Loading...
HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (30).ACBKCity of Aspen General/Building Permit Application 130 South Galena Street, Aspen Permit No.: Aspen, CO 81611 Phone (970) 920-5090 Fax (970) 920-5440 Master Permit No.: Unit #: Legal Description Block: PROJECT INFORMATION MECHANICAL NO.NO. FOR CITY USE ONLY Census Code Occupancy Group Zone District # of Stories # of Dwellings Type of Construction: APPROVALS Name Date Zoning Plan Check Permit Fee Parks Impact HPC Energy Code REMP School Ded. Building Zoning 50%Hourly Plan Check TDM Impact Fire District Eng. Review Zoning Hourly Review Ped. Amenity Engineering Cons. Mit. 50%Engineering Hourly Housing Cash- in-lieu CMP Parks Review Zoning 50%Stormwater fee in lieu Utilities Other Cons. Mit. 50%City Use Tax Water Electrical County Use Tax Sanitation Plumbing GIS Env. Health Mechanical Aspen San. Dist. Parks Utility Other Approved to issue by: Issued by: PERMIT TYPE: BD CO DE FD FN MH MS RF SN Gross Area This Permit (not FAR): Repair, Alteration, or Addition Water Closet (toilet), Bidet Bathtub Lavatory (wash basin) Total Fixture Count RECEIPTS: Fees due at Submittal: Shower Kitchen Sink & Disposal Dishwasher Laundry Bar, Utility Sinks Clothes Washer Floor Sink Floor Drain Hose Bib Square Footage Valuation PROJECT LOCATION Lot: Job Address: Parcel ID (call 920-5160) Valuation of Work: $ Tract or Subdivision: Const. Mit. Sq. Ft.:Disturbed Area:Utility Affected Area: Description of Work: Use of Building: Class of Work: Parks Affected Area:Existing Gross Area of Unit (not FAR): Fees due at Issuance: FEES Building Gross Sq. FootageAlarm System Req.Fire Sprinkler Req. Lot Area PLANS LOCATION: Occupancy Load Deed Restricted Unit Sq. Footage Accepted by: Other PLUMBING TYPE OF FIXTURE/ITEM PLUMBING continued Water Heater M/BTU ea. Gas Systems: # of Outlets Water Piping & Treating Equipment Other ELECTRICAL Forced Air/Gravity Sys. BTU____ AFUE_____ Air Handling Unit - CFM Wall, Suspended, or Unit Heaters Evaporative Coolers Snowmelt System Sq. Ft. Ventilation Fans Appliance Vents Range Hood Boilers, (includes vent) BTU_____ AFUE____ Gas Systems: # of Outlets TYPE OF EQUIPMENT Repair, Alteration, or Addition Gas Log Gas Appliance nonoyesyes Single Family Multi-Family Commercial/Residential Commercial OtherNewAdditionAlterationRepair Other Move Tenant Finish Demo Change Order 410 kBTU indirect WH 2x 500 btu 97.7%1x 400 btu 98%1x 600 btu 97.5% 0007.2017.ACBK 75A-C 273707337001City and Townsite of Aspen Demolish existing Hotel Lenado and build a new hotel 8,446,400 21116 6165 0 12,906.75 200 190 4 09 19 11 110 0 10 0 2 84 24 8 116 1642 120 4,367.75 7/10/17 4/18/17 12/28/17 48 213 R1, R2, A2, S2 2198 22,536 CS 27,437.92 0 6/26/17 65,729.95 101,123.00 150,907.4315,168.45 45,459.56 12/20/17 17,948.60 12/20/17 16,683.21 3,071.04 MH TK MH NT NT 7/05/17 8,177.90 270.004/14/17 17,948.60 12/28/17 3/2/17 12/28/17 8,177.90 87,177.90 500.00 21,116.00 PM SW 35,393.05 82,637.20LO DR DAM 200 S Aspen, Aspen, CO 81611 4 4 8,970 21,116 BD VB 4 4 4 4 4 4 4 4 4 4 4 4 1 Received 2/8/17 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK FIRE SPRINKLERS REQUIRED SPECIAL INSPECTION REQUIRED Special inspection is required per 2009 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. See list on S-001 City of Aspen Received 7/10/17 Building Department NT Nick Thompson 11/2/17 0007.2017.ACBK 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. 2. 3. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. 2. 3. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. 2. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 2. 4. 1 0007.2017.ACBK200 S Aspen 12/19 / 2 0 1 7 nickt Note: Accessible pool lift must be on site prior to final inspection. IBC Building Description Form New Gdrive/master files/building/apps, forms checklists 8/28/14 MASTER PERMIT#_______________________________ CHANGE ORDER #_______________________________ CHANGE ORDER #_______________________________ CHANGE ORDER #_______________________________ Building Description Form - IBC Property Location: Address: Unit #: Legal Description: (lot, Block) Owner: Owner Address: Parcel ID #: Building Code Information Code Editions: 2009 IBC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____ Fire Alarm Installed: ______NO _____YES Type of Construction: _____VA _____VB _____IVA _____IIIA _____IIIB _____IIA _____IIB _____IA _____IB Occupancy Group(s) _____A-1 2 3 4 5 _____B _____E _____F-1 2 _____H-1 2 3 4 5 _____I-1 2 3 4 _____M _____R-1 2 3 4 _____S-1 2 _____U _____Separated Occupancies _____Non-Separated Occupancies Occupant Load(s) Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding ____Permanent Micropiles _____Other (specify): ______________________ Energy Code Compliance Path: COMMERCIAL: ____Prescriptive Table ____COMCheck U-factor Alternative ____COMCheck UA Alternative ____Total Building Performance RESIDENTIAL: ____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____ Building Description # Stories Above Grade Plane_______ # Stories Below Grade Plane ________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ Reviewed by Plans Examiner Date 200 S Aspen, Aspen, CO 81611 CITY AND TOWNSITE OF ASPEN Block: 75 Lot: A AND: Lot: Thru C DCBD2 LLC 2100 Ross Ave, Suite 3300, Dallas, TX 75201 273707337001 X 13 and 13R X X X X X X X 0 4,367.75 X X 2 2 Diagram on Sheet A-010 X S-2: 27 ; R-1: 139; R-2: 90 Received 2/8/17 0007.2016.ACBK 2017 x x Roof: private rooftop deck serving the free market units with pool and spa 2nd floor: 2 free market units 1st floor: 2 hotel lodge units, 2 affordable housing units, common game lounge/bar, private garage, storage Basement: main entry lobby, 7 hotel lodge units, common library Sub-basement: parking garage, employee lounge, laundry, storage, mechanical NT 12/20/17 ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08 Verification of Building Location by Building Contractor For Building and Permit Information, please refer to our website at: http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building / Job Address or Location: _____________________________________________ o Your Name (Person Completing Part A): ____________________________________________ o Your Company: ________________________________________________________________ o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary. Are building ties shown? (circle one) ‘Yes’ ‘No’ o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? _________________________________ o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’ o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation: (i.e., 100’ first floor elev = 7962.50’) _______________________________ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’ o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________ o According to the building plans, what was the design elevation for the same place on the foundation wall? ______________________________ o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’ o If yes, why? ________________________________________________ The undersigned qualified individual certifies that the information in Part B is accurate - Signature: Date: _ Printed Name: Contact ph. # : ____________________ Company: ______________________________________________________________ 200 S Aspen, Aspen, CO 81611 Ryan Walterscheid Forum Phi Site Benchmark = 7901.14' (located at South West corner of site) 100' t.o. slab main level = 7896' Received 2/8/17 x External Energy Use Approved RREMP CREMP PERMIT #DATE SNOWMELT _____________________________ POOL _____________________________ SPA _____________________________ OFFSET:________________________________ REMP SHEET: ___________________________ REVIEWED BY: _________________________ 4 nickt 12/20/20170007.2017.ACBK 4520 sqft (40 of which is exempt) 161.75 sqft 58.25 sqft A-002 SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) 20.26kW PV, 360kBtu GSHP 4 READ THIS OR FAIL YOUR INSPECTION! Furred & Dropped Ceilings, Soffits, and Walls 2009 IBC 803.13 This applies to the attachment of finishes or furring to any assemblies that are required to be either fire-rated or non-combustible and is separate from the fire-rated assembly requirement. Walls, Ceilings & Soffits: If furred 1 ¾ inches or less, do one of the following: 4.Fill spaces with Class A material. 5.Fill spaces with inorganic or non-combustible material. 6.Fire block 8 feet in all directions. Walls: If set out (furred) greater than 1 ¾ inches, do one of the following: 4.Use a Class A finish material (such as drywall). 5.Use non-combustible framing. 6.Protect both sides with fire sprinklers. Ceilings & Soffits: If dropped (furred) greater than 1 ¾ inches: Framing members, hangers, and other assembly members must be non-combustible. You may not use wood. In Type III and V construction only, you may use fire retardant treated wood or non-combustible framing. Dwelling Separation Required - 2009 IBC -709 Fire Partitions, 712 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -713: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. 12/20 / 2 0 1 7 nickt 198 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 General/Building Permit Application Page 2 Permit No.: Master Permit No.: For Plan Review Questions For Inspection Questions Alternate Phone No. Alternate Phone No. Alternate Phone No. Alternate Phone No. ELECTRICAL CONTRACTOR Alternate Phone No. MECHANICAL CONTRACTOR Alternate Phone No. PLUMBING CONTRACTOR Alternate Phone No. DateContractor Signature:Print Name City License No. Phone No. USE TAX:The General Contractor or Owner Builder is required to pay a Use Tax Deposit to both the City of Aspen (2.1%, first $100,000 is exempt) and Pitkin County (0.5%, no exemption) on the building permit at the time of issuance. I hereby certify that I have read and examined this application and know the same tobe true and correct.All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced unless approval is received from the Chief Building Official. City License No. Name Phone No. Check if you are a tested owner builder (single family only). You must take a test and complete the owner/building affidavit OWNER'S AUTHORIZED AGENT Name:Phone No.Alternate Phone No. City: City: CONTACT INFORMATION Name Phone No. Email Contact Name: Contact Name:Phone No. Phone No. STRUCTURAL ENGINEER OF RECORD PLEASE PROVIDE ANY ADDITIONAL INFORMATION THAT MAY HELP US CONTACT YOU FOR ANY QUESTIONS REGARDING YOUR BUILDING PERMIT APPLICATION Name Mailing address City Zip Phone No. LANDSCAPE ARCHITECT OF RECORD City Name E-mail Address: Alternate Phone No. OWNER GENERAL CONTRACTOR Zip: Name:Phone No. E-mail Address: Name: Mailing address: Phone No. E-mail Address ARCHITECT OR DESIGNER OF RECORD Mailing address: Mailing address: City: Mailing address Zip Phone No. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file INSPECTIONS: The General Contractor must schedule inspections online at www.aspenpitkin.com/Departments/Community-Development-Forms/ Zip: Zip: E-mail Address: Phone No. Zip Name Email City License No. E-mail Address E-mail Address Mailing address City Name Email 0007.2017.ACBK 970-797-4880 970-319-2232 for email correspondence- ldunn@forumphi.com td@dundon.co rwalterscheid@forumphi.com chris@madiganco.co rwalterscheid@forumphi.com sellsperman@dhmdesign.com Jeff Myers; c/o KL&A jmyers@klaa.com Lori Dunn Chris Madigan Stephen Ellsperman; c/o DHM Design Ryan Walterscheid; c/o Forum Phi Chris Madigan Ryan Walterscheid; c/o Forum Phi DCBD2 LLC 274-9598 274-9598 319-2232 303-575-9510 970-963-6520 970-279-4157 970-279-4157 75201Dallas2100 Ross Ave, Suite 3300 725 W Main St, Suite 204 Aspen 81611 PO Box 9682 Aspen 81612 725 W Main St, Suite 204 Aspen 81611 311 Main Street, Suite 102 Carbondale 81623 1875 Lawrence Street, #700 Denver 80202 Received 2/8/17 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK COMcheck Software Version 4.0.7.1 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 200 S Aspen St Aspen, CO 81611 Owner/Agent:Designer/Contractor: Aaron Humphrey Alpenglow Lighting Design, Inc 4341 CR 113 Carbondale, CO 81623 970-948-2637 aaron@alpenglowinc.com Project Information Energy Code: Hotel Lenado Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Hotel 18425 0.78 14427 14427Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures 1-Hotel LED 1: L1: RECESSED DOWNLIGHT: LED Other Fixture Unit 16W:1 160 18 2880 LED 1 copy 1: L1: RECESSED DOWNLIGHT: LED Other Fixture Unit 16W:1 45 18 Exempt Exemption:Sleeping Unit Lighting LED 3: L3: RECESSED SHOWER LIGHT: LED Other Fixture Unit 13W:1 9 12 108 LED 5: L5: LINEAR LED COVE/UNDERCAB SYSTEM: LED Other Fixture Unit 103W:1 3 100 300 LED 6: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 22 100 2200 LED 6 copy 2: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 28 60 Exempt Exemption:Sleeping Unit Lighting LED 6 copy 1: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 19 60 Exempt Exemption:Furniture-mounted Supplemental Task Lighting LED 7: L6: 6" SURFACE SHALLOW: LED Other Fixture Unit 13W:1 14 14 Exempt Exemption:Sleeping Unit Lighting LED 8: L7: LED LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 10 60 Exempt Exemption:Sleeping Unit Lighting LED 10: L9: 9" SURFACE SHALLOW: LED Other Fixture Unit 16W:1 55 17 935 LED 11: L10: ELEVATOR PIT LIGHT: LED Other Fixture Unit 40W:1 3 32 96 LED 12: L11: LINEAR INDUSTRIAL: LED Other Fixture Unit 40W:1 21 43 903 LED 13: L12: ADA SCONCE: LED Other Fixture Unit 46W:1 6 25 150 LED 14: L13: STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 28W:1 1 30 30 LED 15: L14: LINER SLOT (PER FOOT): LED Linear 8W:1 80 7 560 Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 91 ofPage 11/27/17 12/19 / 2 0 1 7 nickt E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures LED 17: L15A: DECORATIVE PENDANT: LED Other Fixture Unit 125W:1 1 160 160 LED 19 copy 1: L16: downlight: LED Other Fixture Unit 16W:1 43 10 430 LED 19: L17: DECORATIVE PENDANT: LED Other Fixture Unit 16W:1 5 50 250 LED 20: L18: FLOOR LAMP: LED Other Fixture Unit 16W:1 10 18 180 LED 21: L19: MINI BOLLARD: LED Other Fixture Unit 6.5W:1 5 9 45 LED 22: L20: READING LIGHT: LED Other Fixture Unit 13W:1 24 9 Exempt Exemption:Sleeping Unit Lighting LED 23: L21: DOWNLIGHT: LED Other Fixture Unit 28W:1 4 2 6 LED 24: L22: DECORATIVE: LED Other Fixture Unit 16W:1 6 10 60 LED 26: L24: LED TAPE: LED Other Fixture Unit 13W:1 8 50 Exempt Exemption:Sleeping Unit Lighting LED 27: L25: PENDANT: LED Other Fixture Unit 13W:1 2 30 60 LED 30: D: DECORATIVE: LED A Lamp 13W:1 28 14 392 LED 30: X1: EXIT: LED Other Fixture Unit 6.5W:1 18 6 Exempt Exemption:Exit Signs, Safety or Emergency Lighting 9745Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES: Design 32% better than code Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 92 ofPage Aaron J. Humphrey, President 11/09/17 11/27/17 12/19 / 2 0 1 7 nickt COMcheck Software Version 4.0.7.1 Exterior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 200 S Aspen St Aspen, CO 81611 Owner/Agent:Designer/Contractor: Aaron Humphrey Alpenglow Lighting Design, Inc 4341 CR 113 Carbondale, CO 81623 970-948-2637 aaron@alpenglowinc.com Project Information Energy Code: Hotel Lenado 2 (Neighborhood business district)Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / Unit D Tradable Wattage E Allowed Watts (B X C) SIDEWALK (Walkway < 10 feet wide)2590 ft of 0.7 Yes 1813 ROOF DECK (Special feature area)1445 ft2 0.14 Yes 202 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 2015 2015 600 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures SIDEWALK ( Walkway < 10 feet wide 2590 ft of walkway length): Tradable Wattage LED 1: L13: LED STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 46W:1 1 30 30 LED 5: L21: FRAME LIGHT (POWER SUPPLY): LED Other Fixture Unit 103W:1 7 100 700 LED 6: L2: RECESSED DOWNLIGTH: LED Other Fixture Unit 6.5W:1 1 12 12 LED 7: L23: SCONCE: LED Other Fixture Unit 95W:1 3 100 300 ROOF DECK ( Special feature area 1445 ft2): Tradable Wattage LED 1 copy 1: L13: LED STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 46W:1 1 30 30 LED 3: L18: FLOOR LAMP: LED Other Fixture Unit 16W:1 6 18 108 LED 4: L19: MINI BOLLARD: LED Other Fixture Unit 6.5W:1 2 9 18 1198Total Tradable Proposed Watts = Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 93 ofPage 11/27/17 12/19 / 2 0 1 7 nickt Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES: Design 54% better than code Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 94 ofPage Aaron J. Humphrey, President 11/09/17 11/27/17 12/19 / 2 0 1 7 nickt Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.7.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 95 ofPage X X X 11/27/17 12/19 / 2 0 1 7 nickt Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Exception: Lighting that is related to means of egress in stairways, ramps, corridors, or emergency routes. C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Exception: Lighting controlled by occupancy sensors. C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.5 [EL25]null Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 96 ofPage X X X X X X X X X X X 11/27/17 12/19 / 2 0 1 7 nickt Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C405.5.1 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 98 ofPage X X X X X 11/09/17 Comments/Revisions: 1. Removed egress lighting exemption from interior common space fixtures. 2. Revised interior fixture counts to remove fixtures from AHU residential units. 3. Revised interior exemptions for sleeping unit lighting. 4. Moved certain exterior fixtures previously exempted as egress lighting on interior count to exterior count. 11/27/17 12/19 / 2 0 1 7 nickt 12/20 / 2 0 1 7 nickt REScheck Software Version 4.6.2 Compliance Certificate Project Hotel Lenado Energy Code:2015 IECC Location:Aspen, Colorado Construction Type:Single-family Project Type:New Construction Conditioned Floor Area:3,899 ft2 Glazing Area 27% Climate Zone:7 (9922 HDD) Permit Date: Construction Site: City & Townsite of Aspen block 75. Lot A thru C Aspen, CO 81611 Owner/Agent: Lori Gerety Forum Phi 715 W. Main St. Ste 204 Aspen, CO 81611 970-279-4157 lgerety@forumphi.com Designer/Contractor: Martin Zourek AEC PO Box 8489 40801 US 6 & 24, Ste 214 Avon, CO 81620 970-748-8520 martin@aec-vail.com Permit Number: Compliance: Passes using UA trade-off 0.3% Better Than Code Maximum UA:584 Your UA:582 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Wall 1 - west: Steel Frame, 24" o.c.944 21.0 10.0 0.048 35 Window 1: Metal Frame with Thermal Break:Double Pane 27 0.310 8 Door 1: Glass 198 0.320 63 Wall 2 - north: Steel Frame, 24" o.c.982 21.0 10.0 0.048 43 Window 2: Metal Frame with Thermal Break:Double Pane 96 0.310 30 Wall 3 - south: Steel Frame, 24" o.c.862 21.0 10.0 0.048 23 Window 3: Metal Frame with Thermal Break:Double Pane 277 0.290 80 Door 2: Glass 99 0.310 31 Wall 4 - east: Steel Frame, 24" o.c.977 21.0 10.0 0.048 30 Window 4: Metal Frame with Thermal Break:Double Pane 187 0.310 58 Door 3: Glass 169 0.320 54 Wall 5: Steel Frame, 24" o.c.33 0.0 0.0 0.270 9 Wall 6: Steel Frame, 24" o.c.20 0.0 0.0 0.270 5 Wall 7: Steel Frame, 24" o.c.25 0.0 0.0 0.270 7 Wall 8: Steel Frame, 24" o.c.30 0.0 0.0 0.270 8 Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 1 of10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Ceiling 1 - top deck: Flat Ceiling or Scissor Truss 1,941 49.0 0.0 0.026 50 Ceiling 2: Steel Joist/Rafter, 24" o.c.:2x6 2,684 49.0 10.0 0.018 48 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 2 of10 06/23/17Report date: Martin Zourek, M.E.06/23/2017 City of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 1 of 10 COMcheck Software Version 4.0.5.2 Envelope Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Title: Hotel Lenado Project Type: New Construction Construction Site:Owner/Agent:Designer/Contractor: City & Townsite of Aspen block 75. Lot A thru C Aspen, CO 81611 Lori Gerety Forum Phi 715 W. Main St Ste 204 Aspen, CO 81611 970-279-4157 ldunn@forumphi.com Martin Zourek AEC P.O.Box 8489 40801 US 6 & 24, Ste 214 Avon, CO 81620 970-748-8520 martin@aec-vail.com Building Location (for weather data):Aspen, Colorado Climate Zone:7 Vertical Glazing / Wall Area Pct.:25% Building Use: Activity Type(s)Floor Area 1-Hotel : Nonresidential 18425 Section 2: Envelope Assemblies and Requirements Checklist Envelope PASSES: Design 1% better than code. Envelope Assemblies: Component Name/Description Gross Area or Perimeter Cavity R-Value Cont. R-Value Proposed U-Factor Budget U-Factor(a) Orientation: NORTH Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light Density, Furring: Metal, Wall Ht 18.0, Depth B.G. 18.0, [Bldg. Use 1 - Hotel] 1470 21.0 0.0 0.109 0.108 Exterior Wall 1: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1310 21.0 0.0 0.090 0.064 Window 1: Metal Frame with Thermal Break, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 399 ------0.350 0.450 Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 128 ------0.300 0.800 Exterior Wall 5: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]8 0.0 0.0 0.338 0.064 Orientation: EAST Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light Density, Furring: Metal, Wall Ht 23.0, Depth B.G. 13.0, [Bldg. Use 1 - Hotel] 1266 21.0 0.0 0.109 0.108 Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light Density, Furring: Metal, Wall Ht 23.0, Depth B.G. 23.0, [Bldg. Use 1 - Hotel] 837 21.0 0.0 0.109 0.108 Exterior Wall 3: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1141 21.0 0.0 0.090 0.064 Window 3: Metal Frame with Thermal Break, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 181 ------0.350 0.450 Door 5: Glass (> 50% glazing):Metal Frame, Non-Entrance Door, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 72 ------0.300 0.450 Exterior Wall 7: Wood-Framed, 24" o .c., [Bldg. Use 1 - Hotel]3 0.0 0.0 0.298 0.051 Orientation: SOUTH Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light Density, Furring: Metal, Wall Ht 23.5, Depth B.G. 23.5, [Bldg. Use 1 - Hotel] 1488 21.0 0.0 0.109 0.108 City of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 2 of 10 Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light Density, Furring: Metal, Wall Ht 23.0, Depth B.G. 21.0, [Bldg. Use 1 - Hotel] 318 21.0 0.0 0.109 0.108 Exterior Wall 4: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1166 21.0 0.0 0.090 0.064 Door 6: Glass (> 50% glazing):Metal Frame, Non-Entrance Door, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 48 ------0.300 0.450 Door 7 Garage door: Other Door, Non-Swinging, [Bldg. Use 1 - Hotel] 164 ------0.600 0.500 Door 8: Glass (> 50% glazing):Metal Frame, Non-Entrance Door, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 21 ------0.300 0.450 Exterior Wall 8: Wood-Framed, 24" o .c., [Bldg. Use 1 - Hotel]5 0.0 0.0 0.298 0.051 Orientation: WEST Basement Wall Lower LVL: Solid Concrete:12" Thickness, Light Density, Furring: Metal, Wall Ht 13.0, Depth B.G. 13.0, [Bldg. Use 1 - Hotel] 1217 21.0 0.0 0.109 0.108 Exterior Wall 2: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1665 21.0 0.0 0.090 0.064 Window 2: Metal Frame with Thermal Break, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 530 ------0.350 0.450 Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c) 78 ------0.320 0.800 Exterior Wall 6: Wood-Framed, 24" o .c., [Bldg. Use 1 - Hotel]9 0.0 0.0 0.298 0.051 Orientation: UNSPECIFIED ORIENTATION Roof 2 Lower decks: Metal Building, Screw Down, [Bldg. Use 1 - Hotel] 1685 49.0 0.0 0.098 0.049 (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b) 'Other' components require supporting documentation for proposed U-factors. (c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Air Leakage, Component Certification, and Vapor Retarder Requirements: q 1.All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions. q 2.Windows, doors, and skylights certified as meeting leakage requirements. q 3.Component R-values & U-factors labeled as certified. q 4.No roof insulation is installed on a suspended ceiling with removable ceiling panels. q 5.'Other' components have supporting documentation for proposed U-Factors. q 6.Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. q 7.Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. q 8.Cargo doors and loading dock doors are weather sealed. q 9.Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. q 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: q Building entrances with revolving doors. q Doors not intended to be used as a building entrance. q Doors that open directly from a space less than 3000 sq. ft. in area. q Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. q Doors opening directly from a sleeping/dwelling unit. Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck Version 4.0.5.2 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature DateMartin Zourek, M.E.06/23/2017City of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 3 of 10 COMcheck Software Version 4.0.5.2 Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Title: Hotel Lenado Project Type: New Construction Construction Site:Owner/Agent:Designer/Contractor: City & Townsite of Aspen block 75. Lot A thru C Aspen, CO 81611 Lori Gerety Forum Phi 715 W. Main St Ste 204 Aspen, CO 81611 970-279-4157 ldunn@forumphi.com Martin Zourek AEC P.O.Box 8489 40801 US 6 & 24, Ste 214 Avon, CO 81620 970-748-8520 martin@aec-vail.com Section 2: General Information Building Location (for weather data):Aspen, Colorado Climate Zone:7 Section 3: Mechanical Systems List Quantity System Type & Description 3 HVAC GEO thermal (Single Zone) : Ground Source Heat Pump Heating Mode: Capacity = 100 kBtu/h, Proposed Efficiency = 3.10 COP, Required Efficiency = 3.10 COP Cooling Mode: Capacity = 101 kBtu/h, Proposed Efficiency = 13.40 EER, Required Efficiency: 13.40 EER Fan System: None 3 Hydronic unit heaters (Unknown) : Heating: 3 each - Unit Heater, Hot Water, Capacity = 31300 kBtu/h No minimum efficiency requirement applies Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp 1 Hydronic unit heaters (Unknown) : Heating: 1 each - Unit Heater, Hot Water, Capacity = 18400 kBtu/h No minimum efficiency requirement applies Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp 1 Hydronic unit heaters (Unknown) : Heating: 1 each - Unit Heater, Hot Water, Capacity = 24800 kBtu/h No minimum efficiency requirement applies Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp 1 HVAC System 5 (Unknown) : Heating: 1 each - Unit Heater, Hot Water, Capacity = 21230 kBtu/h No minimum efficiency requirement applies Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes Fans:City of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 4 of 10 FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp 1 Baseboards (Single Zone w/ Perimeter System) : Heating: 1 each - Radiant Heater, Hot Water, Capacity = 9898 kBtu/h No minimum efficiency requirement applies Fan System: None 1 Electric Duct Heaters (Unknown) : Heating: 1 each - Unit Heater, Electric, Capacity = 20130 kBtu/h No minimum efficiency requirement applies Fan System: None 1 Electric Duct Heaters (Unknown) : Heating: 1 each - Unit Heater, Electric, Capacity = 3412 kBtu/h No minimum efficiency requirement applies Fan System: None 1 Electric Duct Heaters (Unknown) : Heating: 1 each - Unit Heater, Electric, Capacity = 4777 kBtu/h No minimum efficiency requirement applies Fan System: None 1 Electric Duct Heaters (Unknown) : Heating: 1 each - Unit Heater, Electric, Capacity = 6483 kBtu/h No minimum efficiency requirement applies Fan System: None 1 Electric Unit Heater (Unknown) : Heating: 1 each - Unit Heater, Electric, Capacity = 6396 kBtu/h No minimum efficiency requirement applies Fan System: Electric Unit Heaters | All levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 275 CFM, 2.5 motor nameplate hp 1 Electric Unit Heater (Unknown) : Heating: 2 each - Unit Heater, Electric, Capacity = 2560 kBtu/h No minimum efficiency requirement applies Fan System: Electric Unit Heaters | All levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 275 CFM, 2.5 motor nameplate hp 8 Fan coils CDVB-04 (Single Zone) : Heating: 8 each - Hydronic or Steam Coil, Hot Water, Capacity = 2500 kBtu/h No minimum efficiency requirement applies Cooling: 8 each - Hydronic Coil, Capacity = 3200 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coils | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 3 Supply, Constant Volume, 370 CFM, 0.2 motor nameplate hp 1 Fan coils H-08 (Single Zone) : Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 16000 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Hydronic Coil, Capacity = 19000 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coils | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 3 Supply, Constant Volume, 370 CFM, 0.2 motor nameplate hp 2 Fan coils CDVB-08 (Single Zone) : Heating: 2 each - Hydronic or Steam Coil, Hot Water, Capacity = 10400 kBtu/h No minimum efficiency requirement applies Cooling: 2 each - Hydronic Coil, Capacity = 11500 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coil 3 | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 5 Supply, Constant Volume, 565 CFM, 0.3 motor nameplate hp 1 Fan coils CDVB-16 (Single Zone) : Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 21000 kBtu/h No minimum efficiency requirement appliesCity of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 5 of 10 Cooling: 1 each - Hydronic Coil, Capacity = 20900 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coil 4 | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 6 Supply, Constant Volume, 1135 CFM, 0.3 motor nameplate hp 2 Fan coils H-20 (Single Zone) : Heating: 2 each - Hydronic or Steam Coil, Hot Water, Capacity = 99200 kBtu/h No minimum efficiency requirement applies Cooling: 2 each - Hydronic Coil, Capacity = 45200 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coil 2 | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 4 Supply, Constant Volume, 990 CFM, 0.5 motor nameplate hp 1 Fan coils H16 (Single Zone) : Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 26400 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Hydronic Coil, Capacity = 30300 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coil 4 | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 6 Supply, Constant Volume, 1135 CFM, 0.3 motor nameplate hp 1 Fan coils VB-25 (Single Zone) : Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 36900 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Hydronic Coil, Capacity = 40700 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: Fan Coil 5 | All Levels -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 7 Supply, Constant Volume, 2290 CFM, 0.8 motor nameplate hp 3 Boilers B-1, B-2, B-3: Heating: Hot Water Boiler, Capacity 500 kBtu/h, Gas Proposed Efficiency: 97.00 % Et, Required Efficiency: 75.00 % Et 1 Boilers B-4: Heating: Hot Water Boiler, Capacity 400 kBtu/h, Gas Proposed Efficiency: 97.00 % Et, Required Efficiency: 75.00 % Et 1 Water Heater 1: Gas Storage Water Heater, Capacity: 504 gallons, Input Rating: 75 Btu/h w/ Circulation Pump No minimum efficiency requirement applies Section 4: Requirements Checklist Requirements Specific To: HVAC GEO thermal : q 1.Equipment minimum efficiency: Heat Pump: 3.10 COP 13.40 EER Requirements Specific To: Hydronic unit heaters : q 1.Balancing and pressure test connections on all hydronic terminal devices Requirements Specific To: Hydronic unit heaters : q 1.Balancing and pressure test connections on all hydronic terminal devices Requirements Specific To: Hydronic unit heaters : q 1.Balancing and pressure test connections on all hydronic terminal devices Requirements Specific To: HVAC System 5 : q 1.Balancing and pressure test connections on all hydronic terminal devices Requirements Specific To: Baseboards : q 1.Balancing and pressure test connections on all hydronic terminal devices Requirements Specific To: Electric Duct Heaters : NoneCity of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 6 of 10 Requirements Specific To: Electric Duct Heaters : None Requirements Specific To: Electric Duct Heaters : None Requirements Specific To: Electric Duct Heaters : None Requirements Specific To: Electric Unit Heater : None Requirements Specific To: Electric Unit Heater : None Requirements Specific To: Fan coils CDVB-04 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have: a) 15 degrees F deadband where boiler and chiller can not operate, b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Fan coils H-08 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have: a) 15 degrees F deadband where boiler and chiller can not operate, b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Fan coils CDVB-08 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have: a) 15 degrees F deadband where boiler and chiller can not operate,City of Aspen Received 7/10/17 Building Department 12/20 / 2 0 1 7 nickt The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 7 of 10 b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Fan coils CDVB-16 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have: a) 15 degrees F deadband where boiler and chiller can not operate, b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Fan coils H-20 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have: a) 15 degrees F deadband where boiler and chiller can not operate, b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Fan coils H16 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have:City of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 8 of 10 a) 15 degrees F deadband where boiler and chiller can not operate, b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Fan coils VB-25 : q 1.Discharge dampers prohibited with fan motors > 25 hp q 2.Balancing and pressure test connections on all hydronic terminal devices q 3.Multiple boilers must have automatic controls that sequence operation with load q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner q 5.Two-pipe changeover heating/cooling controls must have: a) 15 degrees F deadband where boiler and chiller can not operate, b) allow operation in either heating or cooling for at least 4 hrs. and c) prevent difference between heating and cooling set points greater than 30 degrees F Exception(s): q Air/evap condenser and extensive outside-air filtration q 6.Meets the condenser heat recovery requirement for service water heating Exception(s): q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are not operating q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not operating Requirements Specific To: Boilers B-1, B-2, B-3 : q 1.Equipment minimum efficiency: Boiler Thermal Efficiency 75% Et 80% Ec q 2.Newly purchased heating equipment meets the efficiency requirements - used equipment must meet 80% Et @ maximum capacity q 3.Systems with multiple boilers have automatic controls capable of sequencing boiler operation q 4.Hydronic heating systems comprised of a single boiler and >500 kBtu/h input design capacity include either a multistaged or modulating burner Requirements Specific To: Boilers B-4 : q 1.Equipment minimum efficiency: Boiler Thermal Efficiency 75% Et 80% Ec q 2.Newly purchased heating equipment meets the efficiency requirements - used equipment must meet 80% Et @ maximum capacity q 3.Systems with multiple boilers have automatic controls capable of sequencing boiler operation q 4.Hydronic heating systems comprised of a single boiler and >500 kBtu/h input design capacity include either a multistaged or modulating burner Requirements Specific To: Water Heater 1 : q 1.Water heating equipment meets minimum efficiency requirements: Gas Storage Water Heater efficiency: No efficiency requirement applies. q 2.All piping in circulating system insulated q 3.Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units. q 4.Automatic time control of heat tapes and recirculating systems present q 5.Controls will shut off operation of circulating pump between water heater/boiler and storage tanks within 5 minutes after end of heating cycle Generic Requirements: Must be met by all systems to which the requirement is applicable: q 1.Plant equipment and system capacity no greater than needed to meet loadsCity of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 9 of 10 Exception(s): q Standby equipment automatically off when primary system is operating q Multiple units controlled to sequence operation as a function of load q 2.Minimum one temperature control device per system q 3.Minimum one humidity control device per installed humidification/dehumidification system q 4.Load calculations per ASHRAE/ACCA Standard 183. q 5.Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup Exception(s): q Continuously operating zones q 6.Outside-air source for ventilation; system capable of reducing OSA to required minimum q 7.R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly Exception(s): q Ducts located within equipment q Ducts with interior and exterior temperature difference not exceeding 15°F. q 8.Mechanical fasteners and sealants used to connect ducts and air distribution equipment q 9.Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics q 10.Hot water pipe insulation: 1.5 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigerant/brine pipe insulation: 1.5 in. for pipes <=1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes <=1.5 in. and 3 in. for pipes >1.5 in. Exception(s): q Piping within HVAC equipment. q Fluid temperatures between 55 and 105°F. q Fluid not heated or cooled with renewable energy. q Piping within room fan-coil (with AHRI440 rating) and unit ventilators (with AHRI840 rating). q Runouts <4 ft in length. q 11.Operation and maintenance manual provided to building owner q 12.Thermostatic controls have 5°F deadband Exception(s): q Thermostats requiring manual changeover between heating and cooling q Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority having jurisdiction. q 13.Hot water distribution systems >= 300 kBtu/h must have one of the following: a) controls that reset supply water temperature by 25% of supply/return delta T b) mechanical or electrical adjustable-speed pump drive(s) c) two-way valves at all heating coils d) multiple-stage pumps e) other system controls that reduce pump flow by at least 50% based on load - calculations required Exception(s): q Where the supply temperature reset controls cannot be implemented without causing improper operation of heating, cooling, humidification, or dehumidification systems. q Hydronic systems that use variable flow to reduce pumping energy. q 14.Balancing devices provided in accordance with IMC 603.17 q 15.Demand control ventilation (DCV) present for high design occupancy areas (>40 person/1000 ft2 in spaces >500 ft2) and served by systems with any one of 1) an air-side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor airflow greater than 3000 cfm. Exception(s): q Systems with heat recovery. q Multiple-zone systems without DDC of individual zones communicating with a central control panel. q Systems with a design outdoor airflow less than 1200 cfm. q Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. q 16.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings Exception(s): q Gravity dampers acceptable in buildings <3 stories q 17.Automatic controls for freeze protection systems present q 18.Three-pipe systems not used q 19.Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exemptedCity of Aspen Received 7/10/17 Building Department Project Title: Hotel Lenado Report date: 06/23/17 Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n Mechanical_R2.cck Page 10 of 10 Exception(s): q Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. q Systems serving spaces that are heated and not cooled to less than 60°F. q Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. q Heating systems in climates with less than 3600 HDD. q Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64°F. q Systems requiring dehumidification that employ energy recovery in series with the cooling coil. q Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements: a) at least 75 percent of exhaust flow rate, b) heated to no more than 2°F below room setpoint temperature, c) cooled to no lower than 3°F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling. Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2009 IECC requirements in COMcheck Version 4.0.5.2 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature Date Section 6: Post Construction Compliance Statement q HVAC record drawings of the actual installation, system capacities, calibration information, and performance data for each equipment provided to the owner. q HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. q Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date 06/23/2017Martin Zourek, M.E. City of Aspen Received 7/10/17 Building Department 12/20 / 2 0 1 7 nickt