HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (30).ACBKCity of Aspen General/Building Permit Application
130 South Galena Street, Aspen Permit No.:
Aspen, CO 81611
Phone (970) 920-5090 Fax (970) 920-5440 Master Permit No.:
Unit #:
Legal
Description
Block:
PROJECT INFORMATION
MECHANICAL
NO.NO.
FOR CITY USE ONLY
Census Code Occupancy Group Zone District # of Stories # of Dwellings Type of Construction:
APPROVALS Name Date
Zoning Plan Check Permit Fee Parks Impact
HPC Energy Code REMP School Ded.
Building Zoning 50%Hourly Plan
Check TDM Impact
Fire District Eng. Review Zoning Hourly
Review Ped. Amenity
Engineering Cons. Mit. 50%Engineering
Hourly
Housing Cash-
in-lieu
CMP Parks Review Zoning 50%Stormwater fee
in lieu
Utilities Other Cons. Mit. 50%City Use Tax
Water Electrical County Use Tax
Sanitation Plumbing GIS
Env. Health Mechanical Aspen San.
Dist.
Parks Utility Other
Approved to issue by:
Issued by:
PERMIT TYPE: BD CO DE FD FN MH MS RF SN
Gross Area This Permit (not FAR):
Repair, Alteration, or Addition
Water Closet (toilet), Bidet
Bathtub
Lavatory (wash basin)
Total Fixture Count
RECEIPTS:
Fees due at Submittal:
Shower
Kitchen Sink & Disposal
Dishwasher
Laundry Bar, Utility Sinks
Clothes Washer
Floor Sink
Floor Drain
Hose Bib
Square Footage
Valuation
PROJECT LOCATION
Lot:
Job Address:
Parcel ID (call 920-5160)
Valuation of Work: $
Tract or Subdivision:
Const. Mit. Sq. Ft.:Disturbed Area:Utility Affected Area:
Description of Work:
Use of Building:
Class of Work:
Parks Affected Area:Existing Gross Area of Unit (not FAR):
Fees due at Issuance:
FEES
Building Gross Sq. FootageAlarm System Req.Fire Sprinkler Req.
Lot Area
PLANS LOCATION:
Occupancy Load Deed Restricted
Unit Sq. Footage
Accepted by:
Other
PLUMBING
TYPE OF FIXTURE/ITEM
PLUMBING continued
Water Heater M/BTU ea.
Gas Systems: # of Outlets
Water Piping & Treating Equipment
Other
ELECTRICAL
Forced Air/Gravity Sys. BTU____ AFUE_____
Air Handling Unit - CFM
Wall, Suspended, or Unit Heaters
Evaporative Coolers
Snowmelt System Sq. Ft.
Ventilation Fans
Appliance Vents
Range Hood
Boilers, (includes vent) BTU_____ AFUE____
Gas Systems: # of Outlets
TYPE OF EQUIPMENT
Repair, Alteration, or Addition
Gas Log
Gas Appliance
nonoyesyes
Single Family Multi-Family Commercial/Residential Commercial
OtherNewAdditionAlterationRepair
Other
Move Tenant Finish Demo Change Order
410 kBTU
indirect WH
2x 500 btu 97.7%1x 400 btu 98%1x 600 btu 97.5%
0007.2017.ACBK
75A-C 273707337001City and Townsite of Aspen
Demolish existing Hotel Lenado and build a new hotel
8,446,400 21116 6165
0
12,906.75
200
190
4 09
19
11
110
0
10
0
2
84
24
8
116
1642
120
4,367.75
7/10/17
4/18/17
12/28/17
48
213 R1, R2, A2, S2 2198
22,536
CS 27,437.92
0
6/26/17 65,729.95 101,123.00
150,907.4315,168.45 45,459.56
12/20/17 17,948.60
12/20/17 16,683.21
3,071.04
MH
TK
MH
NT
NT
7/05/17 8,177.90
270.004/14/17 17,948.60
12/28/17
3/2/17
12/28/17
8,177.90 87,177.90
500.00
21,116.00
PM
SW
35,393.05
82,637.20LO
DR
DAM
200 S Aspen, Aspen, CO 81611
4
4
8,970
21,116
BD
VB
4 4
4
4
4
4
4
4
4
4
4
4
1
Received
2/8/17
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
FIRE
SPRINKLERS
REQUIRED
SPECIAL INSPECTION REQUIRED
Special inspection is required per 2009 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
See list on S-001
City of Aspen
Received
7/10/17
Building Department
NT Nick Thompson 11/2/17
0007.2017.ACBK
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work without special inspection.
2
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items.
2.
4.
1
0007.2017.ACBK200 S Aspen
12/19
/
2
0
1
7
nickt
Note: Accessible pool lift must
be on site prior to final
inspection.
IBC Building Description Form New Gdrive/master files/building/apps, forms checklists 8/28/14
MASTER PERMIT#_______________________________
CHANGE ORDER #_______________________________
CHANGE ORDER #_______________________________
CHANGE ORDER #_______________________________
Building Description Form - IBC
Property Location:
Address: Unit #:
Legal Description: (lot, Block)
Owner:
Owner Address:
Parcel ID #:
Building Code Information
Code Editions: 2009 IBC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC
Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____ Fire Alarm Installed: ______NO _____YES
Type of Construction: _____VA _____VB _____IVA _____IIIA _____IIIB _____IIA _____IIB _____IA _____IB
Occupancy Group(s) _____A-1 2 3 4 5 _____B _____E _____F-1 2 _____H-1 2 3 4 5 _____I-1 2 3 4 _____M _____R-1 2 3 4 _____S-1 2 _____U _____Separated Occupancies _____Non-Separated Occupancies
Occupant Load(s)
Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding
____Permanent Micropiles _____Other (specify): ______________________
Energy Code Compliance Path: COMMERCIAL: ____Prescriptive Table ____COMCheck U-factor Alternative
____COMCheck UA Alternative ____Total Building Performance RESIDENTIAL:
____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff
External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____
Building Description
# Stories Above Grade Plane_______ # Stories Below Grade Plane ________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
Reviewed by
Plans Examiner Date
200 S Aspen, Aspen, CO 81611
CITY AND TOWNSITE OF ASPEN Block: 75 Lot: A AND: Lot: Thru C
DCBD2 LLC
2100 Ross Ave, Suite 3300, Dallas, TX 75201
273707337001
X
13 and 13R
X
X
X
X
X
X
X
0 4,367.75 X X
2 2
Diagram on Sheet A-010
X
S-2: 27 ; R-1: 139; R-2: 90
Received
2/8/17
0007.2016.ACBK
2017
x
x
Roof: private rooftop deck serving the free market units with pool and spa
2nd floor: 2 free market units
1st floor: 2 hotel lodge units, 2 affordable housing units, common game lounge/bar, private garage, storage
Basement: main entry lobby, 7 hotel lodge units, common library
Sub-basement: parking garage, employee lounge, laundry, storage, mechanical
NT 12/20/17
ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: _____________________________________________
o Your Name (Person Completing Part A): ____________________________________________
o Your Company: ________________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
200 S Aspen, Aspen, CO 81611
Ryan Walterscheid
Forum Phi
Site Benchmark = 7901.14' (located at South West corner of site)
100' t.o. slab main level = 7896'
Received
2/8/17
x
External Energy Use Approved
RREMP CREMP
PERMIT #DATE
SNOWMELT _____________________________
POOL _____________________________
SPA _____________________________
OFFSET:________________________________
REMP SHEET: ___________________________
REVIEWED BY: _________________________
4
nickt
12/20/20170007.2017.ACBK
4520 sqft (40 of which is exempt)
161.75 sqft
58.25 sqft
A-002
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
20.26kW PV, 360kBtu GSHP
4
READ THIS OR FAIL YOUR INSPECTION!
Furred & Dropped Ceilings, Soffits, and Walls
2009 IBC 803.13
This applies to the attachment of finishes or furring to any
assemblies that are required to be either fire-rated or
non-combustible and is separate from the fire-rated
assembly requirement.
Walls, Ceilings & Soffits: If furred 1 ¾ inches or
less, do one of the following:
4.Fill spaces with Class A material.
5.Fill spaces with inorganic or non-combustible material.
6.Fire block 8 feet in all directions.
Walls: If set out (furred) greater than 1 ¾ inches,
do one of the following:
4.Use a Class A finish material (such as drywall).
5.Use non-combustible framing.
6.Protect both sides with fire sprinklers.
Ceilings & Soffits: If dropped (furred) greater
than 1 ¾ inches:
Framing members, hangers, and other assembly
members must be non-combustible. You may not
use wood.
In Type III and V construction only, you may use fire
retardant treated wood or non-combustible framing.
Dwelling Separation Required - 2009 IBC
-709 Fire Partitions, 712 Horizontal Assemblies:
Walls and floor/ceilings separating dwelling units shall
have a fire-resistance rating of at least 1 hour. Walls shall
extend from the top of the floor assembly below to the
underside of the floor or roof slab or deck above or to the
fire-resistance-rated floor/ceiling assembly above.
-713: Penetrations must be protected by a
through-penetration firestop system. Recessed fixtures
shall not reduce the required fire resistance by use of a
listed fixture, a listed firehood, or a drywall assembly
meeting the required fire resistance.
-1207 Sound Transmission: Separating walls and
floor/ceilings shall have an STC rating of at least 50.
Floor/ceilings shall have an IIC rating of at least 50.
12/20
/
2
0
1
7
nickt
198
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
General/Building Permit Application Page 2 Permit No.:
Master Permit No.:
For Plan Review Questions
For Inspection Questions
Alternate Phone No.
Alternate Phone No.
Alternate Phone No.
Alternate Phone No.
ELECTRICAL CONTRACTOR
Alternate Phone No.
MECHANICAL CONTRACTOR
Alternate Phone No.
PLUMBING CONTRACTOR
Alternate Phone No.
DateContractor Signature:Print Name
City License No.
Phone No.
USE TAX:The General Contractor or Owner Builder is required to pay a Use Tax Deposit to both the City of Aspen (2.1%, first $100,000 is exempt) and
Pitkin County (0.5%, no exemption) on the building permit at the time of issuance.
I hereby certify that I have read and examined this application and know the same tobe true and correct.All provisions of laws and ordinances governing
this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state or local law regulating construction or the performance of construction.It is my responsibility to review the approved
plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes.
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended
or abandoned for a period of 180 days at any time after work has commenced unless approval is received from the Chief Building Official.
City License No.
Name Phone No.
Check if you are a tested owner builder (single family only). You must take a test and complete the owner/building affidavit
OWNER'S AUTHORIZED AGENT
Name:Phone No.Alternate Phone No.
City:
City:
CONTACT INFORMATION
Name Phone No.
Email
Contact Name:
Contact Name:Phone No.
Phone No.
STRUCTURAL ENGINEER OF RECORD
PLEASE PROVIDE ANY ADDITIONAL INFORMATION THAT MAY HELP US CONTACT YOU FOR ANY QUESTIONS REGARDING YOUR BUILDING PERMIT APPLICATION
Name
Mailing address City Zip
Phone No.
LANDSCAPE ARCHITECT OF RECORD
City
Name
E-mail Address:
Alternate Phone No.
OWNER
GENERAL CONTRACTOR
Zip:
Name:Phone No.
E-mail Address:
Name:
Mailing address:
Phone No.
E-mail Address
ARCHITECT OR DESIGNER OF RECORD
Mailing address:
Mailing address:
City:
Mailing address Zip
Phone No.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
INSPECTIONS: The General Contractor must schedule inspections online at www.aspenpitkin.com/Departments/Community-Development-Forms/
Zip:
Zip:
E-mail Address:
Phone No.
Zip
Name
Email City License No.
E-mail Address
E-mail Address
Mailing address City
Name
Email
0007.2017.ACBK
970-797-4880
970-319-2232
for email correspondence- ldunn@forumphi.com
td@dundon.co
rwalterscheid@forumphi.com
chris@madiganco.co
rwalterscheid@forumphi.com
sellsperman@dhmdesign.com
Jeff Myers; c/o KL&A
jmyers@klaa.com
Lori Dunn
Chris Madigan
Stephen Ellsperman; c/o DHM Design
Ryan Walterscheid; c/o Forum Phi
Chris Madigan
Ryan Walterscheid; c/o Forum Phi
DCBD2 LLC
274-9598
274-9598
319-2232
303-575-9510
970-963-6520
970-279-4157
970-279-4157
75201Dallas2100 Ross Ave, Suite 3300
725 W Main St, Suite 204 Aspen 81611
PO Box 9682 Aspen 81612
725 W Main St, Suite 204 Aspen 81611
311 Main Street, Suite 102 Carbondale 81623
1875 Lawrence Street, #700 Denver 80202
Received
2/8/17
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
COMcheck Software Version 4.0.7.1
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
200 S Aspen St
Aspen, CO 81611
Owner/Agent:Designer/Contractor:
Aaron Humphrey
Alpenglow Lighting Design, Inc
4341 CR 113
Carbondale, CO 81623
970-948-2637
aaron@alpenglowinc.com
Project Information
Energy Code:
Hotel Lenado
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Hotel 18425 0.78 14427
14427Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-Hotel
LED 1: L1: RECESSED DOWNLIGHT: LED Other Fixture Unit 16W:1 160 18 2880
LED 1 copy 1: L1: RECESSED DOWNLIGHT: LED Other Fixture Unit 16W:1 45 18 Exempt
Exemption:Sleeping Unit Lighting
LED 3: L3: RECESSED SHOWER LIGHT: LED Other Fixture Unit 13W:1 9 12 108
LED 5: L5: LINEAR LED COVE/UNDERCAB SYSTEM: LED Other Fixture Unit 103W:1 3 100 300
LED 6: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 22 100 2200
LED 6 copy 2: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 28 60 Exempt
Exemption:Sleeping Unit Lighting
LED 6 copy 1: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 19 60 Exempt
Exemption:Furniture-mounted Supplemental Task Lighting
LED 7: L6: 6" SURFACE SHALLOW: LED Other Fixture Unit 13W:1 14 14 Exempt
Exemption:Sleeping Unit Lighting
LED 8: L7: LED LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 10 60 Exempt
Exemption:Sleeping Unit Lighting
LED 10: L9: 9" SURFACE SHALLOW: LED Other Fixture Unit 16W:1 55 17 935
LED 11: L10: ELEVATOR PIT LIGHT: LED Other Fixture Unit 40W:1 3 32 96
LED 12: L11: LINEAR INDUSTRIAL: LED Other Fixture Unit 40W:1 21 43 903
LED 13: L12: ADA SCONCE: LED Other Fixture Unit 46W:1 6 25 150
LED 14: L13: STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 28W:1 1 30 30
LED 15: L14: LINER SLOT (PER FOOT): LED Linear 8W:1 80 7 560
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
91 ofPage
11/27/17
12/19
/
2
0
1
7
nickt
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LED 17: L15A: DECORATIVE PENDANT: LED Other Fixture Unit 125W:1 1 160 160
LED 19 copy 1: L16: downlight: LED Other Fixture Unit 16W:1 43 10 430
LED 19: L17: DECORATIVE PENDANT: LED Other Fixture Unit 16W:1 5 50 250
LED 20: L18: FLOOR LAMP: LED Other Fixture Unit 16W:1 10 18 180
LED 21: L19: MINI BOLLARD: LED Other Fixture Unit 6.5W:1 5 9 45
LED 22: L20: READING LIGHT: LED Other Fixture Unit 13W:1 24 9 Exempt
Exemption:Sleeping Unit Lighting
LED 23: L21: DOWNLIGHT: LED Other Fixture Unit 28W:1 4 2 6
LED 24: L22: DECORATIVE: LED Other Fixture Unit 16W:1 6 10 60
LED 26: L24: LED TAPE: LED Other Fixture Unit 13W:1 8 50 Exempt
Exemption:Sleeping Unit Lighting
LED 27: L25: PENDANT: LED Other Fixture Unit 13W:1 2 30 60
LED 30: D: DECORATIVE: LED A Lamp 13W:1 28 14 392
LED 30: X1: EXIT: LED Other Fixture Unit 6.5W:1 18 6 Exempt
Exemption:Exit Signs, Safety or Emergency Lighting
9745Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES: Design 32% better than code
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
92 ofPage
Aaron J. Humphrey, President 11/09/17
11/27/17
12/19
/
2
0
1
7
nickt
COMcheck Software Version 4.0.7.1
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
200 S Aspen St
Aspen, CO 81611
Owner/Agent:Designer/Contractor:
Aaron Humphrey
Alpenglow Lighting Design, Inc
4341 CR 113
Carbondale, CO 81623
970-948-2637
aaron@alpenglowinc.com
Project Information
Energy Code:
Hotel Lenado
2 (Neighborhood business district)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
SIDEWALK (Walkway < 10 feet wide)2590 ft of 0.7 Yes 1813
ROOF DECK (Special feature area)1445 ft2 0.14 Yes 202
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
2015
2015
600
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
SIDEWALK ( Walkway < 10 feet wide 2590 ft of walkway length): Tradable Wattage
LED 1: L13: LED STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 46W:1 1 30 30
LED 5: L21: FRAME LIGHT (POWER SUPPLY): LED Other Fixture Unit 103W:1 7 100 700
LED 6: L2: RECESSED DOWNLIGTH: LED Other Fixture Unit 6.5W:1 1 12 12
LED 7: L23: SCONCE: LED Other Fixture Unit 95W:1 3 100 300
ROOF DECK ( Special feature area 1445 ft2): Tradable Wattage
LED 1 copy 1: L13: LED STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 46W:1 1 30 30
LED 3: L18: FLOOR LAMP: LED Other Fixture Unit 16W:1 6 18 108
LED 4: L19: MINI BOLLARD: LED Other Fixture Unit 6.5W:1 2 9 18
1198Total Tradable Proposed Watts =
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
93 ofPage
11/27/17
12/19
/
2
0
1
7
nickt
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 54% better than code
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
94 ofPage
Aaron J. Humphrey, President 11/09/17
11/27/17
12/19
/
2
0
1
7
nickt
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.0.7.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C103.2
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
95 ofPage
X
X
X 11/27/17
12/19
/
2
0
1
7
nickt
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.1
[EL15]1
Lighting controls installed to uniformly
reduce the lighting load by at least
50%.
Complies
Does Not
Not Observable
Not Applicable
Exception: Lighting that is related to means of egress in
stairways, ramps, corridors, or emergency routes.
C405.2.1
[EL18]1
Occupancy sensors installed in
required spaces.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C405.2.1,
C405.2.2.
3
[EL23]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C405.2.2.
1
[EL22]2
Automatic controls to shut off all
building lighting installed in all
buildings.
Complies
Does Not
Not Observable
Not Applicable
Exception: Lighting controlled by occupancy sensors.
C405.2.3
[EL16]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.3,
C405.2.3.
1,
C405.2.3.
3
[EL21]1
Enclosed spaces with daylight area
under skylights and rooftop monitors
are equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C405.2.4
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C405.2.5
[EL25]null
Automatic lighting controls for exterior
lighting installed. Controls will be
daylight controlled, set based on
business operation time-of-day, or
reduce connected lighting > 30%.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C405.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
96 ofPage
X
X
X
X
X
X
X
X
X
X
X
11/27/17
12/19
/
2
0
1
7
nickt
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C405.4.1
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C405.5.1
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
C408.2.5.
1
[FI16]3
Furnished as-built drawings for
electric power systems within 90 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Hotel Lenado
C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado
Lighting 110717.cck
11/09/17Report date:
98 ofPage
X
X
X
X
X
11/09/17 Comments/Revisions:
1. Removed egress lighting exemption from interior common space fixtures.
2. Revised interior fixture counts to remove fixtures from AHU residential units.
3. Revised interior exemptions for sleeping unit lighting.
4. Moved certain exterior fixtures previously exempted as egress lighting on interior
count to exterior count.
11/27/17
12/19
/
2
0
1
7
nickt
12/20
/
2
0
1
7
nickt
REScheck Software Version 4.6.2
Compliance Certificate
Project Hotel Lenado
Energy Code:2015 IECC
Location:Aspen, Colorado
Construction Type:Single-family
Project Type:New Construction
Conditioned Floor Area:3,899 ft2
Glazing Area 27%
Climate Zone:7 (9922 HDD)
Permit Date:
Construction Site:
City & Townsite of Aspen
block 75. Lot A thru C
Aspen, CO 81611
Owner/Agent:
Lori Gerety
Forum Phi
715 W. Main St.
Ste 204
Aspen, CO 81611
970-279-4157
lgerety@forumphi.com
Designer/Contractor:
Martin Zourek
AEC
PO Box 8489
40801 US 6 & 24, Ste 214
Avon, CO 81620
970-748-8520
martin@aec-vail.com
Permit Number:
Compliance: Passes using UA trade-off
0.3% Better Than Code Maximum UA:584 Your UA:582
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Wall 1 - west: Steel Frame, 24" o.c.944 21.0 10.0 0.048 35
Window 1: Metal Frame with Thermal Break:Double Pane 27 0.310 8
Door 1: Glass 198 0.320 63
Wall 2 - north: Steel Frame, 24" o.c.982 21.0 10.0 0.048 43
Window 2: Metal Frame with Thermal Break:Double Pane 96 0.310 30
Wall 3 - south: Steel Frame, 24" o.c.862 21.0 10.0 0.048 23
Window 3: Metal Frame with Thermal Break:Double Pane 277 0.290 80
Door 2: Glass 99 0.310 31
Wall 4 - east: Steel Frame, 24" o.c.977 21.0 10.0 0.048 30
Window 4: Metal Frame with Thermal Break:Double Pane 187 0.310 58
Door 3: Glass 169 0.320 54
Wall 5: Steel Frame, 24" o.c.33 0.0 0.0 0.270 9
Wall 6: Steel Frame, 24" o.c.20 0.0 0.0 0.270 5
Wall 7: Steel Frame, 24" o.c.25 0.0 0.0 0.270 7
Wall 8: Steel Frame, 24" o.c.30 0.0 0.0 0.270 8
Project Title: Hotel Lenado
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado
Residential portion envelope.rck
Page 1 of10
06/23/17Report date:City of Aspen
Received
7/10/17
Building Department
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1 - top deck: Flat Ceiling or Scissor Truss 1,941 49.0 0.0 0.026 50
Ceiling 2: Steel Joist/Rafter, 24" o.c.:2x6 2,684 49.0 10.0 0.018 48
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.6.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Title: Hotel Lenado
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado
Residential portion envelope.rck
Page 2 of10
06/23/17Report date:
Martin Zourek, M.E.06/23/2017
City of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 1 of 10
COMcheck Software Version 4.0.5.2
Envelope Compliance Certificate
Section 1: Project Information
Energy Code: 2009 IECC
Project Title: Hotel Lenado
Project Type: New Construction
Construction Site:Owner/Agent:Designer/Contractor:
City & Townsite of Aspen
block 75. Lot A thru C
Aspen, CO 81611
Lori Gerety
Forum Phi
715 W. Main St
Ste 204
Aspen, CO 81611
970-279-4157
ldunn@forumphi.com
Martin Zourek
AEC
P.O.Box 8489
40801 US 6 & 24, Ste 214
Avon, CO 81620
970-748-8520
martin@aec-vail.com
Building Location (for weather data):Aspen, Colorado
Climate Zone:7
Vertical Glazing / Wall Area Pct.:25%
Building Use: Activity Type(s)Floor Area
1-Hotel : Nonresidential 18425
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES: Design 1% better than code.
Envelope Assemblies:
Component Name/Description Gross
Area or
Perimeter
Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget
U-Factor(a)
Orientation: NORTH
Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light
Density, Furring: Metal, Wall Ht 18.0, Depth B.G. 18.0, [Bldg.
Use 1 - Hotel]
1470 21.0 0.0 0.109 0.108
Exterior Wall 1: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1310 21.0 0.0 0.090 0.064
Window 1: Metal Frame with Thermal Break, Perf. Specs.: Product
ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c)
399 ------0.350 0.450
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 -
Hotel] (c)
128 ------0.300 0.800
Exterior Wall 5: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]8 0.0 0.0 0.338 0.064
Orientation: EAST
Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light
Density, Furring: Metal, Wall Ht 23.0, Depth B.G. 13.0, [Bldg.
Use 1 - Hotel]
1266 21.0 0.0 0.109 0.108
Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light
Density, Furring: Metal, Wall Ht 23.0, Depth B.G. 23.0, [Bldg.
Use 1 - Hotel]
837 21.0 0.0 0.109 0.108
Exterior Wall 3: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1141 21.0 0.0 0.090 0.064
Window 3: Metal Frame with Thermal Break, Perf. Specs.: Product
ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c)
181 ------0.350 0.450
Door 5: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1
- Hotel] (c)
72 ------0.300 0.450
Exterior Wall 7: Wood-Framed, 24" o .c., [Bldg. Use 1 - Hotel]3 0.0 0.0 0.298 0.051
Orientation: SOUTH
Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light
Density, Furring: Metal, Wall Ht 23.5, Depth B.G. 23.5, [Bldg.
Use 1 - Hotel]
1488 21.0 0.0 0.109 0.108
City of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 2 of 10
Basement Wall Lower & Main: Solid Concrete:12" Thickness, Light
Density, Furring: Metal, Wall Ht 23.0, Depth B.G. 21.0, [Bldg.
Use 1 - Hotel]
318 21.0 0.0 0.109 0.108
Exterior Wall 4: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1166 21.0 0.0 0.090 0.064
Door 6: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1
- Hotel] (c)
48 ------0.300 0.450
Door 7 Garage door: Other Door, Non-Swinging, [Bldg. Use 1 -
Hotel]
164 ------0.600 0.500
Door 8: Glass (> 50% glazing):Metal Frame, Non-Entrance Door,
Perf. Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1
- Hotel] (c)
21 ------0.300 0.450
Exterior Wall 8: Wood-Framed, 24" o .c., [Bldg. Use 1 - Hotel]5 0.0 0.0 0.298 0.051
Orientation: WEST
Basement Wall Lower LVL: Solid Concrete:12" Thickness, Light
Density, Furring: Metal, Wall Ht 13.0, Depth B.G. 13.0, [Bldg.
Use 1 - Hotel]
1217 21.0 0.0 0.109 0.108
Exterior Wall 2: Steel-Framed, 24" o.c., [Bldg. Use 1 - Hotel]1665 21.0 0.0 0.090 0.064
Window 2: Metal Frame with Thermal Break, Perf. Specs.: Product
ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 - Hotel] (c)
530 ------0.350 0.450
Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID N/A, SHGC 0.45, PF 1.00, [Bldg. Use 1 -
Hotel] (c)
78 ------0.320 0.800
Exterior Wall 6: Wood-Framed, 24" o .c., [Bldg. Use 1 - Hotel]9 0.0 0.0 0.298 0.051
Orientation: UNSPECIFIED ORIENTATION
Roof 2 Lower decks: Metal Building, Screw Down, [Bldg. Use 1 -
Hotel]
1685 49.0 0.0 0.098 0.049
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) 'Other' components require supporting documentation for proposed U-factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
q 1.All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
q 2.Windows, doors, and skylights certified as meeting leakage requirements.
q 3.Component R-values & U-factors labeled as certified.
q 4.No roof insulation is installed on a suspended ceiling with removable ceiling panels.
q 5.'Other' components have supporting documentation for proposed U-Factors.
q 6.Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R-value without compressing the insulation.
q 7.Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
q 8.Cargo doors and loading dock doors are weather sealed.
q 9.Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk.
q 10.Building entrance doors have a vestibule equipped with self-closing devices.
Exceptions:
q Building entrances with revolving doors.
q Doors not intended to be used as a building entrance.
q Doors that open directly from a space less than 3000 sq. ft. in area.
q Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
q Doors opening directly from a sleeping/dwelling unit.
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC
requirements in COMcheck Version 4.0.5.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title Signature DateMartin Zourek, M.E.06/23/2017City of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 3 of 10
COMcheck Software Version 4.0.5.2
Mechanical Compliance Certificate
Section 1: Project Information
Energy Code: 2009 IECC
Project Title: Hotel Lenado
Project Type: New Construction
Construction Site:Owner/Agent:Designer/Contractor:
City & Townsite of Aspen
block 75. Lot A thru C
Aspen, CO 81611
Lori Gerety
Forum Phi
715 W. Main St
Ste 204
Aspen, CO 81611
970-279-4157
ldunn@forumphi.com
Martin Zourek
AEC
P.O.Box 8489
40801 US 6 & 24, Ste 214
Avon, CO 81620
970-748-8520
martin@aec-vail.com
Section 2: General Information
Building Location (for weather data):Aspen, Colorado
Climate Zone:7
Section 3: Mechanical Systems List
Quantity System Type & Description
3 HVAC GEO thermal (Single Zone) : Ground Source Heat Pump
Heating Mode: Capacity = 100 kBtu/h,
Proposed Efficiency = 3.10 COP, Required Efficiency = 3.10 COP
Cooling Mode: Capacity = 101 kBtu/h,
Proposed Efficiency = 13.40 EER, Required Efficiency: 13.40 EER
Fan System: None
3 Hydronic unit heaters (Unknown) :
Heating: 3 each - Unit Heater, Hot Water, Capacity = 31300 kBtu/h
No minimum efficiency requirement applies
Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp
1 Hydronic unit heaters (Unknown) :
Heating: 1 each - Unit Heater, Hot Water, Capacity = 18400 kBtu/h
No minimum efficiency requirement applies
Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp
1 Hydronic unit heaters (Unknown) :
Heating: 1 each - Unit Heater, Hot Water, Capacity = 24800 kBtu/h
No minimum efficiency requirement applies
Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp
1 HVAC System 5 (Unknown) :
Heating: 1 each - Unit Heater, Hot Water, Capacity = 21230 kBtu/h
No minimum efficiency requirement applies
Fan System: Unit Heaters | Lower & Main LVL -- Compliance (Motor nameplate HP method) : Passes
Fans:City of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 4 of 10
FAN 1 Supply, Constant Volume, 630 CFM, 0.1 motor nameplate hp
1 Baseboards (Single Zone w/ Perimeter System) :
Heating: 1 each - Radiant Heater, Hot Water, Capacity = 9898 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 Electric Duct Heaters (Unknown) :
Heating: 1 each - Unit Heater, Electric, Capacity = 20130 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 Electric Duct Heaters (Unknown) :
Heating: 1 each - Unit Heater, Electric, Capacity = 3412 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 Electric Duct Heaters (Unknown) :
Heating: 1 each - Unit Heater, Electric, Capacity = 4777 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 Electric Duct Heaters (Unknown) :
Heating: 1 each - Unit Heater, Electric, Capacity = 6483 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 Electric Unit Heater (Unknown) :
Heating: 1 each - Unit Heater, Electric, Capacity = 6396 kBtu/h
No minimum efficiency requirement applies
Fan System: Electric Unit Heaters | All levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 275 CFM, 2.5 motor nameplate hp
1 Electric Unit Heater (Unknown) :
Heating: 2 each - Unit Heater, Electric, Capacity = 2560 kBtu/h
No minimum efficiency requirement applies
Fan System: Electric Unit Heaters | All levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 275 CFM, 2.5 motor nameplate hp
8 Fan coils CDVB-04 (Single Zone) :
Heating: 8 each - Hydronic or Steam Coil, Hot Water, Capacity = 2500 kBtu/h
No minimum efficiency requirement applies
Cooling: 8 each - Hydronic Coil, Capacity = 3200 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coils | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 3 Supply, Constant Volume, 370 CFM, 0.2 motor nameplate hp
1 Fan coils H-08 (Single Zone) :
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 16000 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 19000 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coils | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 3 Supply, Constant Volume, 370 CFM, 0.2 motor nameplate hp
2 Fan coils CDVB-08 (Single Zone) :
Heating: 2 each - Hydronic or Steam Coil, Hot Water, Capacity = 10400 kBtu/h
No minimum efficiency requirement applies
Cooling: 2 each - Hydronic Coil, Capacity = 11500 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coil 3 | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 5 Supply, Constant Volume, 565 CFM, 0.3 motor nameplate hp
1 Fan coils CDVB-16 (Single Zone) :
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 21000 kBtu/h
No minimum efficiency requirement appliesCity of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 5 of 10
Cooling: 1 each - Hydronic Coil, Capacity = 20900 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coil 4 | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 6 Supply, Constant Volume, 1135 CFM, 0.3 motor nameplate hp
2 Fan coils H-20 (Single Zone) :
Heating: 2 each - Hydronic or Steam Coil, Hot Water, Capacity = 99200 kBtu/h
No minimum efficiency requirement applies
Cooling: 2 each - Hydronic Coil, Capacity = 45200 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coil 2 | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 4 Supply, Constant Volume, 990 CFM, 0.5 motor nameplate hp
1 Fan coils H16 (Single Zone) :
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 26400 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 30300 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coil 4 | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 6 Supply, Constant Volume, 1135 CFM, 0.3 motor nameplate hp
1 Fan coils VB-25 (Single Zone) :
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 36900 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 40700 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Fan Coil 5 | All Levels -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 7 Supply, Constant Volume, 2290 CFM, 0.8 motor nameplate hp
3 Boilers B-1, B-2, B-3:
Heating: Hot Water Boiler, Capacity 500 kBtu/h, Gas
Proposed Efficiency: 97.00 % Et, Required Efficiency: 75.00 % Et
1 Boilers B-4:
Heating: Hot Water Boiler, Capacity 400 kBtu/h, Gas
Proposed Efficiency: 97.00 % Et, Required Efficiency: 75.00 % Et
1 Water Heater 1:
Gas Storage Water Heater, Capacity: 504 gallons, Input Rating: 75 Btu/h w/ Circulation Pump
No minimum efficiency requirement applies
Section 4: Requirements Checklist
Requirements Specific To: HVAC GEO thermal :
q 1.Equipment minimum efficiency: Heat Pump: 3.10 COP 13.40 EER
Requirements Specific To: Hydronic unit heaters :
q 1.Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: Hydronic unit heaters :
q 1.Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: Hydronic unit heaters :
q 1.Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: HVAC System 5 :
q 1.Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: Baseboards :
q 1.Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: Electric Duct Heaters :
NoneCity of Aspen
Received
7/10/17
Building Department Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 6 of 10
Requirements Specific To: Electric Duct Heaters :
None
Requirements Specific To: Electric Duct Heaters :
None
Requirements Specific To: Electric Duct Heaters :
None
Requirements Specific To: Electric Unit Heater :
None
Requirements Specific To: Electric Unit Heater :
None
Requirements Specific To: Fan coils CDVB-04 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:
a) 15 degrees F deadband where boiler and chiller can not operate,
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Fan coils H-08 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:
a) 15 degrees F deadband where boiler and chiller can not operate,
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Fan coils CDVB-08 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:
a) 15 degrees F deadband where boiler and chiller can not operate,City of Aspen
Received
7/10/17
Building Department
12/20
/
2
0
1
7
nickt
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 7 of 10
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Fan coils CDVB-16 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:
a) 15 degrees F deadband where boiler and chiller can not operate,
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Fan coils H-20 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:
a) 15 degrees F deadband where boiler and chiller can not operate,
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Fan coils H16 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:City of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 8 of 10
a) 15 degrees F deadband where boiler and chiller can not operate,
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Fan coils VB-25 :
q 1.Discharge dampers prohibited with fan motors > 25 hp
q 2.Balancing and pressure test connections on all hydronic terminal devices
q 3.Multiple boilers must have automatic controls that sequence operation with load
q 4.Single boiler >500 kBtu/h input capacity must have a multistaged or modulating burner
q 5.Two-pipe changeover heating/cooling controls must have:
a) 15 degrees F deadband where boiler and chiller can not operate,
b) allow operation in either heating or cooling for at least 4 hrs. and
c) prevent difference between heating and cooling set points greater than 30 degrees F
Exception(s):
q Air/evap condenser and extensive outside-air filtration
q 6.Meets the condenser heat recovery requirement for service water heating
Exception(s):
q Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak
water-cooled condenser load at design conditions.
q Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources.
q 7.Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are
not operating
q 8.Hot water pumping systems with multiple boilers automatically reduce hot water flow rates proportionately when boilers are not
operating
Requirements Specific To: Boilers B-1, B-2, B-3 :
q 1.Equipment minimum efficiency: Boiler Thermal Efficiency 75% Et 80% Ec
q 2.Newly purchased heating equipment meets the efficiency requirements
- used equipment must meet 80% Et @ maximum capacity
q 3.Systems with multiple boilers have automatic controls capable of sequencing boiler operation
q 4.Hydronic heating systems comprised of a single boiler and >500 kBtu/h input design capacity include either a multistaged or modulating
burner
Requirements Specific To: Boilers B-4 :
q 1.Equipment minimum efficiency: Boiler Thermal Efficiency 75% Et 80% Ec
q 2.Newly purchased heating equipment meets the efficiency requirements
- used equipment must meet 80% Et @ maximum capacity
q 3.Systems with multiple boilers have automatic controls capable of sequencing boiler operation
q 4.Hydronic heating systems comprised of a single boiler and >500 kBtu/h input design capacity include either a multistaged or modulating
burner
Requirements Specific To: Water Heater 1 :
q 1.Water heating equipment meets minimum efficiency requirements: Gas Storage Water Heater efficiency: No efficiency requirement
applies.
q 2.All piping in circulating system insulated
q 3.Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units.
q 4.Automatic time control of heat tapes and recirculating systems present
q 5.Controls will shut off operation of circulating pump between water heater/boiler and storage tanks within 5 minutes after end of heating
cycle
Generic Requirements: Must be met by all systems to which the requirement is applicable:
q 1.Plant equipment and system capacity no greater than needed to meet loadsCity of Aspen
Received
7/10/17
Building Department Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 9 of 10
Exception(s):
q Standby equipment automatically off when primary system is operating
q Multiple units controlled to sequence operation as a function of load
q 2.Minimum one temperature control device per system
q 3.Minimum one humidity control device per installed humidification/dehumidification system
q 4.Load calculations per ASHRAE/ACCA Standard 183.
q 5.Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup
Exception(s):
q Continuously operating zones
q 6.Outside-air source for ventilation; system capable of reducing OSA to required minimum
q 7.R-5 supply and return air duct insulation in unconditioned spaces
R-8 supply and return air duct insulation outside the building
R-8 insulation between ducts and the building exterior when ducts are part of a building assembly
Exception(s):
q Ducts located within equipment
q Ducts with interior and exterior temperature difference not exceeding 15°F.
q 8.Mechanical fasteners and sealants used to connect ducts and air distribution equipment
q 9.Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics
q 10.Hot water pipe insulation: 1.5 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in.
Chilled water/refrigerant/brine pipe insulation: 1.5 in. for pipes <=1.5 in. and 1.5 in. for pipes >1.5 in.
Steam pipe insulation: 1.5 in. for pipes <=1.5 in. and 3 in. for pipes >1.5 in.
Exception(s):
q Piping within HVAC equipment.
q Fluid temperatures between 55 and 105°F.
q Fluid not heated or cooled with renewable energy.
q Piping within room fan-coil (with AHRI440 rating) and unit ventilators (with AHRI840 rating).
q Runouts <4 ft in length.
q 11.Operation and maintenance manual provided to building owner
q 12.Thermostatic controls have 5°F deadband
Exception(s):
q Thermostats requiring manual changeover between heating and cooling
q Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority
having jurisdiction.
q 13.Hot water distribution systems >= 300 kBtu/h must have one of the following:
a) controls that reset supply water temperature by 25% of supply/return delta T
b) mechanical or electrical adjustable-speed pump drive(s)
c) two-way valves at all heating coils
d) multiple-stage pumps
e) other system controls that reduce pump flow by at least 50% based on load
- calculations required
Exception(s):
q Where the supply temperature reset controls cannot be implemented without causing improper operation of heating, cooling,
humidification, or dehumidification systems.
q Hydronic systems that use variable flow to reduce pumping energy.
q 14.Balancing devices provided in accordance with IMC 603.17
q 15.Demand control ventilation (DCV) present for high design occupancy areas (>40 person/1000 ft2 in spaces >500 ft2) and served by
systems with any one of 1) an air-side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor
airflow greater than 3000 cfm.
Exception(s):
q Systems with heat recovery.
q Multiple-zone systems without DDC of individual zones communicating with a central control panel.
q Systems with a design outdoor airflow less than 1200 cfm.
q Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm.
q 16.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
Exception(s):
q Gravity dampers acceptable in buildings <3 stories
q 17.Automatic controls for freeze protection systems present
q 18.Three-pipe systems not used
q 19.Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exemptedCity of Aspen
Received
7/10/17
Building Department
Project Title: Hotel Lenado Report date: 06/23/17
Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Envelope n
Mechanical_R2.cck Page 10 of 10
Exception(s):
q Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code
prohibits the use of energy recovery systems.
q Systems serving spaces that are heated and not cooled to less than 60°F.
q Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy.
q Heating systems in climates with less than 3600 HDD.
q Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64°F.
q Systems requiring dehumidification that employ energy recovery in series with the cooling coil.
q Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air
volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements:
a) at least 75 percent of exhaust flow rate, b) heated to no more than 2°F below room setpoint temperature, c) cooled to no lower
than 3°F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling.
Section 5: Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2009 IECC
requirements in COMcheck Version 4.0.5.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title Signature Date
Section 6: Post Construction Compliance Statement
q HVAC record drawings of the actual installation, system capacities, calibration information, and performance data for each equipment
provided to the owner.
q HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor.
q Written HVAC balancing and operations report provided to the owner.
The above post construction requirements have been completed.
Principal Mechanical Designer-Name Signature Date
06/23/2017Martin Zourek, M.E.
City of Aspen
Received
7/10/17
Building Department
12/20
/
2
0
1
7
nickt