Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (77).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) x 0 0 0 0153.2017.ARBK 2/7/18 N/A N/A NT 04/26/2018 FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. IRC Building Description Form New Gdrive/master files/building/apps, forms checklists BCM 1/13/14 MASTER PERMIT#_______________________________ CHANGE ORDER #_______________________________ CHANGE ORDER #_______________________________ CHANGE ORDER #_______________________________ Building Description Form - IRC Property Location: Address: Unit #: Legal Description: (lot, Block) Owner: Owner Address: Parcel ID #: Building Code Information Code Editions: 2009 IRC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____ Type of Construction: VB Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding ____Permanent Micropiles _____Other (specify): ______________________ Energy Code Compliance Path: ____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____ Building Description # Stories Above Grade _______ # Stories Below Grade ________ Garage: Attached______# Of Cars___ Detached______# Of Cars____ Carport_______ Bedrooms______ Full Baths_____3/4 Baths_____1/2 Baths_____ Kitchen_____ # Wood Fireplaces: _______ # Gas Appliances: _______ # Gas Logs:____________ Other Rooms: ____________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ACCESSORY DWELLING UNIT: Living______Kitchen_______Bath______Bedroom______Other:_________ Reviewed by Plans Examiner Date 395 Thunderbowl Lane, Aspen Highlands Apen Highlands PUD , Lot 7 , Block A Aspen Extreme, LLC 395 Thunderbowl Lane, Aspen Highlands yes yes yes 0 004,996 2 1 1 3 5 273514310007 0 4 1 City of Aspen Received 07/26/17 Building Department 2015 IRC, IMC, IPC, IFCG, IECC, IFC, 2017 NEC 13D x 6 1 1 Sitting, flex, living, dining, pantry, mudroom, office, study, playroom, exercise room, den, wine, laundry, panel room, mechanical, storage/mechanical. NT 5/1/18 0153.2017.ARBK SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 395 Thunderbowl lane, Aspen 0153.2017.ARBK 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities.The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. Nick Thompson 5/1/18 ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08 Verification of Building Location by Building Contractor For Building and Permit Information, please refer to our website at: http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building / Job Address or Location: _____________________________________________ o Your Name (Person Completing Part A): ____________________________________________ o Your Company: ________________________________________________________________ o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary. Are building ties shown? (circle one) ‘Yes’ ‘No’ o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? _________________________________ o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’ o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation: (i.e., 100’ first floor elev = 7962.50’) _______________________________ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’ o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________ o According to the building plans, what was the design elevation for the same place on the foundation wall? ______________________________ o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’ o If yes, why? ________________________________________________ The undersigned qualified individual certifies that the information in Part B is accurate - Signature: Date: _ Printed Name: Contact ph. # : ____________________ Company: ______________________________________________________________ 8235.48' Arch 100' = Elev. 8245'-0" 395 Thunderbowl Lane, Aspen Highlands Roger Hall David Johnston Architects City of Aspen Received 07/26/17 Building Department 05/01/2018 nickt City of Aspen General/Building Permit Application 130 South Galena Street, Aspen Permit No.: Aspen, CO 81611 Phone (970) 920-5090 Fax (970) 920-5440 Master Permit No.: Unit #: Legal Description Block: PROJECT INFORMATION MECHANICAL NO.NO. FOR CITY USE ONLY Census Code Occupancy Group Zone District # of Stories # of Dwellings Type of Construction: APPROVALS Name Date Zoning Plan Check Permit Fee Parks Impact HPC Energy Code REMP School Ded. Building Zoning 50%Hourly Plan Check TDM Impact Fire District Eng. Review Zoning Hourly Review Ped. Amenity Engineering Cons. Mit. 50%Engineering Hourly Housing Cash- in-lieu CMP Parks Review Zoning 50% Stormwater fee in lieu Utilities Other Cons. Mit. 50% City Use Tax Water Electrical County Use Tax Sanitation Plumbing GIS Env. Health Mechanical Aspen San. Dist. Parks UtilityZĞǀŝĞǁ Other Approved to issue by: Issued by: PERMIT TYPE: BD CO DE FD FN MH MS RF SN Gross Area This Permit (not FAR): Repair, Alteration, or Addition Water Closet (toilet), Bidet Bathtub Lavatory (wash basin) Total Fixture Count RECEIPTS: Fees due at Submittal: Shower Kitchen Sink & Disposal Dishwasher Laundry Bar, Utility Sinks Clothes Washer Floor Sink Floor Drain Hose Bib Square Footage Valuation PROJECT LOCATION Lot: Job Address: Parcel ID (call 920-5160) Valuation of Work: $ Tract or Subdivision: Const. Mit. Sq. Ft.:Disturbed Area:Utility Affected Area: Description of Work: Use of Building: Class of Work: Parks Affected Area:Existing Gross Area of Unit (not FAR): Fees due at Issuance: FEES Building Gross Sq. FootageAlarm System Req.Fire Sprinkler Req. Lot Area PLANS LOCATION: Occupancy Load Deed Restricted Unit Sq. Footage Accepted by: Other PLUMBING TYPE OF FIXTURE/ITEM PLUMBING continued Water Heater M/BTU ea. Gas Systems: # of Outlets Water Piping & Treating Equipment Other͗ ELECTRICAL Forced Air/Gravity Sys. BTU____ͺͺͺͺͺͺͺͺ AFUE____ͺͺͺ_ Air Handling Unit - CFM Wall, Suspended, or Unit Heaters Evaporative Coolers Snowmelt System Sq. Ft. Ventilation Fans Appliance Vents Range Hood Boilers, (includes vent) BTU___ͺͺͺͺͺͺͺͺ__ AFUE__ͺͺͺ__ Gas Systems: # of Outlets TYPE OF EQUIPMENT Repair, Alteration, or Addition Gas Log Gas Appliance nonoyes yq yes Single Family Multi-Family Commercial/Residential Commercial OtherNewAdditionAlterationRepair Other Move Tenant Finish Demo Change Order A7 273514310007Aspen Highlands Village PUD NEW SINGLE FAMILY RESIDENCE 7,999,563 0 00 71 64 13 4 48 2 21 22 2 798,000 2 014,685 5 5 4996 1 395 Thunderbowl Lane, Aspen Highlands ✔ ✔ 30,198 sf >6000sf 98% Choose option from dropdown 100 (2 Indirect) City of Aspen Received 07/26/17 Building Department 10,723 HG 4/25/18 $0 $18,948.27 $0 n/a $0 CS 4.26.2018X 10R-30/PD30,198 NT 5/1/18 NT 5/1/18 VB x x IRC 0 Dr 3/1/18x/ WELS Dr 5/2/18 TK 5/2/18 SW 4/24/18 PM 8/7/17 City of Aspen Received 07/26/17 Building Department DAM 5/3/18