Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (34).ACBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 06/17/2019 0054.2019.ACBK PITKIN COUNTY CAPITAL LEASING CO 506 E MAIN ST 273707347851 07/22/2019 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 2015 IBC 601 Fire Resistive Requirements for Type of Construction: ____ Primary Structural Frame: ____hr (columns, beams, girders, etc) Exterior Bearing Walls: ____hr Interior Bearing Walls: ____hr Floors/Ceilings: ____hr Roof : ____hr Unless noted otherwise for occupancy separation or fire separation distance. COMMERCIAL REFERENCES FROM 2015 IBC EU = enclosed usable space under stairs shall be 1-hr construction or stair enclosure rating. No access from stair enclosure.1011.7.3 SG = safety glazing required sec 2406 V = ventilation required, including from bathrooms. sec 1203.1, IMC 402 & 403 GR = guards, 42” min ht, 4” max opening sec 1015 HR = handrails 34”-38” ht sec 1014 AS = risers shall be solid in accessible egress stairs sec 1011.5.5.3 DS = Draft stopping / fire blocking 718 RD = Roof drainage 1503.4 STC = Sound transmission class not less than 50 at dwelling separations, sec 1207 PD = protect against decay, sec 2304.12 REFERENCES FROM 2015 IMC AS = access and service space for maintenance req’d, sec 306 MA = kitchen hood make up air required, sec 508 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC CA = combustion air not taken from bathrooms or storage, sec 303.3 REFERENCES FROM 2015 IECC F = new or replacement glazing U factors may not exceed: Fixed fenestration: U 0.29 Operable fenestration: U 0.37 Entrance doors: U 0.77 -Must have NFRC label or ASHRAE calcs, sec C402.4 REFERENCES FROM 2014 NEC EP = electric panel ‘happy space’ 30”x36”x78”, not in storage, sec 110.26 IIIB 2 0 0 0 06/17/2019 06/17/2019 204 Basement: Office space, break room, conference roof, holding area, storage, mechanical room, courtroom, judge's chambers, jury deliberation, two single stall accessible restrooms, men's and women's restrooms. Main Level: Office space, meeting rooms, file/copy room, security screening, three accessible restrooms, Second Floor: District courtroom, county courtroom, judge's chambers, office space, jury deliberation room, two single stall accessible restrooms, men's and women's restrooms One elevator, one lift NFPA 13 Sprinkler System Bonnie M 9/6/19 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of WorkNewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%)CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County UseTax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 6/18/19 0054.2019.ACBK 506 East Main Street, Aspen Colorado 81611 NA 273707347851 Lot 1 Amended Courthouse Portion of lot 1, pitkin county center, tract 10 S Pitkin County Government 970-618-3717 Jodi.smith@pitkincounty,com Jodi Smith 970-618-3717 jodi.smith@pitkincounty.com Rehabilitate the existing courthouse, reconfigure interior walls, restrooms, accessiblity upgrades to courtrooms, public space and offices. Installation of new accessibl lift at South entrance for single point public access and new secuirty check point. 4,212,666 14 0 13 0 1 1 2 16,168 NA 62,291 Sf 0 0 440 sf NA 6,915 3 4 0 0 0 NA Public X PL 6.26.19 X JPo 7.22.19 X AS 9/6/19 X BM 9/6/19 X BM 9/6/19 45,531.66 65,433.33 0 X JD 9/5/19 X PH 7/30/19 15,302.91 13,742.80 0 X SW 8/14/19 X PH 8/19/19 13,742.80 8,065.20 0 X PM 7/20/19 9,815.00 0 X DR 8/14/19 8,065.20 0 9 /R MX 1,868.73 X7,134.00 06/17/2019 Bonnie Muhigirwa 9/6/19 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection.