Loading...
HomeMy WebLinkAboutFile Documents.134 Maple Ln.0138.2019 (15).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 09/13/2019 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD / hereby certify that / have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. /t is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date /NSPEd/ONS: dŚe 'eneral ontractor ŵust scŚedule inspections online͘ Please ǀisit www͘aspenpitkin͘coŵͬDepartŵentsͬoŵŵunitLJ-Deǀelopŵent-Forŵsͬ to do so͘ ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). zou must take a test and complete the owner/building affidavit. (C/Tz USE KELz) Kwner builder approved by͗________________________Date͗______________________ Affidavit on file ADDRESS͗ ____________________________PERM/T EUMBER͗ _______________________________ August 2017 134 Maple Lane 0138.2019.ARBK 9703197155James Foerster James@raftinginaspen.com 9703197155James Foerster James@raftinginaspen.com 9703197155James Foerster 134 Maple Lane Aspen CO 81611 James@raftinginaspen.com Owner From Above Al Beyer 9709483039 410 N Mill St. Unit B11 Aspen CO 81611 abd@sporis.net N/A 9703001003Hein Brutsaert 307 AABC Unit N Aspen CO 81611 hein@brutsaertengineering.com 970-927-3249Smith Brugger Construction 47 Elk Range Drive Snowmass CO 81654 jfbruegger@gmail.com John Francis Bruegger Digitally signed by John Francis Bruegger Date: 2019.05.20 21:52:20 -06'00'05/20/2019 06/03/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFR Tenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%) CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County Use Tax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Lavatory (Wash Basin) ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ____Laundry Bar, Utility Sink ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment ReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration. Unit Sq Ft: Gross square footage, not FAR, of permitted unit. Lot Size: Total surveyed square footage of property. Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed New Sq Ft: Total added square footage for additions to net livable or net leasable space. Building Footprint: Grade floor square footage of the permitted structure. Hardscape Area: Square footage of impervious lot surface. Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review • Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft • Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft • Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping • Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 5/27/19 0138.2019.ARBK 134 Maple Lane 134 273707490134 Smuggler Park James Foerster 9703197155 james@raftinginaspen.com James Foerster 9703197155 james@raftinginaspen.com Remove and replace part of garage and back two bedrooms of house, add basement space. Entire project disturbs 936 sq ft of soil and is less than 50% of entire building 185,950 2 n n n n 21031 1407.4 3470 936 352 1427 1427 x jb 5/28/19 x Jpo 9/13/19 x jh 9/17 x jh 9/17 4012.94 6173.75 1908.05 x x ph 9/17 1703.21 721.70 5664.53 x sw 9/19 x ar 9/19 721.70 551.59 213.56 x cs 9/17 926.06 0 x 551.59 500 0 104.10 902.48 982.80 464.88 06/03/2019 HG 9/5/19 Dr 9/25/19 GRADING AND DRAINAGE REPORT HAMILTON/FOERSTER REMODEL – MINOR REVIEW 134 MAPLE LANE, SMUGGLER PARK Building Permit #: TBD Drainage Report: (with special guest Landscape narrative too) Description of the existing site: Common location, topography, land use, ground cover, soil type (if known), drainage pattern, and receiving system The Hamilton/Foerster remodel is located at 134 Maple Lane, which is the Southeastern corner parcel of the Smuggler Park. The topography of the lot is relatively flat with a gentle slope down to Maple Lane. South of the property line there is a small divide so only a narrow grass strip of park is tilted toward the property and all other local drainage patterns flow toward Gibson Avenue. As a parcel in the Smuggler Park development, the site is within the Smuggler Superfund Site boundary. The area is mapped as lead contaminated soils. The receiving system of the site is the Smuggler Park storm sewer system, which was upgraded in recent years. A copy of the system upgrades and infrastructure is on file with City Engineering Description of the proposed project: Changes to land use, topography, ground cover, soil type, drainage pattern, receiving system(s) The Hamilton/Foerster remodel project will not affect the land use or change the topography of the existing parcel. Ground cover in any disturbed area will be brought back to the existing condition or better. Drainage pattern is generally south to north toward the Maple Lane receiving system. Discussion of any drainage issues There are no drainage issues currently associated with this site which is approximately 50% undeveloped (rare for a Smuggler Lot). Discussion of drainage basins and drainage alterations, including increases in flow, changes in direction, outfalls, etc. Note: Snowmelt cannot drain to the right-of-way Drainage will be conveyed from roofs to BMP’s for WQCV compliance. No snowmelt is planned. Description of downstream stormwater conveyance system – “Minor hard” or “ Minor Green” Infrastructure Minor “green” – Description of water quality improvements. Improvements must be made for at least the project area. Describe what efforts have been made to reduce runoff and increase infiltration (e.g. to reduce impervious area, disconnect impervious area, route runoff via landscape rather than hard infrastructure). Minor “hard” –Calculation to determine the WQCV and design a BMP that can treat that volume WQCV improvements and calculations are included on the drainage/CMP plans and continue the use of “BMP Boat” displayed along the front yard pedestrian street. This feature has become a fun model for how WQCV can be handled in a confined area. The eastern roof drainage basin area has been reduced and is handled in the existing detention BMP Further Drainage info can be found in the report letter from MWE below which may or may not be relevant to this application. 06/03/2019 X BM 9/26/19 REFERENCES FROM 2015 IRC CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4 EE = emergency escape required sec R310.1 EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7 G/D = garage/dwelling separation, sec R302.5 and R302.6 STC = Sound transmission class not less than 45 at dwelling separations, app K RV = roof and rafter ventilation required, R806.1 A = attic access 22” x 30”, 30” headroom above, R807.1 SA = smoke alarms installed to NFPA 72 requirements, sec R314 CO = carbon monoxide detector per City Ordinance 41 series 2008 SG = safety glazing required, sec R308.4 GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36” horizontally, sec R312 WFP = window fall protection- operable window <24” AFF & >72” above grade: use opening control device listed to ASTM F2090, sec R312.2 HR = handrails 34”-38” ht, sec R311.7.8 SI = stairway illumination, sec R303.7 PD = protect against decay, sec R317 REFERENCES FROM 2015 IMC V = bathroom and balanced whole house mechanical ventilation req. Ordinance 40, 2016 DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK