HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (34).ACBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
06/17/2019
0054.2019.ACBK
PITKIN COUNTY CAPITAL LEASING CO
506 E MAIN ST
273707347851
07/22/2019
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
2015 IBC 601 Fire Resistive Requirements for
Type of Construction: ____
Primary Structural Frame: ____hr
(columns, beams, girders, etc)
Exterior Bearing Walls: ____hr
Interior Bearing Walls: ____hr
Floors/Ceilings: ____hr
Roof : ____hr
Unless noted otherwise for occupancy separation or fire
separation distance.
COMMERCIAL REFERENCES FROM 2015 IBC
EU = enclosed usable space under stairs shall be 1-hr construction or stair
enclosure rating. No access from stair enclosure.1011.7.3
SG = safety glazing required sec 2406
V = ventilation required, including from bathrooms. sec 1203.1, IMC 402 & 403
GR = guards, 42” min ht, 4” max opening sec 1015
HR = handrails 34”-38” ht sec 1014
AS = risers shall be solid in accessible egress stairs sec 1011.5.5.3
DS = Draft stopping / fire blocking 718
RD = Roof drainage 1503.4
STC = Sound transmission class not less than 50 at dwelling separations, sec
1207
PD = protect against decay, sec 2304.12
REFERENCES FROM 2015 IMC
AS = access and service space for maintenance req’d, sec 306
MA = kitchen hood make up air required, sec 508
ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes,
501.3.1
IT= intake openings 10’ from lot line & contaminant sources (vents, streets),
401.4
D = fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
CA = combustion air not taken from bathrooms or storage, sec 303.3
REFERENCES FROM 2015 IECC
F = new or replacement glazing U factors may not exceed:
Fixed fenestration: U 0.29
Operable fenestration: U 0.37
Entrance doors: U 0.77
-Must have NFRC label or ASHRAE calcs, sec C402.4
REFERENCES FROM 2014 NEC
EP = electric panel ‘happy space’ 30”x36”x78”, not in storage, sec 110.26
IIIB
2
0
0
0
06/17/2019 06/17/2019
204
Basement: Office space, break room, conference roof, holding area, storage, mechanical room, courtroom, judge's chambers,
jury deliberation, two single stall accessible restrooms, men's and women's restrooms.
Main Level: Office space, meeting rooms, file/copy room, security screening, three accessible restrooms,
Second Floor: District courtroom, county courtroom, judge's chambers, office space, jury deliberation room, two single stall
accessible restrooms, men's and women's restrooms
One elevator, one lift
NFPA 13 Sprinkler System
Bonnie M 9/6/19
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Dedication
Zoning Review (50%)CMP (50%)TDM Impact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County UseTax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area
Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
6/18/19 0054.2019.ACBK
506 East Main Street, Aspen Colorado 81611 NA 273707347851
Lot 1 Amended Courthouse Portion of lot 1, pitkin county center, tract 10 S
Pitkin County Government 970-618-3717 Jodi.smith@pitkincounty,com
Jodi Smith 970-618-3717 jodi.smith@pitkincounty.com
Rehabilitate the existing courthouse, reconfigure interior walls, restrooms, accessiblity upgrades to courtrooms, public space
and offices. Installation of new accessibl lift at South entrance for single point public access and new secuirty check point.
4,212,666
14
0
13
0
1
1
2
16,168
NA
62,291 Sf 0
0
440 sf
NA
6,915
3
4
0
0
0
NA
Public
X PL 6.26.19
X JPo 7.22.19
X AS 9/6/19
X BM 9/6/19
X BM 9/6/19
45,531.66 65,433.33 0 X JD 9/5/19
X PH 7/30/19
15,302.91 13,742.80 0 X SW 8/14/19
X PH 8/19/19
13,742.80 8,065.20 0 X PM 7/20/19
9,815.00 0 X DR 8/14/19
8,065.20 0 9 /R MX
1,868.73
X7,134.00
06/17/2019
Bonnie Muhigirwa 9/6/19
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.