HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0267.2018 (6).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
City Development Engineer's Comments
1. Encroachments: Any existing or planned encroachments into the public
right-of-way, including temporary construction trailers and dumpsters, must be
applied for licensing at City Engineering (920- 5080). Five davs advance
notice is required to obtain a temporary encroachment license.
2. Right-of-way Permits: Approval of these plans by the City Building Dept. is
for work on private property only. Design approvals for proposed work
(including landscaping) in the public right-of-way (ROW) must be obtained
from City Engineering Dept. (920-5080) and Parks Dept. (920-5120) . A
permit for work in the public right-of-way must be obtained from the City
Engineering Dept. five days in advance of when the permit is needed.
3. Mud, dirt and debris may not be tracked onto the adjacent public ROW,
and the adjacent ROW must be clean at the end of eachworkday. Construct
mud rack if needed. Trucks hauling demolished materialsmust becovered.
4. Utilities in ROW: No utility pedestals, meters, or electric transformers can
be installed in the public right-of-way. Provide utility easements on private
property as needed.
5. Certificate of Occupancy (CO) Inspection: Engineering CO Inspection
includes but is not limited to: (a) witnessing that all property corners
havemonuments, (b) drainage improvements were installed as approved, (c)
easements are documented, (d) no unapproved ROW encroachments exist,
and (e) the ROW has been restored. Call 429-2750 to arrange CO inspection.
6. Snowmelt Driveways : (i) Snowmelt runoff from driveway cannot flow into
street . A grate or swale must intercept runoff before street. (ii) Snowmelt
installation in the public ROW requires an encroach- ment permit.
7. Drainage Issues: (i) Foundation drains cannot go to a dry well receiving
other drainage flows. (ii) City must be notified of drainage plan changes. (iii)
Plan approval assumes no ground water. If ground water is encountered, call
the Senior Dev. Engineer at 920-5080. Call for an open hole inspection prior
to placement of the drywell.
8. No Loose Material Storage allowed in R.O.W.
9. Neighbor Notification: For all excavation, the Contractor must comply with
neighbor notification requirements per Section 3307 of the 2003 International
Building Code (IBC)
Reviewed by Engineering
11/20/2018 8:54:49 AM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen. The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements." The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check (Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
10/10/2018 0009.2017.ARBK 0267.2018.ARBK
1419 CRYSTAL LAKE ROAD 273718132017
14-E CALLAHAN SUBDIVISION
BIG DOG LLC 904-472-8707 JJANGRO@GMAIL.COM
RYAN DOREMUS 970-274-1421 RYAN@THUNDERBOWLARCHITECTS.COM
ADJUSTMENTS TO EXTERIOR SITE WALLS, ADJUSTMENTS TO WINDOW LOCATION FOR WINDOW #10 AND #32, ADJUSTMENTS TO INTERIOR WALL LOCATIONS TO ACCOMODATE MECHANICAL CHASES. MODIFICATION TO EXISTING SNOWMELT (NO ADJUSTMENT TO ORIG
no change
no change
no change
no change
no change
no change
R-15
jb 10/31/18x
25 0 x JPo 5/15/19
0 x TF 11/15/18
0
x MH 11/20/18
0
975.00 0
3250.00
10/31/2018
JH 5/16/19
3
10
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check (Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
10/10/2018 0009.2017.ARBK 0267.2018.ARBK
1419 CRYSTAL LAKE ROAD 273718132017
14-E CALLAHAN SUBDIVISION
BIG DOG LLC 904-472-8707 JJANGRO@GMAIL.COM
RYAN DOREMUS 970-274-1421 RYAN@THUNDERBOWLARCHITECTS.COM
ADJUSTMENTS TO EXTERIOR SITE WALLS, ADJUSTMENTS TO WINDOW LOCATION FOR WINDOW #10 AND #32, ADJUSTMENTS TO INTERIOR WALL LOCATIONS TO ACCOMODATE MECHANICAL CHASES. MODIFICATION TO EXISTING SNOWMELT (NO ADJUSTMENT TO ORIG
no change
no change
no change
no change
no change
no change
R-15
jb 10/31/18x
25 0 x JPo 5/15/19
0 x TF 11/15/18
0
x MH 11/20/18
0
975.00 0
3250.00
10/31/2018
JH 5/16/19
3
10
11/
1
5
/
2
0
1
8
ton
y
f
05/15/2019
SEE NOTES #1 PLANS
FIRE
SPRINKLERS
REQUIRED