HomeMy WebLinkAboutFile Documents.650 S Monarch St.0179.2019 (4).ARBK07/11/2019
1926
2 Bedrooms, 3/4 Bath, Laundry Room, Mech Room
Living Room, Dining Room, Kitchen, 1/2 Bath
2 Bedrooms, Full Bath, 3/4 Bath
JH 8/27/19
1
2
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
07/11/2019
0179.2019.ARBK
UNIT 7 DOLOMITE VILLAS LLC
650 S MONARCH #7
273718292005
08/14/2019
James Jackson Romeo, PE
Structural Design Consultant, LLC
131 River Vista
Glenwood Springs, CO 81601
Phone: 970-945-4742
Email: jim@jjrstructural.com
July 10, 2019
Aspen-Telluride Real Estate & Development LLC Re: Dolomite Unit #7, 650 S. Monarch, Aspen CO
Gary Nichols
P.O. Box 8116
Aspen, CO 81611 Project No: 19020
Gary:
After reviewing the dg+a interior remodel drawings for the Dolomite Unit #7 remodel dated 7-2-19 and per our site visit
yesterday, we anticipate requiring one 6 ft floor beam at the Foyer and one door header at the Guest Bath for the proposed
remodel work. I will provide you with that structural framing info and inspect the completed work.
Let me know if you have any questions..
Thanks
James J. Romeo, PE
07/11/2019
08/27/2019
justinh
Per this project’s asbestos inspection report, your project
does not require a State asbestos abatement permit.
However, the following OSHA regulation must be
strictly adhered to: Standard Title 29, Part 1910.134,
1910.1001, and 1926.1101 of the Code of Federal
Regulations. It is recommended that you familiarize
yourself with these regulations and have a certified
General Abatement Contractor (GAC) conduct the removal
of the Asbestos Containing Material (ACM) under
engineering controls and that once the removal process is
completed, a visual inspection and clearance air
monitoring be conducted by an independent, certified Air
Monitoring Specialist. Furthermore, identified ACM may
be in areas which were either not covered in the scope of
the asbestos inspection or were inaccessible or hidden
due to their application during the construction process
and their subsequent enclosure or covering with building
and finish materials. These areas should be inspected
when renovation or demolition activities are scheduled
which may disturb the materials within, or beneath these
barriers.
07/11/2019
08/27/2019
justinh
07/11/2019
11,147.50
325.00
1,037.37
1,037.37
477.75
325.00
6,825.00
375.00
17,150.00
x PL 7.15.19
x
x
x
x
x
x
x
0179.2019.ARBK
0
0
0
0
0
JRB 8/14/19
L
JH 8/27/19
JH 8/27/19
PH 8/6/19
CS 8/20/19
07/11/2019
Listed assembly required to be installed at
all patches or repairs of demising wall that
are larger than 32 SF.08/27/2019
justinh
x
RESIDENTIAL REFERENCES FROM 2015 IBC
CV/CS = crawl space ventilation sec. 1203.4. 18” x 24” access required
1209.1
EE = emergency escape required sec 1030
EU = enclosed usable space under stairs shall be 1-hr construction or stair
enclosure rating. No access from stair enclosure. ½” gypsum permitted for
stairs inside a single dwelling unit. 1011.7.3.
RV = roof and rafter ventilation required 1203.2
A = Attic Access 20” x 30” 1209.2
SA = smoke alarm (NFPA 72) required sec 907.2.11
CO = carbon monoxide detector req. per Aspen Municipal Code 8.15
SG = safety glazing required sec 2406
V = mechanical ventilation required sec 1203.1 & IMC 403 (bath fans and
whole house ventilation)
GR = guards, 42” min ht, 4” max opening. Guards within dwelling unit 36” min
ht sec 1015
HR = handrails 34”-38” ht sec 1014
DS = Draft stopping / fire blocking 718
RD = Roof drainage 1503.4
STC = Sound transmission class not less than 50 at dwelling separations, sec
1207
SI = Stairway Illumination 1205.4
PD = protect against decay, sec 2304.12
REFERENCES FROM 2015 IMC
DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM
AS = access and service space for maintenance req’d, sec 306
MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2
ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes,
501.3.1
IT= intake openings 10’ from lot line & contaminant sources (vents, streets),
401.4
D = fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
DV = direct vent req’d, sec 303.3
CA = combustion air not taken from bedrooms, bathrooms or
storage sec 303.3
OD = outdoor appliances must be listed for outdoor use, sec 303.6
REFERENCES FROM 2015 IECC
F = new or replacement fenestration shall not exceed 0.28 U-factor, NFRC
label required, Ordinance 40, 2016
L = 75% of lamps in permanently installed lights must be high efficacy, sec
R404.1
SE = Continuous air barrier required; all exterior joints, cracks, and holes to be
caulked, gasketed, sealed, table R402.4.1.1
REFERENCES FROM 2014 NEC
EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26
DAM 9/4/19