HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (77).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
x
0
0
0
0153.2017.ARBK 2/7/18
N/A
N/A
NT
04/26/2018
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
IRC Building Description Form New Gdrive/master files/building/apps, forms checklists BCM 1/13/14
MASTER PERMIT#_______________________________
CHANGE ORDER #_______________________________
CHANGE ORDER #_______________________________
CHANGE ORDER #_______________________________
Building Description Form - IRC
Property Location:
Address: Unit #:
Legal Description: (lot, Block)
Owner:
Owner Address:
Parcel ID #:
Building Code Information
Code Editions: 2009 IRC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC
Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____
Type of Construction: VB
Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding ____Permanent Micropiles _____Other (specify): ______________________
Energy Code Compliance Path: ____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff
External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____
Building Description
# Stories Above Grade _______ # Stories Below Grade ________ Garage: Attached______# Of Cars___ Detached______# Of Cars____ Carport_______
Bedrooms______ Full Baths_____3/4 Baths_____1/2 Baths_____ Kitchen_____
# Wood Fireplaces: _______ # Gas Appliances: _______ # Gas Logs:____________
Other Rooms: ____________________________________________________________________
________________________________________________________________________________ ________________________________________________________________________________
ACCESSORY DWELLING UNIT:
Living______Kitchen_______Bath______Bedroom______Other:_________
Reviewed by
Plans Examiner Date
395 Thunderbowl Lane, Aspen Highlands
Apen Highlands PUD , Lot 7 , Block A
Aspen Extreme, LLC
395 Thunderbowl Lane, Aspen Highlands
yes
yes yes
0 004,996
2 1
1 3
5
273514310007
0 4 1
City of Aspen
Received
07/26/17
Building Department
2015 IRC, IMC, IPC, IFCG, IECC, IFC, 2017 NEC
13D
x
6 1 1
Sitting, flex, living, dining, pantry, mudroom, office, study, playroom, exercise room, den, wine,
laundry, panel room, mechanical, storage/mechanical.
NT 5/1/18
0153.2017.ARBK
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
395 Thunderbowl lane, Aspen 0153.2017.ARBK
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities.The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
2. Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
3. Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
2. Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection. Nick Thompson 5/1/18
ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: _____________________________________________
o Your Name (Person Completing Part A): ____________________________________________
o Your Company: ________________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
8235.48'
Arch 100' = Elev. 8245'-0"
395 Thunderbowl Lane, Aspen Highlands
Roger Hall
David Johnston Architects
City of Aspen
Received
07/26/17
Building Department
05/01/2018
nickt
City of Aspen General/Building Permit Application
130 South Galena Street, Aspen Permit No.:
Aspen, CO 81611
Phone (970) 920-5090 Fax (970) 920-5440 Master Permit No.:
Unit #:
Legal
Description
Block:
PROJECT INFORMATION
MECHANICAL
NO.NO.
FOR CITY USE ONLY
Census Code Occupancy Group Zone District # of Stories # of Dwellings Type of Construction:
APPROVALS Name Date
Zoning Plan Check Permit Fee Parks Impact
HPC Energy Code REMP School Ded.
Building Zoning 50%Hourly Plan
Check TDM Impact
Fire District Eng. Review Zoning Hourly
Review Ped. Amenity
Engineering Cons. Mit. 50%Engineering
Hourly
Housing Cash-
in-lieu
CMP Parks Review Zoning 50%
Stormwater fee
in lieu
Utilities
Other
Cons. Mit. 50% City Use Tax
Water Electrical County Use Tax
Sanitation Plumbing GIS
Env. Health Mechanical Aspen San.
Dist.
Parks
UtilityZĞǀŝĞǁ
Other
Approved to issue by:
Issued by:
PERMIT TYPE: BD CO DE FD FN MH MS RF SN
Gross Area This Permit (not FAR):
Repair, Alteration, or Addition
Water Closet (toilet), Bidet
Bathtub
Lavatory (wash basin)
Total Fixture Count
RECEIPTS:
Fees due at Submittal:
Shower
Kitchen Sink & Disposal
Dishwasher
Laundry Bar, Utility Sinks
Clothes Washer
Floor Sink
Floor Drain
Hose Bib
Square Footage
Valuation
PROJECT LOCATION
Lot:
Job Address:
Parcel ID (call 920-5160)
Valuation of Work: $
Tract or Subdivision:
Const. Mit. Sq. Ft.:Disturbed Area:Utility Affected Area:
Description of Work:
Use of Building:
Class of Work:
Parks Affected Area:Existing Gross Area of Unit (not FAR):
Fees due at Issuance:
FEES
Building Gross Sq. FootageAlarm System Req.Fire Sprinkler Req.
Lot Area
PLANS LOCATION:
Occupancy Load Deed Restricted
Unit Sq. Footage
Accepted by:
Other
PLUMBING
TYPE OF FIXTURE/ITEM
PLUMBING continued
Water Heater M/BTU ea.
Gas Systems: # of Outlets
Water Piping & Treating Equipment
Other͗
ELECTRICAL
Forced Air/Gravity Sys. BTU____ͺͺͺͺͺͺͺͺ AFUE____ͺͺͺ_
Air Handling Unit - CFM
Wall, Suspended, or Unit Heaters
Evaporative Coolers
Snowmelt System Sq. Ft.
Ventilation Fans
Appliance Vents
Range Hood
Boilers, (includes vent) BTU___ͺͺͺͺͺͺͺͺ__ AFUE__ͺͺͺ__
Gas Systems: # of Outlets
TYPE OF EQUIPMENT
Repair, Alteration, or Addition
Gas Log
Gas Appliance
nonoyes
yq
yes
Single Family Multi-Family Commercial/Residential Commercial
OtherNewAdditionAlterationRepair
Other
Move Tenant Finish Demo Change Order
A7 273514310007Aspen Highlands Village PUD
NEW SINGLE FAMILY RESIDENCE
7,999,563 0
00
71
64
13
4
48
2
21
22
2
798,000
2
014,685
5
5
4996
1
395 Thunderbowl Lane, Aspen Highlands
✔
✔
30,198 sf
>6000sf
98%
Choose option from dropdown
100 (2 Indirect)
City of Aspen
Received
07/26/17
Building Department
10,723
HG 4/25/18
$0
$18,948.27
$0
n/a
$0
CS 4.26.2018X
10R-30/PD30,198
NT 5/1/18
NT 5/1/18
VB
x x
IRC
0
Dr 3/1/18x/ WELS Dr 5/2/18
TK 5/2/18
SW 4/24/18
PM 8/7/17
City of Aspen
Received
07/26/17
Building Department
DAM 5/3/18