Aspendevelopmentservices@gmail.com
interior remodel existing single family home lower levels, addition of full bathroom, remodel existing
wet bar, addition of interior circulation to lower level for access to wine room.
$
1
1
1
30,056.4
n/a
existing/ no change
R-15B
12/20/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
150 Roaring Fork Drive
970-309-7955Claude Salter Aspendevelpmentservices@gmail.com
714-262-5514Shawn Sinclair, SDS Construction shawndsinclair@hotmail.com
Morris Benjamin & Kristal Lvg Trust 512-663-9362
1108 Lavaca #110333 Austin TX 78701
kristal.ben@gmail.com
Claude Salter, Aspen Development Services 970-309-7955
210 S Galena, suite 31 Aspen CO 81611
Aspendevelopmentservices@gmail.com
Claude Salter, Aspen Development Services 970-309-7955
210 S Galena, Suite 31 Aspen CO 81611
Aspendevelopmentservices@gmail.com
Steven May, Red Room Design 970-413-3144
Grand Avenue,Glenwood Springs CO
stevenm@redroom-design.com
Steve Edmiston,206-910-7766
1040 Main Street Carbondale CO 81623
steve@evolvestruct.com
Shawn Sinclair, SDS Construction 714-262-5514
PO Box 5184 Snowmass village CO 81615
shawndsinclair@hotmail.com
12/20/2019
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
n n
0 0 0
2
4 4
1
1
3 1
addition to living room, add mud room and move laundry room, change stairs between three levels,
reconfigure master bathroom, add dormer at office
new windows ,siding, and garage door
12/20/2019
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
concrete, structural steel; high-strength bolting--
refer sheet S0.001
NEW SHEETS = NEW SCOPE OF WORK
EXISTING SHEETS – CLOUDED AREAS ARE CHANGED
CHANGES:
GENERAL
• ALL NEW DOORS & WINDOWS
• ALL NEW EXTERIOR SIDING
• ALL DECKS TO UNDERGO NORMAL MAINTENANCE
• ALL RAILINGS TO UNDERGO NORMAL MAINTENANCE
CVR
• NEW SHEETS
o Z-005-013 ROOF DEMO CALCS, WALL DEMO CALCS, INTERIOR
DEMO CALCS, HARDSCAPE DEMO CALCS, BUILDING WORK
AREA, NEW NET LIVABLE CALCS, EXISTING HARDSCAPE &
ESTIMATED SOIL DISTURBANCE, GROSS FIRE AREA CALCS
o Z-201-203 HEIGHTS
o A-001X, A-001 EXISTING & PROPOSED SITE PLAN
o A-103X-104X EXISTING FLOOR PLANS, ROOF PLAN
o A-103-104 PROPOSED FLOOR PLANS, ROOF PLAN
o A-201X-203X EXISTING ELEVATIONS
o A-201-203 PROPOSED ELEVATIONS
o A-301-302 SECTIONS
o A-401-403 STAIR & FIREPLACE DETAILS
o A-502 WALL SECTION DETAILS
o A-601-605 SCHEDULES
o I-201-204 FINISH FLOOR PLANS
o I-701-704 REFLECTED CEILING PLANS
Z-001 - NO CHANGES
Z-002
• CLARIFIED LOWER LEVEL DECK EXTENTS PER SURVEY
• GARAGE ALL ONE FILL
• ADDED ATTIC SF > 5'-6"
• UPDATED CALCULATIONS
Z-003 - NO CHANGES
Z-004
• CLARIFIED LOWER LEVEL DECK EXTENTS PER SURVEY
12/20/2019
• REMOVED DECK, STAIRS ON LOWER LEVEL
• ADDED LAUNDRY TO GARAGE
• MAIN LEVEL ADDITION BETWEEN GRIDLINE A1-A
• UPPER LEVEL LOFT EXTENSIONS
• ADDED ATTIC SF > 5'-6"
• UPDATED CALCULATIONS
A-100X - NO CHANGES
A-101X
• DEMOLITION IN HALL & BED 2
A-102X
• DEMOLITION TO PREP FOR ADDITION
• DEMOLITION IN KITCHEN, STAIR 1, STAIR 2, BED 3, BATH 3
A-100
• REMOVE DOOR TO WINE ROOM
A-101
• STRUCTURAL COLUMNS FOR ADDITION
• ADDITION OF STAIR 2
• ALTERATION TO BED 2, BATH 2, MECH RM
A-102
• ADDITION BETWEEN GRIDLINE A1-A
• ADDITION OF STAIR 2, CLOSET, PANTRY, POWDER, LAUNDRY
• ALTERATION TO KITCHEN, BED 3, BATH 3
A-401
• ADDED LOWER LEVEL CLOSET IN BED 2
A-501
• ADDED ASSEMBLIES, MOVED DOOR & WINDOW SCHEDULES TO A-601-
605.
12/20/2019
TF
TF
2/12/2020
2/12/2020
March 12, 2020
Ben & Kristal Morris
150 Roaring Fork Drive
Aspen, CO 81611
RE: Existing Deck Conditions – 150 Roaring Fork Drive, Aspen, Colorado
Evolve Project #19.019C
Ben & Kristal,
As requested, we observed the existing decks at the residence note above. These include one deck behind the
garage, one deck off the main living area, and one lower deck below the main living deck. The existing decks are
wood framed with 2x deck joists supported on wood beams and wood posts. Our observations are as follows:
· Existing deck joists are weathered and appear to be moisture damaged.
· Existing column at the corner of the garage deck is a 4x6 wood post, extends approximately a story and a
half in height, and appears to exceed the slenderness limit of le/d = 50 per NDS 3.7.1.4.
· Existing deck beam at garage deck is a multi-ply beam with outside laminations appearing to cup.
· Existing deck beam at main living deck is a two-ply microlam beam, not suited for exterior use.
· An existing lower deck column appears to be a 6x6 wood column buried in the ground, no concrete
foundation visible.
Upon completing our observations above, it is our opinion that the decks in general have not weathered well and
appear to be inadequate in certain aspects. With their apparent inadequacies, we recommend replacing all deck
structure with new framing. Should you have any further questions regarding this matter, please feel free to
contact our office.
Sincerely,
Evolve Structural Design LLC
Steven R. Edmiston, P.E., S.E.
Senior Engineer
Cc: Community Development, Zoning and Planning Staff
03/12/2020
05/05/2020
7/20/2020
TF/JH
08/12/2020
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
0010-2019-BCHO
MORRIS BENJAMIN AND KRISTAL LVG
150 ROARING FORK DRIVE
273718120031
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items.
2.
4.
1
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
150 Roaring Fork Dr 0010.2019.BCHO
TF Tony Fusaro 2/12/2020 tony.fusaro@cityofaspen.com
7/20/2020
TF/JH
7/20/2020
TF/JH