DRAINAGE REPORT FOR
DUNCAN SKIHAUS
533 W. HALLAM STREET, ASPEN, CO
I hereby affirm that this report and the accompanying drawings for the analysis of 533 W.
Hallam Street, Aspen, Colorado was prepared under my direct supervision for the owners
thereof in accordance with the provisions of the City of Aspen Urban Runoff Management
Plan with proposed variances and exceptions listed thereto. I understand that it is the policy
of the City of Aspen that the City of Aspen does not and will not assume liability for drainage
facilities designed by others.
Permit #: 0285.2018.ARBK
January 22, 2020
Rick Barth, P.E. 36749
Prepared by
118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004
970.945.5948 fax
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design i
DRAINAGE REPORT FOR
DUNCAN SKIHAUS
533 W. HALLAM STREET, ASPEN, CO
REVIEWED BY
RICK BARTH
SGM Project # 2018-292.001
I:\2018\2018-292-DuncanSkihaus\001\E-Reports\SGM\Dun-Drainage-Report\docs\Duncan-
Drainage-Report.docx
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design ii
TABLE OF CONTENTS
1.0 Existing Site 3
1.1 Description of Existing Site 3
1.2 Description of Existing Drainage 3
2.0 Proposed Project 3
3.0 Proposed Basins 4
3.1 Basin A (sub-basins 1 & 2) 4
Sub-basin 1 5
Sub-basin 2 5
3.2 Basin B (sub-basins 3, 6, & 7) 5
Sub-basin 3 6
Sub-basin 6 6
Sub-basin 7 7
3.3 Basin C (sub-basin 4) 7
3.4 Basin D (sub-basin 5) 8
4.0 Peak Flow Methodology 8
5.0 Water Quality Methodology 9
6.0 Maintenance 10
6.1 Grass Buffer Maintenance 10
6.2 Pervious Pavers 11
7.0 Conclusion 12
LIST OF APPENDICES
Appendix A – Proposed Drainage Routing Schematic
Appendix B – Tree Canopy Credit Map
Appendix C – Water Quality Capture Volume Calculations
Appendix D – Peak Flow Calculations – Proposed Conditions
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 3
1.0 Existing Site
1.1 Description of Existing Site
The physical address of the project is 533 W. Hallam Street, Aspen, Colorado and it is
located on parcel no. 2735-124-32-001. This parcel is approximately 0.14 acres and is
owned by Duncan Skihaus LLC. Current zoning of the property is medium-density
residential (R-6). The existing structures on the parcel are one house and a small shed. The
project focuses on renovating the house while preserving the historic portion of it. The
existing house is 1897 square feet and has two stories with a garage located near the Block
29 alley.
1.2 Description of Existing Drainage
Existing storm water runs off several areas of the existing house either as sheet flow or
through gutters and downspouts. On the west and north sides of the site, runoff sheet flows
over grass to the curb and gutters along W. Hallam & 5th Streets, respectively. Runoff on the
east side of the building currently enters the neighboring property. Storm water on the south
side of the property enters the alley. No existing storm water detention or treatment BMPs
have been found on the site.
A soils report was performed for the site by HP Kumar on June 19, 2018. The results found
the soil to be Type B with a moderate infiltration rate of 2 to 3 minutes per inch.
There is no existing offsite runoff that enters the property. The property exists within the
Aspen Mountain Drainage Basin and will not require detention beyond the water quality
capture volume (WQCV). Existing peak flow calculations have not been provided for this
report because detention will not be required, and runoff will not cross any other properties
before discharging to the City of Aspen (COA) storm sewer system.
2.0 Proposed Project
The primary purpose of this project is to demolish the non-historic portion of the existing
house and build a new addition. Other improvements include the addition of onsite snowmelt
pavement and improving storm water runoff quality. The proposed project is considered a
major project as defined by the COA Urban Runoff Management Plan (URMP) because
more than 1000 square feet and 25% of the site will be disturbed.
The proposed residential development with have a footprint of 3160 square feet. The
historical portion of the property, which has a footprint of 900 square feet, will be moved
north but will remain intact. The main building will be located on the southern portion of the
lot with a footprint of 2260 square feet.
Storm water quality improvements consist of 1044 square feet of grass buffer, 128 square
feet of pervious pavers, 278.5 square feet of no-infiltration pervious gravel and 6.5 cubic feet
of rain gardens. The grass buffer will be located on the western and northern portion of the
lot. The pervious pavers will be located on the western central portion of the lot. The no-
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 4
infiltration pervious gravel will be located on the eastern central portion of the lot. A rain
garden is located on the northeast portion of the lot. No storm water generated on the site
will flow across the eastern property line onto the neighboring residential lot due to the
placement of a curb on the shoring wall extended slightly above grade. Runoff from the
eastern side of the lot will flow north to W. Hallam St. through grading.
3.0 Proposed Basins
The proposed site has 7 sub-basins, as shown in Appendix A. To clearly describe these
sub-basins, they have been grouped into 4 drainage basins based on shared discharge
locations and water quality treatment. A summary of the basins can be seen below in Table
1 and detailed calculations for Table 1 can be found in Appendix C. Storm water runoff will
be routed to designated BMPs for water quality treatment through a combination of grading
and gutters with downspouts. All proposed storm water runoff will discharge from the site as
sheet flow to W. Hallam & N. 5th Streets. Basins are detailed in the sections that follow, with
tables showing that the required WQCV is treated by BMPs within the basin. The Available
WQCV (cf) is calculated as the WQCV provided (in cubic feet) based on grass buffer areas,
tree canopy credits, proposed rain garden volume, and proposed pervious pavers and
pervious gravel sections.
Table 1 – Basin Summary
3.1 Basin A (sub-basins 1 & 2)
Basin A is located on the north side of the site generally between the property line and the
Duncan Skihaus historic building with additional drainage from the front of the historic roof.
Sub-basins 1 and 2 comprise Basin A. This basin is 1356 square feet of which 488 square
feet is impervious. Tree canopy credit is calculated per section 8.4.1 of the COA URMP, a
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 5
detailed calculation is shown in Appendix C. A 150 square foot grass buffer and a 6.5 cubic
foot rain garden will be used to treat the remaining WQCV. See Appendix A for the
proposed location of BMPs in this basin.
Table 2
Basin A
Basin Area (sf) 1356
% Impervious 36%
Required WQCV (cf) 8.39
Credits
Pervious Paver Area (sf) 0
Grass Buffer Area (sf) 150
Tree Canopy Credit Area (sf) 190
Vol. (cf) 0
Rain Garden Vol. (cf) 6.5
Results
Effective Impervious Area (sf) 148
Effective % Imperviousness 10.9%
Net WQCV (cf) -3.1
Available WQCV (cf) 11.5
Sub-basin 1
Sub-basin 1 is located towards north-east corner of the property and has a total and
impervious area of 684 and 254 square feet, respectively. This corresponds to 37%
impervious area for the sub-basin. This area is mostly a grassed area with the north-eastern
portion of the roof included. Storm water will be routed from the roof to a rain garden via roof
drainage and gutter downspouts then west to the reverse trench drain and finally, curb and
gutter on W. Hallam St. 4” underdrains will be routed to a sump and pump in sub-basin 1.
From there the sump and pump will evacuate collected storm water utilizing a reverse trench
drain
Sub-basin 2
Sub-basin 2 is located at the very north-west corner of the property and has a total and
impervious area of 672 and 234 square feet, respectively. This corresponds to 35%
impervious area for the sub-basin. This area is mostly a grassed area with the north-western
portion of the roof included. Storm water will be routed from the roof to a 150 square foot
grass buffer via sheet flow and then north to the curb and gutter on W. Hallam St. Grass
buffer is at or above a 1:1 ratio to impervious area, after removing the tree canopy credit.
3.2 Basin B (sub-basins 3, 6, & 7)
Basin B is located on the eastern boundary of the site, with a “leg” that reaches the northern
boundary of the site and will collect runoff from the back side of the roof of the historic house
and the north end of the proposed structure. Sub-basins 3, 6, and 7 comprise Basin B.
Storm water runoff will flow from roof areas toward the east property boundary over no-
infiltration pervious gravel and then over the front lawn near W. Hallam Street. This basin is
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 6
2537 square feet of which 1921 square feet is impervious. No-infiltration pervious gravel,
and tree canopy credit will be used to treat the remaining WQCV. The proposed no-
infiltration pervious gravel is 315 square feet. See Appendix A for the proposed location of
BMPs in this basin. The no-infiltration pervious gravel is based off the no-infiltration pervious
paver detail found in figure 8.31 of the COA URMP. Since the landscape architect preferred
a gravel surface in this area and the pavers provide no treatment, they are not being used.
After water infiltrates through the gravel and enters the underdrain, it is discharged by a
reverse trench drain in sub-basin 1 to ensure runoff is leaving the site in the same manner it
did historically.
Table 3
Basin B
Basin Area (sf) 2537
% Impervious 76%
Required WQCV (cf) 33.3
Credits
Pervious Paver Area (sf) 0
Grass Buffer Area (sf) 0
Tree Canopy Credit Area (sf) 15.6
Vol. (cf) 46.4
Rain Garden Vol. (cf) 0
Results
Effective Impervious Area (sf) 1905
Effective % Imperviousness 75%
Net WQCV (cf) -13.5
Available WQCV (cf) 46.8
Sub-basin 3
Sub-basin 3 is located along the eastern portion of the property, toward W. Hallam Street,
and has a total and impervious area of 1262 and 970 square feet, respectively. This
corresponds to 66% impervious area for the sub-basin. All storm water in sub-basin 3 will be
routed by grading, downspouts and gutters to 126.5 square feet of no-infiltration pervious
gravel. Remaining WQCV is treated by tree canopy credits. The no-infiltration pervious
gravel in sub-basin 3 result in roughly 4.44 cubic feet of excess available WQCV that can
accommodate any untreated runoff from sub-basin 6 (see Section 3.2.2 ). Runoff collected
in the hydrodrain hydroduct system for the “green-roof” patios will be directed to an
underdrain system and routed to a sump and pump in the crawlspace. This sump and pump
will push water to a drain outlet in sub-basin 3 upon which it will hit a splash block and
distribute the flow over Mexican beach pebble landscaping of sub-basin 3.
Sub-basin 6
Sub-basin 6 is located on the east-central portion of the property and has a total and
impervious area of 442 and 327 square feet, respectively. This corresponds to 74%
impervious area for the sub-basin. All storm water in sub-basin 6 will be routed by grading,
downspouts and gutters to 112.2 square feet of no-infiltration pervious gravel. This results in
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 7
roughly 13.1 cubic feet of excess available WQCV that can accommodate untreated runoff
from sub-basin 7 (see Section 3.2.3).
Sub-basin 7
Sub-basin 7 is located on the southern portion of the property and extends from the western
most extent to the eastern. Sub-basin 7 has a total and impervious area of 834 and 624
square feet, respectively. This corresponds to 75% impervious area for the sub-basin. This
sub-basin is adjacent to the alley along the southern property boundary and has a garage.
Runoff generated will not be conveyed through the alley, except for the concrete garage
apron. The concrete garage apron will have a micropile wall below and will not
accommodate an underdrain to route water towards the rain garden in sub-basin 1.
Additionally, the utilities entering from the southeast corner would pose a conflict for the
underdrain routing. The remaining runoff from sub-basin 7 will be routed by grading,
downspouts and gutters to 39.8 square feet of no-infiltration pervious gravel to the east of
the residence. Drainage and grading will allow roughly 4.01 cubic feet of untreated runoff in
this basin will sheet flow into sub-basin 6, where there is excess available treatment volume
provided by the no-infiltration pervious gravel.
3.3 Basin C (sub-basin 4)
Basin C is located on the north-west side of the site and will collect runoff from the back side
of the roof for the historic building and the north end of the proposed structure. Basin C
consists only of sub-basins 4. Storm water will be routed from both roofed areas to pervious
pavers and then sheet flow to 5th Street. Runoff from non-pervious landscaping will sheet
flow to the curb and gutter on 5th St. This basin is 796 square feet of which 259 square feet
is impervious. Storm water runoff will be treated with 77 square feet of pervious pavers.
Remaining WQCV is expected to be treated by the reduction in impervious area provided by
a 135.3 square foot tree canopy credit and 257 square feet of grass buffer. Grass buffer is at
or above a 1:1 ratio to impervious area, after removing the tree canopy credit. See Appendix
A for the proposed location of BMPs in this basin. Water runoff is leaving the site in the
same manner it did historically.
Table 4
Basin C
Basin Area (sf) 796
% Impervious 33%
Required WQCV (cf) 4.6
Credits
Pervious Paver Area (sf) 77
Grass Buffer Area (sf) 257
Tree Canopy Credit Area (sf) 135.3
Vol. (cf) 18.0
Rain Garden Vol. (cf) 0.0
Results
Effective Impervious Area (sf) -287
Effective % Imperviousness -36%
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 8
Net WQCV (cf) 0
Available WQCV (cf) 4.6
3.4 Basin D (sub-basin 5)
Basin D is located along the west-central portion of the site, comprised solely of sub-basin 5.
Storm water will be routed from the roof to pervious pavers and then sheet flow to 5th Street.
Runoff from non-pervious landscaping will sheet flow to the curb and gutter on 5th St. Runoff
from non-pervious landscaping will sheet flow to the curb and gutter on 5th St. This basin is
1312 square feet of which 720 square feet is impervious. Pervious pavers will be used to
treat runoff from the roof. The proposed pervious pavers cover 51 square feet. Remaining
WQCV is treated by the reduction in effective impervious area provided by the 129 square
foot tree canopy credit and 637 square feet of grass buffer area. Grass buffer is at or above
a 1:1 ratio to impervious area. See Appendix A f or the proposed location of BMPs in this
basin. Water runoff is leaving the site in the same manner it did historically.
Table 5
Basin D
Basin Area (sf) 1312
% Impervious 55%
Required WQCV (cf) 11.7
Credits
Pervious Paver Area (sf) 51
Grass Buffer Area (sf) 637
Tree Canopy Credit Area (sf) 129
Vol. (cf) 11.4
Rain Garden Vol. (cf) 0
Results
Effective Impervious Area (sf) -147
Effective % Imperviousness -11%
Net WQCV (cf) 0
Available WQCV (cf) 11.7
4.0 Peak Flow Methodology
Proposed drainage flow rates were determined using the rational method as explained in
section 3.4 of the URMP and rainfall characteristics as explained in section 2 of the URMP.
The rational method calculations for peak flow can be seen in Appendix D. The following
tables list the parameters that were used, and the results determined for proposed
conditions.
Table 6 Watershed Characteristics
Imperviousness
Overland
Flow Time
(min)
Channel
Flow Time
(min)
Time of
Concentration
(min)
Max
Watershed
Length (ft)
Watershed
Slope (ft/ft) C5
56.5% N/A N/A 8.40 100 0.026 0.46
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 9
Table 7 Proposed Conditions for 10-Year Storm
C10 – Hydro Soil
Group B I10 (in/hr) A - (acres)
Contributing Area Q10 (cfs)
0.51 3.19 0.14 0.23
Table 8 Proposed Conditions for 100-Year Storm
C100 – Hydro Soil
Group B I100 (in/hr) A - (acres)
Contributing Area Q100 (cfs)
0.69 5.09 0.14 0.48
For the calculation of proposed peak flows, the entire property was modeled as one
catchment. This assumption is justified by the relatively small area of the property (the
Rational Method is valid to 90 acres and this property is 0.14 acres). From Figure 3.1 of the
URMP, the soil can be classified as NRCS Hydrologic Soil Group B. The intensity for the 10-
year and 100-year storm were determined using Equation 2-1 of the URMP.
5.0 Water Quality Methodology
The Required WQCV (cf) for each basin on the property was estimated from Figure 8.13 of
the URMP based on the basin imperviousness and basin area. Then WQCV credits were
estimated based on the proposed areas for grass buffers, pervious pavers, and preserved
tree canopy (see further discussion of tree canopy credit below). All credits were deducted
from the impervious area of the basin and the effective impervious area were computed,
based on the instruction of section 8.4.1 in the URMP. From effective impervious area, the
effective imperviousness was calculated and an Effective WQCV (cf) was estimated from
Figure 8.13. Rain gardens and no-infiltration gravel (porosity = 0.333) were assumed 0.5 ft
deep and their capture volumes were deducted from the Effective WQCV (cf) to find the Net
WQCV (cf). If Net WQCV (cf) was found to be negative, it implies there is surplus treatment
capacity in the basin, and a positive Net WQCV (cf) implies there is a shortage of treatment
capacity in the basin.
The Available WQCV is defined in this report to be the difference between the Required
WQCV (cf) and the Net WQCV (cf). If Available WQCV (cf) is greater than the Required
WQCV (cf), this implies there is a surplus treatment capacity within the basin, and if
Available WQCV (cf) is less than the Required WQCV (cf), this implies a shortage of
treatment within the basin.
The Tree Canopy Credit was calculated following the recommendations in section 8.4.1 of
the URMP. Detailed calculations for the Tree Canopy Credit can be found in Appendix C. In
addition, a map showing the designated trees and their canopy areas is shown in Appendix
B. Runoff from all impervious areas will be treated by directing the runoff over a grass buffer,
pervious pavers, and a rain garden. All proposed runoff will leave the property as sheet flow
and will flow over grass lawn located in the right of way before entering the curb and gutter
system.
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 10
6.0 Maintenance
6.1 Grass Buffer Maintenance
The following maintenance recommendations were found in the City of Aspen URMP.
Mowing recommendations for grass buffers that are included in the Urban Drainage Flood
Control District USDCM: Volume 3 Stormwater Quality are provided in the figure below.
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 11
6.2 Pervious Pavers
The following maintenance recommendations were found in the Urban Drainage Flood Control
District USDCM: Volume 3 Storm water Quality (page 6-15 to 6-17) and will be used as a guide
for the maintenance of the proposed pervious pavers. An inspection of the condition and
observation of infiltration should be completed annually. The pavers will lose infiltration
capabilities over time and it is recommended to use ASTM C1707 Standard Test Method for
Infiltration Rate of In Place Pervious Concrete to measure the infiltration rate of the pavers. A
regenerative air or vacuumed sweeper should be used twice annually and after any significant
site work, like landscaping, is done. However, the timing of vacuum sweeping is variable based
on site conditions and biannual vacuuming may be more often than needed. Sand should never
be applied to the pavers for snow removal as this will decrease the permeability of the pavers.
The proposed pavers will have snowmelt capabilities, but if snow removal is necessary,
mechanical snow removal should be done. If the surface of the paver system ever becomes
completely clogged, remove and replacement of the first ½ to 1 inch of infill. The use of a push
broom is recommended for the replacement of infill.
6.3 Sump and Pump
Sump and pump must be inspected and maintained yearly to remove sediment and debris that
is washed into them. Minimum inspection and maintenance requirements include the following:
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design 12
• Inspect sump and pump annually and after every storm exceeding 0.5 inches.
• Locate sump lid and cut an outline in sod to replace sod patch after maintenance.
• Remove the pump from the sump and clean it and inspect it.
• Dispose of sediment, debris/trash, and any other waste material removed from sump at
suitable disposal sites and in compliance with local, state, and federal waste
regulations.
• Check the owner’s manual to see if the pump bearings require grease or oil. If you do
not have the manual, look it up on the internet using the manufacturer and model
number of your pump or contact the manufacturer.
• Replace the pump in the sump and check that it is connected to power.
• Dump a bucket of water into the sump to raise the float and make sure the pump turns
on, adjusting the float if required.
6.4 Rain Garden
The rain garden is to be filled above the filter material with Mexican beach pebbles on the south
and long fibered mulch to the north. These filler materials were chosen to integrate with the
surrounding landscaping materials and to provide free drainage for the rain garden filter
materials below. Annual inspection of the beach pebbles and mulch should be taken to ensure
that the material is not clogged and inhibiting drainage. Inspection after large storms should
also be taken to ensure that the rain garden is draining as it should. Replacement and/or
cleaning of the material should be performed when it is observed that the rain garden is
performing less than optimally in its existing condition.
7.0 Conclusion
The proposed BMPs (grass buffer, pervious pavers, and rain gardens) are expected to treat
100% of the required WQCV at the 533 W. Hallam Street project with room to spare. With
proper maintenance and installation, these BMPs will meet the criteria outlined in the City of
Aspen’s current Urban Runoff Management Plan.
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
Appendix C
Water Quality Capture Volume Calculations
Basin A
𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍 𝑨𝒍𝒂𝒂
𝑷𝒍𝒍𝒂𝒍 𝑨𝒍𝒂𝒂× 𝟎𝟎𝟎=𝟎𝟎𝟎 𝒂𝒍𝟎
𝟎𝟎𝟎𝟎 𝒂𝒍𝟎× 𝟎𝟎𝟎=𝟎𝟎%
Then lookup Required WQCV from Figure 8.13, which is 𝟎.𝟎𝟎𝟎 𝒉𝒍 𝒂𝒂𝒍𝒍𝒉 and…
𝑷𝒂𝒍𝒍𝒉𝒍𝒂𝒂 𝑽𝑷𝑨𝑽 (𝒍𝒍𝒍.)=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)× 𝑨𝒂𝒍𝒉𝒍 𝑨𝒍𝒂𝒂
=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)(𝟎𝟎𝟎𝟎 𝒂𝒍𝟎)
=𝟎.𝟎𝟎 𝒂𝒍𝟎
Now, find the effective impervious area (𝑬𝑰𝑨)…
𝐴𝐼𝐴 = 𝐼𝑙𝑙𝑐𝑙𝑙.𝐴𝑙𝑐𝑎−𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙−𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎−2(𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎)
where…
𝐼𝑙𝑙𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=488 𝑐𝑙2
𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎=150 𝑐𝑙2
𝑃𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎=0 𝑐𝑙2
and…
𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙=0.15(𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)+0.3(𝐴𝑙𝑙𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)
where…
𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=309 𝑐𝑙2
𝐴𝑙𝑙�ℎ𝑐𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=478 𝑐𝑙2
so…
𝐴𝐼𝐴=480 𝑐𝑙2 −0.15(309 𝑐𝑙2 )−0.3(478 𝑐𝑙2 )−150 𝑐𝑙2
𝐴𝐼𝐴= 148 𝑐𝑙2
and…
𝑬𝒂𝒂.𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=𝟎𝟎.𝟎%
Then use it to find Effective WQCV from Figure 8.13, which is 𝟎.𝟎𝟎𝟎 𝒉𝒍 𝒂𝒂𝒍𝒍𝒉 and…
𝐴𝑐𝑐𝑐𝑐𝑙�ℎ𝑙𝑐 𝑉𝑃𝐴𝑉 (𝑐𝑙3 )=0.030 �ℎ𝑙(1 𝑐𝑙
12 �ℎ𝑙)× 𝐴𝑎𝑙�ℎ𝑙 𝐴𝑙𝑐𝑎
= 0.030 �ℎ𝑙 (1 𝑐𝑙
12 �ℎ𝑙)(1356 𝑐𝑙2 )
=3.39 𝑐𝑙3
𝐿𝑙 𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=𝐴𝑙𝑐𝑎× 𝑐𝑐𝑙𝑙�× 𝑃𝑐𝑙𝑐𝑐𝑙𝑙 𝑉𝑙�ℎ𝑐 𝑃𝑙𝑎𝑐𝑐
=(0 𝑐𝑙2 )(𝐿�ℎ𝑙.0.5 𝑐𝑙 𝑐𝑐𝑙𝑙�)(33%)
=0 𝑐𝑙3
𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=6.50 𝑐𝑙3
Finally…
𝑵𝒂𝒍 𝑽𝑷𝑨𝑽=(𝐴𝑐𝑐𝑐𝑐𝑙�ℎ𝑙𝑐 𝑉𝑃𝐴𝑉)−(𝐿𝑙−𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙.)−𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙.
=3.39 𝑐𝑙3 −0 𝑐𝑙3 −6.5 𝑐𝑙3
𝑵𝒂𝒍 𝑽𝑷𝑨𝑽=−𝟎.𝟎 𝒂𝒍𝟎
𝑨𝒍𝒂𝒉𝒍𝒂𝒂𝒍𝒂 𝑽𝑷𝑨𝑽=𝑃𝑐𝑙𝑙�ℎ𝑙𝑐𝑐 𝑉𝑃𝐴𝑉−𝐿𝑐𝑙 𝑉𝑃𝐴𝑉 = 𝟎𝟎.𝟎 𝒂𝒍𝟎
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
Basin B
𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍 𝑨𝒍𝒂𝒂
𝑷𝒍𝒍𝒂𝒍 𝑨𝒍𝒂𝒂× 𝟎𝟎𝟎=𝟎𝟎𝟎𝟎 𝒂𝒍𝟎
𝟎𝟎𝟎𝟎 𝒂𝒍𝟎× 𝟎𝟎𝟎=𝟎𝟎%
Then lookup Required WQCV from Figure 8.13, which is 𝟎.𝟎𝟎𝟎 𝒉𝒍 𝒂𝒂𝒍𝒍𝒉 and…
𝑷𝒂𝒍𝒍𝒉𝒍𝒂𝒂 𝑽𝑷𝑨𝑽 (𝒍𝒍𝒍.)=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)× 𝑨𝒂𝒍𝒉𝒍 𝑨𝒍𝒂𝒂
=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)(𝟎𝟎𝟎𝟎 𝒂𝒍𝟎)
=𝟎𝟎.𝟎𝟎 𝒂𝒍𝟎
Now, find the effective impervious area (𝑬𝑰𝑨)…
𝐴𝐼𝐴 = 𝐼𝑙𝑙𝑐𝑙𝑙.𝐴𝑙𝑐𝑎−𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙−𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎−2(𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎)
where…
𝐼𝑙𝑙𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=1921 𝑐𝑙2
𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎=0 𝑐𝑙2
𝑃𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎=0 𝑐𝑙2
and…
𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙=0.15(𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)+0.3(𝐴𝑙𝑙𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)
where…
𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=104 𝑐𝑙2
𝐴𝑙𝑙�ℎ𝑐𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=0 𝑐𝑙2
so…
𝐴𝐼𝐴=1921 𝑐𝑙2 −0.15(104 𝑐𝑙2 )−0.3(0 𝑐𝑙2 )−0 𝑐𝑙2
𝐴𝐼𝐴= 1905 𝑐𝑙2
and…
𝑬𝒂𝒂.𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=𝟎𝟎%
Then use it to find Effective WQCV from Figure 8.13, which is 𝟎.𝟎𝟎𝟎 𝒉𝒍 𝒂𝒂𝒍𝒍𝒉 and…
𝑬𝒂𝒂𝒂𝒂𝒍𝒉𝒍𝒂 𝑽𝑷𝑨𝑽 (𝒂𝒍𝟎)=0.156 �ℎ𝑙(1 𝑐𝑙
12 �ℎ𝑙)× 𝐴𝑎𝑙�ℎ𝑙 𝐴𝑙𝑐𝑎
= 0.156 �ℎ𝑙 (1 𝑐𝑙
12 �ℎ𝑙)(2537 𝑐𝑙2 )
=32.9 𝑐𝑙3
𝐿𝑙𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=𝐴𝑙𝑐𝑎× 𝑐𝑐𝑙𝑙�× 𝑃𝑐𝑙𝑐𝑐𝑙𝑙 𝑉𝑙�ℎ𝑐 𝑃𝑙𝑎𝑐𝑐
=(278 𝑐𝑙2 )(0.5 𝑐𝑙 𝑐𝑐𝑙𝑙�)(33%)
=46.4 𝑐𝑙3
𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=0 𝑐𝑙3
Finally…
𝑵𝒂𝒍 𝑽𝑷𝑨𝑽=(𝐴𝑐𝑐𝑐𝑐𝑙�ℎ𝑙𝑐 𝑉𝑃𝐴𝑉)−(𝐿𝑙−𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙.)−𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙.
=32.9 𝑐𝑙3 −46.4 𝑐𝑙3 −0 𝑐𝑙3
𝑷𝒍𝒂𝒂𝒍𝒂𝒂 𝑽𝑷𝑨𝑽=−𝟎𝟎.𝟎 𝒂𝒍𝟎
𝑨𝒍𝒂𝒉𝒍𝒂𝒂𝒍𝒂 𝑽𝑷𝑨𝑽=𝑃𝑐𝑙𝑙�ℎ𝑙𝑐𝑐 𝑉𝑃𝐴𝑉−𝐿𝑐𝑙 𝑉𝑃𝐴𝑉 = 𝟎𝟎.𝟎 𝒂𝒍𝟎
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
Basin C
𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍 𝑨𝒍𝒂𝒂
𝑷𝒍𝒍𝒂𝒍 𝑨𝒍𝒂𝒂× 𝟎𝟎𝟎=𝟎𝟎𝟎 𝒂𝒍𝟎
𝟎𝟎𝟎 𝒂𝒍𝟎× 𝟎𝟎𝟎=𝟎𝟎%
Then lookup Required WQCV from Figure 8.13, which is 𝟎.𝟎𝟎𝟎 𝒉𝒍 𝒂𝒂𝒍𝒍𝒉 and…
𝑷𝒂𝒍𝒍𝒉𝒍𝒂𝒂 𝑽𝑷𝑨𝑽 (𝒍𝒍𝒍.)=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)× 𝑨𝒂𝒍𝒉𝒍 𝑨𝒍𝒂𝒂
=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)(𝟎𝟎𝟎 𝒂𝒍𝟎)
=𝟎.𝟎 𝒂𝒍𝟎
Now, find the effective impervious area (𝑬𝑰𝑨)…
𝐴𝐼𝐴 = 𝐼𝑙𝑙𝑐𝑙𝑙.𝐴𝑙𝑐𝑎−𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙−𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎−2(𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎)
where…
𝐼𝑙𝑙𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=259 𝑐𝑙2
𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎=257 𝑐𝑙2
𝑃𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎=77 𝑐𝑙2
and…
𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙=0.15(𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)+0.3(𝐴𝑙𝑙𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)
where…
𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=51 𝑐𝑙2
𝐴𝑙𝑙�ℎ𝑐𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=425 𝑐𝑙2
so…
𝐴𝑐𝑐.𝐼𝑙𝑙.𝐴𝑙𝑐𝑎=756 𝑐𝑙2 −0.15(51 𝑐𝑙2 )−0.3(425 𝑐𝑙2 )−257 𝑐𝑙2 −2(77 f𝑙2 )
𝐴𝑐𝑐.𝐼𝑙𝑙.𝐴𝑙𝑐𝑎= −287 𝑐𝑙2
and…
𝑬𝒂𝒂.𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=−𝟎𝟎%
𝐿𝑙𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=0 𝑐𝑙3
𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=0 𝑐𝑙3
Finally…
𝑵𝒂𝒍 𝑽𝑷𝑨𝑽=(𝐴𝑐𝑐𝑐𝑐𝑙�ℎ𝑙𝑐 𝑉𝑃𝐴𝑉)−(𝐿𝑙−𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙.)−𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙.
=4.6 𝑐𝑙3 −0 𝑐𝑙3 −0 𝑐𝑙3
𝑷𝒍𝒂𝒂𝒍𝒂𝒂 𝑽𝑷𝑨𝑽=𝟎.𝟎 𝒂𝒍𝟎
𝑨𝒍𝒂𝒉𝒍𝒂𝒂𝒍𝒂 𝑽𝑷𝑨𝑽=𝑃𝑐𝑙𝑙�ℎ𝑙𝑐𝑐 𝑉𝑃𝐴𝑉−𝐿𝑐𝑙 𝑉𝑃𝐴𝑉 = 𝟎.𝟎 𝒂𝒍𝟎
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
Basin D
𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍 𝑨𝒍𝒂𝒂
𝑷𝒍𝒍𝒂𝒍 𝑨𝒍𝒂𝒂× 𝟎𝟎𝟎=𝟎𝟎𝟎 𝒂𝒍𝟎
𝟎𝟎𝟎𝟎 𝒂𝒍𝟎× 𝟎𝟎𝟎=𝟎𝟎%
Then lookup Required WQCV from Figure 8.13, which is 𝟎.𝟎𝟎𝟎 𝒉𝒍 𝒂𝒂𝒍𝒍𝒉 and…
𝑷𝒂𝒍𝒍𝒉𝒍𝒂𝒂 𝑽𝑷𝑨𝑽 (𝒍𝒍𝒍.)=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)× 𝑨𝒂𝒍𝒉𝒍 𝑨𝒍𝒂𝒂
=𝟎.𝟎𝟎𝟎 𝒉𝒍 (𝟎 𝒂𝒍
𝟎𝟎 𝒉𝒍)(𝟎𝟎𝟎𝟎 𝒂𝒍𝟎)
=𝟎𝟎.𝟎 𝒂𝒍𝟎
Now, find the effective impervious area (𝑬𝑰𝑨)…
𝐴𝐼𝐴 = 𝐼𝑙𝑙𝑐𝑙𝑙.𝐴𝑙𝑐𝑎−𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙−𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎−2(𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎)
where…
𝐼𝑙𝑙𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=720 𝑐𝑙2
𝐺𝑙𝑎𝑙𝑙 𝐴𝑙𝑐𝑐𝑐𝑙 𝐴𝑙𝑐𝑎=637 𝑐𝑙2
𝑃𝑐𝑙𝑙�ℎ𝑙𝑙𝑙 𝑃𝑎𝑙𝑐𝑙 𝐴𝑙𝑐𝑎=51 𝑐𝑙2
and…
𝑃𝑙𝑐𝑐 𝐴𝑎𝑙𝑙𝑙𝑦 𝐴𝑙𝑐𝑐�ℎ𝑙=0.15(𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)+0.3(𝐴𝑙𝑙𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎)
where…
𝐴𝑐𝑐�ℎ𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=858 𝑐𝑙2
𝐴𝑙𝑙�ℎ𝑐𝑐𝑙𝑙𝑙𝑙 𝐴𝑙𝑐𝑎=0 𝑐𝑙2
so…
𝐴𝑐𝑐.𝐼𝑙𝑙.𝐴𝑙𝑐𝑎=720 𝑐𝑙2 −0.15(0 𝑐𝑙2 )−0.3(858 𝑐𝑙2 )−637 𝑐𝑙2 −2(51 𝑐𝑙2 )
𝐴𝑐𝑐.𝐼𝑙𝑙.𝐴𝑙𝑐𝑎= −147 𝑐𝑙2
and…
𝑬𝒂𝒂.𝑷𝒂𝒍𝒂𝒂𝒍𝒍 𝑰𝒍𝒍𝒂𝒍𝒍𝒉𝒍𝒍𝒍𝒍𝒂𝒍𝒍=−𝟎𝟎%
𝐿𝑙𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=0 𝑐𝑙2
𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙𝑙𝑙𝑐=0 𝑐𝑙3
Finally…
𝑵𝒂𝒍 𝑽𝑷𝑨𝑽=(𝐴𝑐𝑐𝑐𝑐𝑙�ℎ𝑙𝑐 𝑉𝑃𝐴𝑉)−(𝐿𝑙−𝐼𝑙𝑐�ℎ𝑙𝑙𝑙𝑎𝑙�ℎ𝑙𝑙 𝑃𝑐𝑙𝑙.𝑃𝑎𝑙𝑐𝑙 𝑉𝑙𝑙.)−𝑃𝑎�ℎ𝑙 𝐺𝑎𝑙𝑐𝑐𝑙 𝑉𝑙𝑙.
=11.7 𝑐𝑙3 −0 𝑐𝑙3 −0 𝑐𝑙3
𝑷𝒍𝒂𝒂𝒍𝒂𝒂 𝑽𝑷𝑨𝑽=𝟎𝟎.𝟎 𝒂𝒍𝟎
𝑨𝒍𝒂𝒉𝒍𝒂𝒂𝒍𝒂 𝑽𝑷𝑨𝑽=𝑃𝑐𝑙𝑙�ℎ𝑙𝑐𝑐 𝑉𝑃𝐴𝑉−𝐿𝑐𝑙 𝑉𝑃𝐴𝑉 = 𝟎 𝒂𝒍𝟎
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
Appendix D
Peak Flow Calculations for Project Site – Proposed Conditions
• Watershed Area, 𝐴
𝑨=𝟎𝟎𝟎𝟎 𝒂𝒍𝟎=𝟎.𝟎𝟎 𝒂𝒂𝒍𝒂𝒍
• Percent Imperviousness, �ℎ
�ℎ=𝐴𝑖𝑙𝑜
𝐴𝑡𝑜𝑡𝑎𝑙
× 100
�ℎ=488 𝑐𝑙2 +1921 𝑐𝑙2 +259 𝑐𝑙2 +720 𝑐𝑙2
6000 𝑐𝑙2 × 100
𝒉=𝟎𝟎.𝟎%
• Maximum Watershed Length, 𝐿0
𝑳𝟎=𝟎𝟎𝟎 𝒂𝒍,extent of property from South to North
• Watershed Slope, 𝑃0
𝑃0 =𝐴𝑙𝑐𝑙𝑎𝑙�ℎ𝑙𝑙 𝑎𝑙 𝑙𝑙𝑙𝑙� 𝑐𝑙𝑐−𝐴𝑙𝑐𝑙𝑎𝑙�ℎ𝑙𝑙 𝑎𝑙 𝑙𝑙𝑙𝑙� 𝑐𝑙𝑐
𝐿0
𝑃0 =7915.14 𝑐𝑙−7912.54 𝑐𝑙
100 𝑐𝑙
𝑷𝟎=𝟎.𝟎× 𝟎𝟎−𝟎
• Runoff Coefficients, 𝐴5, 𝐴10, & 𝐴100
Expressions for the 5-, 10-, and 100-year storm return period runoff coefficients can
be found in Table 6-4 in the Urban Drainage and Flood Control District (UDFCD)
Urban Storm Drainage Criteria Manual (USDCM)
𝐴5 =0.86�ℎ0.33 =0.4621
𝐴10 =0.81�ℎ+0.057 =0.5147
𝐴100 =0.47�ℎ+0.426 =0.6916
• Computed Time of Concentration, 𝑃𝑐
𝑃𝑐=𝑃𝑜+𝑃𝑓
where…
𝑃𝑜=0.395(1.1−𝐶5√𝐾0 )
𝑅0
0.33 (Overland flow time, Equation 3-4 in COA URMP)
𝑃𝑓=𝐾𝑓
60𝐾√𝑅𝑓
(Channelized flow time, Equation 3-5 in COA URMP)
And since there’s no channelized flow, 𝑃𝑓=0 so…
𝑃𝐶=𝑃𝑜=0.395(1.1 −0.4621)√100 𝑐𝑙
(2.6 × 10−2)0.33
𝑷𝑨=𝟎.𝟎𝟎 𝒍𝒉𝒍𝒍𝒍𝒂𝒍
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
• Design Time of Concentration, 𝑃𝑐
The design time of concentration, 𝑃𝑐, is the lesser of the computed time of
concentration, 𝑃𝑐, and the regional time of concentration, 𝑃𝑅, which is given by
𝑃𝑅=10 +𝐿0 /180
=10 +(100 𝑐𝑙/180)
=10.6 𝑙�ℎ𝑙𝑙𝑙𝑐𝑙
so…
𝑷𝒂=𝟎.𝟎 𝒍𝒉𝒍𝒍𝒍𝒂𝒍
• Peak Runoff for 10-year Storm Return Period, 𝑃10
𝑃10 =𝐴10𝐼10𝐴
where 𝐴10 is the 10-year runoff coefficient, 𝐼10 is the 10-year storm rainfall intensity
(units of �ℎ𝑙/�𝑙), and 𝐴 is the watershed area in units of 𝑎𝑐𝑙𝑐𝑙
𝐼10 =88.8𝑃1
(10+𝑅𝑑)1.052 (Equation 2-1 in COA URMP)
and 𝑃1 is the 1-hr precipitation intensity for a 10-year storm
𝑃1 =0.77 �ℎ𝑙/�𝑙 (Table 2.2 of the COA URMP)
so…
𝐼10 =88.8(0.77)
(10 +8.4)1.052
𝑰𝟎𝟎=𝟎.𝟎𝟎𝒉𝒍
𝒉𝒍
then the 10-year peak runoff is given by..
𝑃10 =(0.5147)(3.19 �ℎ𝑙
�𝑙)(0.14 𝑎𝑐𝑙𝑐𝑙)
𝑷𝟎𝟎=𝟎.𝟎𝟎𝟎 𝒂𝒂𝒍
• Peak Runoff for 100-year Storm Return Period, 𝑃100
𝑃100 =𝐴100 𝐼100𝐴
where 𝐴10 is the 100-year runoff coefficient, 𝐼10 is the 100-year storm rainfall
intensity (units of �ℎ𝑙/�𝑙), and 𝐴 is the watershed area in units of 𝑎𝑐𝑙𝑐𝑙
𝐼100 =88.8𝑃1
(10+𝑅𝑑)1.052 (Equation 2-1 in COA URMP)
and 𝑃1 is the 1-hr precipitation intensity for a 100-year storm
𝑃1 =1.23 �ℎ𝑙/�𝑙 (Table 2.2 of the COA URMP)
so…
533 W. Hallam Street, Aspen, Colorado January 22, 2020
Drainage Report for Major Design Appendix
𝐼100 =88.8(1.23)
(10 +8.4)1.052
𝑰𝟎𝟎𝟎=𝟎.𝟎𝟎𝒉𝒍
𝒉𝒍
then the 100-year peak runoff is given by
𝑃100 =(0.6916)(5.10 �ℎ𝑙
�𝑙)(0.14 𝑎𝑐𝑙𝑐𝑙)
𝑷𝟎𝟎𝟎=𝟎.𝟎𝟎𝟎 𝒂𝒂𝒍
7 (B)
834 10.76
Sub-basin (Basin)
Area WQCV
sqft cuft
5 (D)
1312 11.69
6 (B)
442 5.60
3 (B)
1262 16.93
4 (C)
796 4.56 2 (A)
672 4.05
1 (A)
684 4.33
Title:
Basins & WQCV
Re
v
i
s
i
o
n
#
Dwg No.
Du
n
c
a
n
S
k
i
h
a
u
s
Ci
t
y
o
f
A
s
p
e
n
,
C
o
l
o
r
a
d
o
Job No.
Drawn by:
Date:
File:
PE:QC:
2018-292.001
JAK
01.22.2020
RB
Dun-MajDrRep
RB
11
8
W
e
s
t
S
i
x
t
h
S
t
r
e
e
t
,
S
u
i
t
e
2
0
0
Gl
e
n
w
o
o
d
S
p
r
i
n
g
s
,
C
O
8
1
6
0
1
97
0
.
9
4
5
.
1
0
0
4
w
w
w
.
s
g
m
-
i
n
c
.
c
o
m
Da
t
e
By
:
Pr
o
j
e
c
t
M
i
l
e
s
t
o
n
e
:
APPENDIX
A 2Of :
Graphic Scale
In Feet: 1" = 10'
0 5 10 20
Impervious Patio -
Treated by
grass/mulch buffer
Demonstrate this area
functions as a green
roof - runoff goes to a
drain mat and to the
subsurface where it is
infiltrated.
This area is grass and
requires no treatment.
Demonstrate This
historical roof area
drains to and is
treated by the green
roof
Impervious Patio -
Treated by
grass/mulch buffer
Demonstrate this area
functions as a green
roof - runoff goes to a
drain mat and to the
subsurface where it is
infiltrated.
Demonstrate this roof
is treated by the
green roof (and that
the patio functions as
a greenroof), the
grass buffer, and the
tree credits. If this
can't be done,
another BMP needs
to be installed.
7 (B)
834 10.76
Sub-basin (Basin)
Area WQCV
sqft cuft
5 (D)
1312 11.69
6 (B)
442 5.60
3 (B)
1262 16.93
4 (C)
796 4.56 2 (A)
672 4.05
1 (A)
684 4.33
Title:
Tree Canopy Credit
Re
v
i
s
i
o
n
#
Dwg No.
Du
n
c
a
n
S
k
i
h
a
u
s
Ci
t
y
o
f
A
s
p
e
n
,
C
o
l
o
r
a
d
o
Job No.
Drawn by:
Date:
File:
PE:QC:
2018-292.001
JAK
01.22.2020
RB
Dun-MajDrRep
RB
11
8
W
e
s
t
S
i
x
t
h
S
t
r
e
e
t
,
S
u
i
t
e
2
0
0
Gl
e
n
w
o
o
d
S
p
r
i
n
g
s
,
C
O
8
1
6
0
1
97
0
.
9
4
5
.
1
0
0
4
w
w
w
.
s
g
m
-
i
n
c
.
c
o
m
Da
t
e
By
:
--
-
-
Pr
o
j
e
c
t
M
i
l
e
s
t
o
n
e
:
APPENDIX
B 2Of :
Graphic Scale
In Feet: 1" = 10'
0 5 10 20