Loading...
HomeMy WebLinkAboutFile Documents.81 Exhibition Ln.0143.2019 (18).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 06/06/2019 0143.2019.ARBK AJAX BONZAI LLC 81 EXHIBITION 273514314015 07/16/2019 April 24, 2019 Steven May, Partner Red Room Design 812 Grand Ave, Suite 203 Glenwood Springs, CO 81601 RE: 81 Exhibition Lane Residence Remodel – Aspen, Colorado Steven, We understand the proposed remodel is an interior remodel to an existing residence. Once demolition can begin, the interior wall and ceiling finishes shall be at least partially removed to allow observation of the existing structural system. We shall be contacted to perform a site observation of the exposed structure to determine the structural implications of the proposed remodel and any necessary structural revisions. This shall be done prior to proceeding with the removal or modification of any framing members. Thank you for engaging our firm for your project. Should you have any further questions regarding this matter, please feel free to contact our office. We look forward to assisting you in completing your project. Sincerely, Evolve Structural Design LLC Steven R. Edmiston, P.E., S.E. Senior Engineer 04/24/2019 06/06/2019 FIRE SPRINKLERS REQUIRED COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalUse of Building Class of Work New Repair ________ YesNo Will there be NOTICE: This permit becomes null and void if work work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) IFFRTenant Finish Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Zoning Review (50%) CMP (50%)TDM Impact Review REMP Pedestrian CMP (50%) GIS Housing Cash in Lieu Parks Review Tax Water Tap Tax SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Shower____Kitchen Sink (+Disposal)____Dishwasher ____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Env. Health Parks Landscape Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewer NEW SQ FT Exterior area of the lot where the ground is disturbed Square footage of impervious lot surface. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% • Projects involving greater than 50% hardscape area and work • soil disturbance area • Projects that trigger a major engineering review • Projects involving interior THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 06/06/2019 0143.2019.arbk X X X X X X LL 6/6/2019 2697.50 527.63 361.20 322.61 322.61 527.63 52.50 4150.00 262.50 R-MF / PD BN 7/16/19 0 1,325.67 0 0 0 BM 8/13/19 CK 6/25/19 PM 6/20/19 REFERENCES FROM 2015 IRC CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4 EE = emergency escape required sec R310.1 EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7 G/D = garage/dwelling separation, sec R302.5 and R302.6 STC = Sound transmission class not less than 45 at dwelling separations, app K RV = roof and rafter ventilation required, R806.1 A = attic access 22” x 30”, 30” headroom above, R807.1 SA = smoke alarms installed to NFPA 72 requirements, sec R314 CO = carbon monoxide detector per City Ordinance 41 series 2008 SG = safety glazing required, sec R308.4 GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36” horizontally, sec R312 WFP = window fall protection- operable window <24” AFF & >72” above grade: use opening control device listed to ASTM F2090, sec R312.2 HR = handrails 34”-38” ht, sec R311.7.8 SI = stairway illumination, sec R303.7 PD = protect against decay, sec R317 REFERENCES FROM 2015 IMC V = bathroom and balanced whole house mechanical ventilation req. Ordinance 40, 2016 DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 Dwelling Separation Required - 2015 IBC -708 Fire Partitions, 711 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. Exhaust fans require ceiling radiation damper. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. 2015 IBC 601 Fire Resistive Requirements for Type of Construction: ____ Primary Structural Frame: ____hr (columns, beams, girders, etc) Exterior Bearing Walls: ____hr Interior Bearing Walls: ____hr Floors/Ceilings: ____hr Roof : ____hr Unless noted otherwise for occupancy separation or fire separation distance. VB 0 0 0 0 0 BUILDING DESCRIPTION FORM - IRC & IBC BUILDING CODE INFORMATION UNIT DESCRIPTION AS PROPOSED BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) ADU BUILDING DESCRIPTION B E IRC IBC January 2018 06/06/2019 0143.2019.ARBK X X X X n/a n/a no change 5272 Full Full 1/2 Bath, 3 bedrooms, 2 full baths, 1 3/4 bath, Bonnie Muhigirwa 8/13/19 8/7/18 bonniem SW 8/16/19 DAM 8/22/19