Loading...
HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (35).ACBKREScheck Software Version 4.6.2 Compliance Certificate Project Hotel Lenado Energy Code:2015 IECC Location:Aspen, Colorado Construction Type:Single-family Project Type:New Construction Conditioned Floor Area:3,899 ft2 Glazing Area 27% Climate Zone:7 (9922 HDD) Permit Date: Construction Site: City & Townsite of Aspen block 75. Lot A thru C Aspen, CO 81611 Owner/Agent: Lori Gerety Forum Phi 715 W. Main St. Ste 204 Aspen, CO 81611 970-279-4157 lgerety@forumphi.com Designer/Contractor: Martin Zourek AEC PO Box 8489 40801 US 6 & 24, Ste 214 Avon, CO 81620 970-748-8520 martin@aec-vail.com Permit Number: Compliance: Passes using UA trade-off 0.3% Better Than Code Maximum UA:584 Your UA:582 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Wall 1 - west: Steel Frame, 24" o.c.944 21.0 10.0 0.048 35 Window 1: Metal Frame with Thermal Break:Double Pane 27 0.310 8 Door 1: Glass 198 0.320 63 Wall 2 - north: Steel Frame, 24" o.c.982 21.0 10.0 0.048 43 Window 2: Metal Frame with Thermal Break:Double Pane 96 0.310 30 Wall 3 - south: Steel Frame, 24" o.c.862 21.0 10.0 0.048 23 Window 3: Metal Frame with Thermal Break:Double Pane 277 0.290 80 Door 2: Glass 99 0.310 31 Wall 4 - east: Steel Frame, 24" o.c.977 21.0 10.0 0.048 30 Window 4: Metal Frame with Thermal Break:Double Pane 187 0.310 58 Door 3: Glass 169 0.320 54 Wall 5: Steel Frame, 24" o.c.33 0.0 0.0 0.270 9 Wall 6: Steel Frame, 24" o.c.20 0.0 0.0 0.270 5 Wall 7: Steel Frame, 24" o.c.25 0.0 0.0 0.270 7 Wall 8: Steel Frame, 24" o.c.30 0.0 0.0 0.270 8 Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 1 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Ceiling 1 - top deck: Flat Ceiling or Scissor Truss 1,941 49.0 0.0 0.026 50 Ceiling 2: Steel Joist/Rafter, 24" o.c.:2x6 2,684 49.0 10.0 0.018 48 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 2 of 10 06/23/17Report date: Martin Zourek, M.E.06/23/2017 City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Inspection Checklist Requirements: 0.0% were addressed directly in the REScheck software REScheck Software Version 4.6.2 Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Pre-Inspection/Plan Review Plans Verified Value Field Verified Value Complies?Comments/Assumptions 103.1, 103.2 [PR1]1 Construction drawings and documentation demonstrate energy code compliance for the building envelope. Thermal envelope represented on construction documents. Complies Does Not Not Observable Not Applicable 103.1, 103.2, 403.7 [PR3]1 Construction drawings and documentation demonstrate energy code compliance for lighting and mechanical systems. Systems serving multiple dwelling units must demonstrate compliance with the IECC Commercial Provisions. Complies Does Not Not Observable Not Applicable 302.1, 403.7 [PR2]2 Heating and cooling equipment is sized per ACCA Manual S based on loads calculated per ACCA Manual J or other methods approved by the code official. Heating: Btu/hr_____ Cooling: Btu/hr_____ Heating: Btu/hr_____ Cooling: Btu/hr_____ Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 3 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Section # & Req.ID Foundation Inspection Complies?Comments/Assumptions 303.2.1 [FO11]2 A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade. Complies Does Not Not Observable Not Applicable 403.9 [FO12]2 Snow- and ice-melting system controls installed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 4 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1, 402.3.1, 402.3.3, 402.3.6, 402.5 [FR2]1 Glazing U-factor (area-weighted average). U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.3 [FR4]1 U-factors of fenestration products are determined in accordance with the NFRC test procedure or taken from the default table. Complies Does Not Not Observable Not Applicable 402.4.1.1 [FR23]1 Air barrier and thermal barrier installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable 402.4.3 [FR20]1 Fenestration that is not site built is listed and labeled as meeting AAMA /WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC 400 that do not exceed code limits. Complies Does Not Not Observable Not Applicable 402.4.5 [FR16]2 IC-rated recessed lighting fixtures sealed at housing/interior finish and labeled to indicate ≤2.0 cfm leakage at 75 Pa. Complies Does Not Not Observable Not Applicable 403.2.1 [FR12]1 Supply and return ducts in attics insulated >= R-8 where duct is >= 3 inches in diameter and >= R-6 where < 3 inches. Supply and return ducts in other portions of the building insulated >= R-6 for diameter >= 3 inches and R-4.2 for < 3 inches in diameter. Complies Does Not Not Observable Not Applicable 403.3.3.5 [FR15]3 Building cavities are not used as ducts or plenums. Complies Does Not Not Observable Not Applicable 403.4 [FR17]2 HVAC piping conveying fluids above 105 ºF or chilled fluids below 55 ºF are insulated to ≥R- 3. R-_____R-_____Complies Does Not Not Observable Not Applicable 403.4.1 [FR24]1 Protection of insulation on HVAC piping. Complies Does Not Not Observable Not Applicable 403.5.3 [FR18]2 Hot water pipes are insulated to ≥R-3. R-_____R-_____Complies Does Not Not Observable Not Applicable 403.6 [FR19]2 Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 5 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 6 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 303.1 [IN13]2 All installed insulation is labeled or the installed R-values provided. Complies Does Not Not Observable Not Applicable 402.1.1, 402.2.5, 402.2.6 [IN3]1 Wall insulation R-value. If this is a mass wall with at least ½ of the wall insulation on the wall exterior, the exterior insulation requirement applies (FR10). R-_____ Wood Mass Steel R-_____ Wood Mass Steel Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2 [IN4]1 Wall insulation is installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 7 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1, 402.2.1, 402.2.2, 402.2.6 [FI1]1 Ceiling insulation R-value.R-_____ Wood Steel R-_____ Wood Steel Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.1.1, 303.2 [FI2]1 Ceiling insulation installed per manufacturer’s instructions. Blown insulation marked every 300 ft². Complies Does Not Not Observable Not Applicable 402.2.3 [FI22]2 Vented attics with air permeable insulation include baffle adjacent to soffit and eave vents that extends over insulation. Complies Does Not Not Observable Not Applicable 402.2.4 [FI3]1 Attic access hatch and door insulation ≥R-value of the adjacent assembly. R-_____R-_____Complies Does Not Not Observable Not Applicable 402.4.1.2 [FI17]1 Blower door test @ 50 Pa. <=5 ach in Climate Zones 1-2, and <=3 ach in Climate Zones 3-8. ACH 50 =_____ACH 50 =_____Complies Does Not Not Observable Not Applicable 403.2.3 [FI4]1 Duct tightness test result of <=4 cfm/100 ft2 across the system or <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in tests, verification may need to occur during Framing Inspection. _____ cfm/100 ft2 _____ cfm/100 ft2 Complies Does Not Not Observable Not Applicable 403.3.2 [FI27]1 Ducts are pressure tested to determine air leakage with either: Rough-in test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the system including the manufacturer’s air handler enclosure if installed at time of test. Postconstruction test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer’s air handler enclosure. _____ cfm/100 ft2 _____ cfm/100 ft2 Complies Does Not Not Observable Not Applicable 403.3.2.1 [FI24]1 Air handler leakage designated by manufacturer at <=2% of design air flow. Complies Does Not Not Observable Not Applicable 403.1.1 [FI9]2 Programmable thermostats installed for control of primary heating and cooling systems and initially set by manufacturer to code specifications. Complies Does Not Not Observable Not Applicable 403.1.2 [FI10]2 Heat pump thermostat installed on heat pumps. Complies Does Not Not Observable Not Applicable 403.5.1 [FI11]2 Circulating service hot water systems have automatic or accessible manual controls. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 8 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 403.6.1 [FI25]2 All mechanical ventilation system fans not part of tested and listed HVAC equipment meet efficacy and air flow limits. Complies Does Not Not Observable Not Applicable 403.2 [FI26]2 Hot water boilers supplying heat through one- or two-pipe heating systems have outdoor setback control to lower boiler water temperature based on outdoor temperature. Complies Does Not Not Observable Not Applicable 403.5.1.1 [FI28]2 Heated water circulation systems have a circulation pump. The system return pipe is a dedicated return pipe or a cold water supply pipe. Gravity and thermos- syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. Complies Does Not Not Observable Not Applicable 403.5.1.2 [FI29]2 Electric heat trace systems comply with IEEE 515.1 or UL 515. Controls automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping. Complies Does Not Not Observable Not Applicable 403.5.2 [FI30]2 Water distribution systems that have recirculation pumps that pump water from a heated water supply pipe back to the heated water source through a cold water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104ºF. Complies Does Not Not Observable Not Applicable 403.5.4 [FI31]2 Drain water heat recovery units tested in accordance with CSA B55.1. Potable water-side pressure loss of drain water heat recovery units < 3 psi for individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. Complies Does Not Not Observable Not Applicable 403.9.1 [FI12]3 Readily accessible switch on heaters for swimming pools or permanent in-ground spas. Switch operation does not change heater thermostat setting. Heater circuit breaker is installed independent of switch. Gas-fired heaters equipped with ignition pilots that are not continuously burning pilots. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 9 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 403.9.2 [FI19]3 Timer switches or other automatic preset schedule control method are installed on heaters and pumps serving pools and permanent Complies Does Not Not Observable Not Applicable 403.9.3 [FI20]3 Outdoor heated pools and outdoor permanent spas have a vapor retardant cover. Complies Does Not Not Observable Not Applicable 404.1 [FI6]1 75% of lamps in permanent fixtures or 75% of permanent fixtures have high efficacy lamps. Does not apply to low-voltage lighting. Complies Does Not Not Observable Not Applicable 404.1.1 [FI23]3 Fuel gas lighting systems have no continuous pilot light. Complies Does Not Not Observable Not Applicable 401.3 [FI7]2 Compliance certificate posted.Complies Does Not Not Observable Not Applicable 303.3 [FI18]3 Manufacturer manuals for mechanical and water heating systems have been provided. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Hotel Lenado Data filename: P:\Current Projects\16009.00 - Hotel Lenado\Calculations\COMcheck\16009 - Lenado Residential portion envelope.rck Page 10 of 10 06/23/17Report date:City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value 31.00Above-Grade Wall 0.00Below-Grade Wall 0.00Floor 59.00Ceiling / Roof _______Ductwork (unconditioned spaces): Glass & Door Rating SHGCU-Factor 0.29Window 0.32Door Heating & Cooling Equipment Efficiency _______Heating System:_________________________ _______Cooling System:_________________________ _______Water Heater:___________________________ Name:Date: Comments City of Aspen Received 7/10/17 Building Department 12/2 0 / 2 0 1 7 nick t