Loading...
HomeMy WebLinkAboutFile Documents.728 E Hopkins Ave.0186.2019 (43).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK REFERENCES FROM 2015 IRC CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4 EE = emergency escape required sec R310.1 EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7 G/D = garage/dwelling separation, sec R302.5 and R302.6 STC = Sound transmission class not less than 45 at dwelling separations, app K RV = roof and rafter ventilation required, R806.1 A = attic access 22” x 30”, 30” headroom above, R807.1 SA = smoke alarms installed to NFPA 72 requirements, sec R314 CO = carbon monoxide detector per City Ordinance 41 series 2008 SG = safety glazing required, sec R308.4 GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36” horizontally, sec R312 WFP = window fall protection- operable window <24” AFF & >72” above grade: use opening control device listed to ASTM F2090, sec R312.2 HR = handrails 34”-38” ht, sec R311.7.8 SI = stairway illumination, sec R303.7 PD = protect against decay, sec R317 REFERENCES FROM 2015 IMC V = bathroom and balanced whole house mechanical ventilation req. Ordinance 40, 2016 DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0186.2019.arbk 0 0 0 NA NA TF Dwelling Separation Required - 2015 IBC -708 Fire Partitions, 711 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. Exhaust fans require ceiling radiation damper. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. Maintain existing 1-hr FR dwelling separation SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. Structural steel, epoxy-set anchors: S0.1, S.6.1 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 Scott Duryea Digitally signed by Scott Duryea Date: 2019.02.12 09:50:58 -07'00' 728 E. HOPKINS 0186.2019.ARBK 970-710-2938RYAN DOREMUS ryan@thunderbowlarchitects.com 970-710-2938RYAN DOREMUS ryan@thunderbowlarchitects.com RMJ HOPKINS LLC 2200 BUTTS RD. #220 BOCA RATON FL 33431 970-710-2938RYAN DOREMUS 300 S. SPRING ST ASPEN CO 81611 ryan@thunderbowlarchitects.com 970-710-2938THUNDERBOWL ARCHITECTS- Matthew Smith 300 S. SPRING ST ASPEN CO 81611 ryan@thunderbowlarchitects.com 970-963-3223Ernest Kollar Engineers, Inc. - Ernest Kollar 320 Main Street, Suite 203 Carbondale co 81623 erniekollar@gmail.com 970-927-9119RUDD CONSTRUCTION 9706187200 132 PARK AVE BASALT CO 81621 scott@ruddconstruction.com 07/10/19 07/31/2019 Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 BUILDING CODE INFORMATION 2015 IRC Existing?NFPA 13 NFPA 13 R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # 3/4 Baths ______ # 1/2 Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 13 D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviewed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ 2nd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ 3rd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION YesNo PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) _________________ _________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing + New) A__BB (A <50)F__H__I __ E R__S__ UM IRC IBC 2015 IBC (As Adopted and Amended) YesNo Required?YesNo Type January 2018 2015 IEBC (As Adopted and Amended) Other _____________ Gross Area of Building: __________ Gross Area of Unit: __________ Occupant Load: ___________ 0186.2019.ARBK 64 4197 sq.ft.9774 sq.ft. N/A n 2 1 2 5 4 227.19 SQFT 1 1 2 MEDIA ROOM, LAUNDRY, MECHANICAL, BUNK ROOM, BATHROOM 2, STORAGE, BEDROOM 2, CLOSET 2, HALLWAY, BEDROOM 1 CLOSET 1, BATHROOM 1 GARAGE, MUDROOM, GUEST MASTER, GUEST BATH, GUEST CLOSET, HALLWAY, ENTRY CLOSET, ENTRY, MASTERBEDROOM, MASTER CLOSET, MASTHER ABTHROOM POWDER ROOM, KITCHEN, LIVING ROOM, DINING ROOM, DECK 07/10/19 07/31/2019 X XXX X existing X NA 10/10/2019 10/14/2019 Sketch "NOT FOR CONSTRUCTION" without ASI no. Sketch Sketch Name: Project Name: Project Number: Sketch No. - Item No.: ASI Reference: Date: Scale:Drawing Sheet / Spec Section:300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 THUNDERBOWL ARCHITECTS 1-HR Rated Roof Assembly 728 E. HOPKINS AVE. 18011.00 10/04/2019 01-01 ASI 1 NOT TO SCALE - 10/14/2019 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of WorkNewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL BuildingReview BuildingPermit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%)CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County UseTax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 07/22/2019 0057.2019.ARBK 0186.2019.ARBK 728 E. HOPKINS 273707361001 HOPKINS ROAN CONDO RMJ HOPKINS LLC RYAN DOREMUS 970-710-2938 ryan@thunderbowlarchitects.com Updates to exterior deck, replacement of some existing exterior doors and windows, removing and replacing upper level fireplace 50,000 n 227.19 3,890 n/a 0 0 N/A 0 MU X LL 7/31/2019 X JRB 10/14/2019 X TF 10/10/2019 25.00 07/31/2019 0186.2019.ARBK RMU HOPKINS LLC 728 E HOPKINS 273707361001. DAM 10/21/19 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK NOTE - PER DISCUSSION WITH BD - NARRATIVE - THUNDER MOUNTAIN WILL INSPECT TIMBERWOLF WELDING AS THEY ARE NOT AN APPROVED FABRICATOR. THEN BECKY G. WILL INSPECT FIELD WELDS - TIM THOMPSON, RUDD 10/29/2019 728 E. Hopkins Ave.0186.2019.ARBK 10/29/2019 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 2. 4. 1 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. 2. 3. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. 2. 3. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. 2. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 10/29/2019 728 EAST HOPKINS 0186.2019.ARBK DAM DENIS MURRAY 10/29/19 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK FF109-350 1 Hour Fire Rated Light Cover TENMAT Inc. 23 Copper Drive Newport, DE 19804 T: 302-633-6600 F: 302-633-6838 E: info@tenmatusa.com The FF109-350 is the larger version of the FF109-300 and suitable for lights up to 8”. Both covers are made out of the same intumescent material and exhibit excellent thermal and acoustical insulating properties. The FF109-350 has an inside height of 10 3/8” and a diameter of 15” to fit the most common recessed light housings. Technical Product Specification Model Number Inside Height Outside Diameter FF109-350 10 3/8” 17” Performance Data For Use:  Warnock Hersey - Intertek certified to maintain the fire rating (1 hour) of fire-rated floor/ceiling assemblies. General Information Benefits:  60 minute protection.  Fits most popular recessed light fixtures.  For use with recessed incandescent, fluorescent or LED light fixtures.  Can be used in L500 floor/ceiling assemblies.  Lightweight (approx. 2.5 lbs).  Easy Installation - can be fitted in seconds - no screws, drilling or additional sealant required.  Flexible material enables the cover to be fitted around obstacles or retro-fitted.  Enhances the acoustic protection of the ceiling.  Maintenance free. Tested to ASTM E119 UBC 7 1 NFPA 251 ASI A2.1 10/21/2019 Model Number Inside Height Inside Diameter FF109-350 10 3/8” 15” Performance Data For Use: Warnock Hersey - Intertek certified to maintain the fire rating (1 hour) of fire-rated floor/ceiling assemblies. General Information Benefits: 60 minute protection. Fits most popular recessed light fixtures. Can be used in L500 floor/ceiling assemblies. Lightweight (approx. 2.5 lbs). Easy Installation - can be fitted in seconds - no screws, drilling or additional sealant required. Flexible material enables the cover to be fitted around obstacles or retro-fitted. Enhances the acoustic protection of the ceiling. Reduces heat loss through the fixture. Significant energy cost savings. Maintenance free. Manufactured By Tenmat Inc 23 Copper Drive Newport, DE 19804 Phone: (302) 633-6600 Fax: (302) 633-6838 Email: info@tenmatusa.com www.tenmatusa.com TENMAT MODEL FF109-350 Technical Product Specifications Tested to ASTM E119 UBC 7 1 NFPA 251 ASI A2.1 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK Specification Submittal Data Panasonic Radiation Damper for Combustible Assemblies Description: Radiation damper shall be assembled with select ENERGY STAR® rated ventilation fans, fan/lights and fans with motion/condensation sensors. Damper shall be UL and cUL listed for wood truss assemblies and meet UL 555C for use in 1 hour fire-rated floor/ceiling or roof/ ceiling assemblies as listed below. Damper shall exceed National Fire Protection Agency NFPA-90A. Features: • UL 555C listed for use in a 1 hour fire-rated wood truss floor/ceiling and roof/ceiling designs* • 165 degree Fahrenheit fusible link. • High-temperature, non-asbestos, reinforced fiber thermal fabric. • Galvanized steel frame. • Damper sleeve allows for fan/motor access for ongoing maintenance or framing/drywall/paint installation staging. • Drywall support installation after drywall to make fan/damper assembly meet UL Combustible Assemblies. UL listed assembly with Panasonic ENERGY STAR® models: WhisperGreen® Select™: FV-0511VK2, FV-0511VKL2,FV-0511VKS2, FV-0511VKSL2, FV-1115VKS2, FV-1115VKSL2, FV-05-11VK1. FV-05-11VKL1, FV-05-11VKS1, FV-05-11VKSL1, FV-11-15VK1, FV-11-15VKL1 WhisperCeiling®/WhisperCeiling® DC™: FV-05VQ5, FV-08VQ5, FV-08VQL5, FV-08VQL6, FV-11VQ5, FV-11VQL5, FV-11VQL6, FV-15VQ5, FV-15VQL5, FV-15VQL6 , FV-0511VQ1, FV-1115VQ1, FV-0511VQL1, FV-1115VQL1 WhisperSense®/WhisperSense® DC™: FV08VQC5, FV08VQCL5, FV-08VQCL6, FV-11VQC5, FV-11VQCL5, FV-11VQCL6, FV-0511VQC1, FV-0511VQCL1 WhisperFit®/WhisperFit® EZ™: FV-05VF2, FV-05VFL4, FV-05VFM2, FV-08-11VF5, FV-08-11VFL5, FV-08-11VFM5, FV-08VF2, FV-08VFL4, FV-08VFM2, FV-11VF2, FV-11VFL4 WhisperValue®/WhisperValue® DC™: FV-0510VS1, FV-0810VSS1, FV-0510VSC1, FV-0510VSL1, FV-0810VSSL1, FV-0510VSCL1, FV-05VS1, FV-05VS3, FV-08VS3, FV-08VSL3, FV-10VS1, FV-10VS3, FV-10VSL3, FV-10VS3E, FV-10VSL3E PC-RD05C5 Panasonic Eco Solutions North America Eco Products Divsion Two Riverfront Plaza Newark, NJ 07102 us.panasonic.com/ventfans For complete Installation Instructions visit us.panasonic.com/ventfans Model Quantity Comments Project: Location: Architect: Engineer: Contractor: Submitted by: Date: PC-RD05C5 3-1/4" 3-9/16" 3 3-9/16" 11-7/8" 3/8" 11-7/8" 11-7/8" 3- File #: 3225-1598:100 File #: WHI-495-PSH-0177, -0178 * UL 555C classification for the following 1 hour UL Wood Truss Assembly Ratings: L521, L528, L546, L558, L562, L574, L576, L581, L583, L585, M509; P522, P-533, P-538, P-545 and P-547. See following page for Non-Combustible Assembly application. 3-1/4" 3-9/16" 3/8" 3-9/16" 11-7/8" 3/8" 11-7/8" 11-7/8" 3-1/4" VF191136SS_ PC-RD05C5_Combust 10/21/2019 Specification Submittal Data Panasonic Radiation Damper for Non-Combustible Assemblies Description: Radiation damper shall be assembled with select ENERGY STAR® rated ventilation fans, fan/lightsand fans with motion/condensation sensors.Damper shall be UL and cUL listed for T-bar,hanger rod/wire ceiling installation and exceedUL 555C for use in 3-hour fire rated floor/ ceiling or roof/ceiling assemblies, Damper shall exceed National Fire Protection Agency NFPA- 90A. Features: • UL 555C listed for use in a 1, 2 or 3 hour fire rated floor/ceiling and roof/ceiling designs.* • 165 degree Fahrenheit fusible link. • High-temperature, non-asbestos, reinforced fiber thermal fabric. • Galvanized steel frame. • Damper sleeve allows for fan/motor access for ongoing maintenance or framing/drywall/paint installation staging. UL listed assembly with Panasonic ENERGY STAR® models: WhisperGreen® Select™: FV-0511VK2, FV-0511VKL2,FV-0511VKS2, FV-0511VKSL2, FV-1115VKS2, FV-1115VKSL2, FV-05-11VK1. FV-05-11VKL1, FV-05-11VKS1, FV-05-11VKSL1, FV-11-15VK1, FV-11-15VKL1 WhisperCeiling®/WhisperCeiling® DC™: FV-05VQ5, FV-08VQ5, FV-08VQL5, FV-08VQL6, FV-11VQ5, FV-11VQL5, FV-11VQL6, FV-15VQ5, FV-15VQL5, FV-15VQL6 , FV-0511VQ1, FV-1115VQ1, FV-0511VQL1, FV-1115VQL1 WhisperSense®/WhisperSense® DC™: FV-08VQC5, FV-08VQCL5, FV-08VQCL6, FV-11VQC5, FV-11VQCL5, FV-11VQCL6, FV- 0511VQC1, FV-0511VQCL1 WhisperFit®/WhisperFit® EZ™: FV-05VF2, FV-05VFL4, FV-05VFM2, FV-08-11VF5, FV-08-11VFL5, FV-08-11VFM5, FV-08VF2, FV-08VFL4, FV-08VFM2, FV-11VF2, FV-11VFL4 WhisperValue®/WhisperValue® DC™: FV-0510VS1, FV-0810VSS1, FV-0510VSC1, FV-0510VSL1, FV-0810VSSL1, FV-0510VSCL1, FV-05VS1, FV-05VS3, FV-08VS3, FV-08VSL3, FV-10VS1, FV-10VS3, FV-10VSL3, FV-10VS3E, FV-10VSL3E PC-RD05C5 Panasonic Eco Solutions North America Eco Products DivsionTwo Riverfront Plaza Newark, NJ 07102 us.panasonic.com/ventfans For complete Installation Instructions visit us.panasonic.com/ventfans Model Quantity Comments Project: Location: Architect: Engineer: Contractor: Submitted by: Date: PC-RD05C5 3-1/4" 3-9/16" 3 3-9/16" 11-7/8" 3/8" 11-7/8" 11-7/8" 3- * UL and Warnock Hersey 555C classification for 1, 2 or 3 hour Non-Combustible Assemblies. File #: 3225-1598:100 File #: WHI-495-PSH-0177, -0178 3-1/4" 3-9/16" 3/8" 3-9/16" 11-7/8" 3/8" 11-7/8" 11-7/8" 3-1/4" VF191136SS_ PC-RD05C5_Non_Combust 10/21/2019 FF109-350 1 Hour Fire Rated Light Cover TENMAT Inc. 23 Copper Drive Newport, DE 19804 T: 302-633-6600 F: 302-633-6838 E: info@tenmatusa.com The FF109-350 is the larger version of the FF109-300 and suitable for lights up to 8”. Both covers are made out of the same intumescent material and exhibit excellent thermal and acoustical insulating properties. The FF109-350 has an inside height of 10 3/8” and a diameter of 15” to fit the most common recessed light housings. Technical Product Specification Model Number Inside Height Outside Diameter FF109-350 10 3/8” 17” Performance Data For Use:  Warnock Hersey - Intertek certified to maintain the fire rating (1 hour) of fire-rated floor/ceiling assemblies. General Information Benefits:  60 minute protection.  Fits most popular recessed light fixtures.  For use with recessed incandescent, fluorescent or LED light fixtures.  Can be used in L500 floor/ceiling assemblies.  Lightweight (approx. 2.5 lbs).  Easy Installation - can be fitted in seconds - no screws, drilling or additional sealant required.  Flexible material enables the cover to be fitted around obstacles or retro-fitted.  Enhances the acoustic protection of the ceiling.  Maintenance free. Tested to ASTM E119 UBC 7 1 NFPA 251 ASI A2.1 10/21/2019 Model Number Inside Height Inside Diameter FF109-300 7 3/8” 13” Performance Data For Use: • UL Classified to maintain the fire rating (1 hour) for the following fire-rated floor/ceiling assemblies: UL L500 series General Information Benefits: • 60 minute protection. • Fits most popular IC rated fixtures. • Can be used in L500 floor/ceiling assemblies. • Lightweight (approx. 1.5 lbs). • Easy Installation - can be fitted in seconds - no screws, drilling or additional sealant required. • Flexible material enables cover to be fitted around obstacles or retro-fitted. • Enhances the acoustic protection of the ceiling. • Reduces heat loss through the fixture. • Significant energy cost savings. • Maintenance free. Manufactured By Tenmat Inc 23 Copper Drive Newport, DE 19804 Phone: (302) 633-6600 Fax: (302) 633-6838 Email: info@tenmatusa.com www.tenmatusa.com TENMAT MODEL FF109-300 Technical Product Specifications CLASSIFIED FOR FIRE RESISTANCE FIRE RESISTANCE CLASSIFICATION SEE UL FIRE RESISTANCE DIRECTORY 10/21/2019