HomeMy WebLinkAboutFile Documents.533 W Hallam St.0285.2018 (111).ARBK0285.2018.ARBK_533 W Hallam Page: [4] C1 Demolition Plan File Name: Civil Plans. 533 W HALLAM.pdf It appears the sanitary sewer service will be abandoned and relocated as opposed to removed and replaced as indicated on the demo plan. Civil Plans. 533 W HALLAM.pdf (10) Page: [5] C2 Site Plan File Name: Civil Plans. 533 W HALLAM.pdf Label for pervious gravel on Site Plan is illegible. Page: [5] C2 Site Plan File Name: Civil Plans. 533 W HALLAM.pdf Label Rain Garden, pervious pavers, grass buffer on Site Plan. Page: [6] C3 Utility Plan File Name: Civil Plans. 533 W HALLAM.pdf Is the new electric line routed from a transformer with adequate capacity? Show trench across the alley. Page: [6] C3 Utility Plan File Name: Civil Plans. 533 W HALLAM.pdf Specify Type K Copper for water service 10" 4" 4" 6" 8" It appears the sanitary sewer service will be abandoned and relocated as opposed to removed and replaced as indicated on the demo plan. Label for pervious gravel on Site Plan is illegible. Label Rain Garden, pervious pavers, grass buffer on Site Plan. Is the new electric line routed from a transformer with adequate capacity? Show trench across the alley. Specify Type K Copper for water service LANDSCAPE RESPONSE 2019-09-05 ENGINEERING 10/16/2019 Page: [6] C3 Utility Plan File Name: Civil Plans. 533 W HALLAM.pdf Show abandonment of existing service line at the tap. Show asphalt patches in Hallam St. Patches must meet Engineering Standards for work in the ROW. Page: [7] C4 Grading & Drainage Plan File Name: Civil Plans. 533 W HALLAM.pdf There appears to be a handful of conflicts between drainage components and tree driplines . Work with Parks Dept to resolve. Page: [7] C4 Grading & Drainage Plan File Name: Civil Plans. 533 W HALLAM.pdf Per section 4.3 of the Engineering Design Standards, Curb and Gutter needs to be replaced throughout the property. Detail shall match City of Aspen Mountable Curb Standard Detail #ENG-201 B. The detail can be found in the Engineering Design Standards. Page: [9] C6 Foundation Drainage Plan File Name: Civil Plans. 533 W HALLAM.pdf Do not see this sump and pump on the mechanical drawings. Where does this outfall? Page: [10] C7 Detail (1) File Name: Civil Plans. 533 W HALLAM.pdf Provide a detail that shows the pavers proposed on the west side of the property. Show abandonment of existing service line at the tap. Show asphalt patches in Hallam St. Patches must meet Engineering Standards for work in the ROW. There appears to be a handful of conflicts between drainage components and tree driplines . Work with Parks Dept to resolve. Per section 4.3 of the Engineering Design Standards, Curb and Gutter needs to be replaced throughout the property. Detail shall match City of Aspen Mountable Curb Standard Detail #ENG-201 B. The detail can be found in the Engineering Design Standards. Do not see this sump and pump on the mechanical drawings. Where does this outfall? Provide a detail that shows the pavers proposed on the west side of the property. 10/16/2019 Page: [1] Appendix A Basins & WQCV File Name: Drainage Report.533 W Hallam.pdf What area drains to the raingarden? This drainage map show Basin 1 routed north and the underdrain from the gravel bed routed under the rain garden. Drainage Report.533 W Hallam.pdf (12) Page: [1] Appendix A Basins & WQCV File Name: Drainage Report.533 W Hallam.pdf Show major Drainage Basins A, B, C and D on the Drainage Map. Each sub-basin should be labeled with its area and WQCV. Also show roof downspouts locations, and contours. Provide finished floor and grade at foundation elevations at all building corners or transitions. Also provide lot corner elevations and any grade break elevations critical to the grading concept. Page: [1] Appendix A Basins & WQCV File Name: Drainage Report.533 W Hallam.pdf Hatching for no infiltration gravel is different in the legend than shown on the Drainage Map. Page: 4 File Name: Drainage Report.533 W Hallam.pdf Please discuss soil types in Section 1.2 of the Drainage Report Page: 4 File Name: Drainage Report.533 W Hallam.pdf Report indicates 260 SF of pervious pavers while drainage exhibit shows 216 SF. A What area drains to the raingarden? This drainage map show Basin 1 routed north and the underdrain from the gravel bed routed under the rain garden. Show major Drainage Basins A, B, C and D on the Drainage Map. Each sub-basin should be labeled with its area and WQCV. Also show roof downspouts locations, and contours. Provide finished floor and grade at foundation elevations at all building corners or transitions. Also provide lot corner elevations and any grade break elevations critical to the grading concept. Hatching for no infiltration gravel is different in the legend than shown on the Drainage Map. ers the property. Existing peak flow ca ause detention will not be required a harging to the City of Aspen (COA) s emolish the non-historic portion of th provements include the addition of on Please discuss soil types in Section 1.2 of the Drainage Report Major Design 3 sidential development with have a footprint of 3160 square feet. The of the property, which has a footprint of 900 square feet, will be moved main intact. The main building will be located on the southern portion of th nt of 2260 square feet. lity improvements consist of 150 square feet of grass buffer, 260 square ion pervious pavers, 315 square feet of no-infiltration pervious gravel an rain gardens. The grass buffer will be located on the northern portion of ation pervious pavers will be located on the western central portion of th ation pervious gravel will be located on the eastern central portion of the located on the northeast portion of the lot. No storm water generated on oss the eastern property line onto the neighboring residential lot due to th Report indicates 260 SF of pervious pavers while drainage exhibit shows 216 SF. 10/16/2019 Page: 5 File Name: Drainage Report.533 W Hallam.pdf It appears your Word template has a broken reference in Section 3.1 of the Drainage Report. Page: 6 File Name: Drainage Report.533 W Hallam.pdf Impervious area to grass buffer ratio must be 1:1. Refer to page 8-43 of the URMP. Page: 6 File Name: Drainage Report.533 W Hallam.pdf In Table 2 the grass buffer area is omitted, however sub basin 2 utilizes a grass buffer. Page: 8 File Name: Drainage Report.533 W Hallam.pdf No rain garden is shown in basin 5. Page: 8 File Name: Drainage Report.533 W Hallam.pdf Please check all areas in the narrative for Basin C and ensure they are consistent with the rest of the Drainage Report. of the site generally between the property line and the h additional drainage from the front of the historic roof. A. This basin is 1356 square feet of which 488 square it is calculated per section 8.4.1 of the COA URMP, a r! Reference source not found.. A 150 square foot garden will be used to treat the remaining WQCV. See n of BMPs in this basin. It appears your Word template has a broken reference in Section 3.1 of the Drainage Report. towards north-east corner of the property and has a total a 4 and 254 square feet, respectively. This corresponds to 37 e sub-basin. This area is mostly a grassed area with the no uded. Storm water will be routed from the roof to a rain gard ownspouts then north to the curb and gutter on W. Hallam S at the very north-west corner of the property and has a tota 2 and 234 square feet, respectively. This corresponds to 35 e sub-basin. This area is mostly a grassed area with the no uded. Storm water will be routed from the roof to a 150 squa flow and then north to the curb and gutter on W. Hallam St. , 6, & 7) Impervious area to grass buffer ratio must be 1:1. Refer to page 8-43 of the URMP. 1356 36% 8.39 0 0 107 0.0 6.5 230.9 17% -1.7 10.13 In Table 2 the grass buffer area is omitted, however sub basin 2 utilizes a grass buffer. f the, comprised solely of sub-basin 5 buffer, rain garden and pervious pav n 5th St. This basin is 1312 square fe r, pervious pavers, and a rain garden d grass buffer is 161 square feet and A rain garden is proposed to capture ted by the reduction in effective No rain garden is shown in basin 5. gravel. Drainage and grading will allow roughly 3.6 cubic feet of untreated runoff in this basin will sheet flow into sub-basin 6, where there is excess available treatment volume provided by the no-infiltration pervious pavers. .3 Basin C (sub-basin 4) Basin C is located on the north-west side of the site and will collect runoff from the back side of the roof for the historic building and the north end of the proposed structure. Basin C consists only of sub-basins 4. Storm water will be routed from both roofed areas to no- infiltration pervious pavers and then to the curb and gutter on 5th St. This basin is 1312 square feet of which 720 square feet is impervious. Storm water runoff will be treated with 135 square feet of no-infiltration pervious pavers. Remaining WQCV is expected to be treated by the reduction in impervious area provided by a 84.7 square foot tree canopy credit. See Appendix A for the proposed location of BMPs in this basin. After water infiltrates through the gravel and enters the slot drain, it is discharged by a reverse trench drain to ensure runoff is leaving the site in the same manner it did historically. Table 4 Basin C Basin Area (sf) 796 % Impervious 33% Required WQCV (cf) 4.56 Credits Pervious Paver Area (sf) 0 Grass Buffer Area (sf) 0 Tree Canopy Credit Area (sf) 80.5 No-infiltration Paver Vol. (cf) 22.57 Rain Garden Vol. (cf) 0.0 Results Please check all areas in the narrative for Basin C and ensure they are consistent with the rest of the Drainage Report. 10/16/2019 Page: 8 File Name: Drainage Report.533 W Hallam.pdf Please check all areas in the narrative for Basin D and ensure they are consistent with the rest of the Drainage Report. Page: 20 File Name: Drainage Report.533 W Hallam.pdf Use Figure 3.3 of the URMP as opposed to Urban Drainage Tables for runoff coefficients. Page: 2 File Name: Excavation Stabilization Plan.533 W Hallam.pdf Soil nails extend in dripline and directly below trees. Verify with Parks Dept if this is permissible. Excavation Stabilization Plan.533 W Hallam.pdf (2) Page: 2 File Name: Excavation Stabilization Plan.533 W Hallam.pdf Soil nails extend below a significant tree. Verify with Parks Department this is permissible. Page: 4 File Name: Landscape Plans. 533 W HALLAM.pdf The existing gravel parking area must be removed and replaced with sod. The parking area is not permitted int he City ROW. Landscape Plans. 533 W HALLAM.pdf (3) s 33% Required WQCV (cf) 4.56 er Area (sf) 0 Area (sf) 0 Credit Area (sf) 80.5 on Paver Vol. (cf) 22.57 Vol. (cf) 0.0 pervious Area (sf) 178 mperviousness 22% cf) -19.1 Available WQCV (cf) 23.68 b-basin 5) ocated along the west-central portion of the, comprised solely of sub-basin 5. r will be routed from the roof to a grass buffer, rain garden and pervious pavers. hen sheet flow to the curb and gutter on 5th St. This basin is 1312 square feet of square feet is impervious. A grass buffer, pervious pavers, and a rain garden will treat runoff from the roof. The proposed grass buffer is 161 square feet and the ervious pavers cover 80.8 square feet. A rain garden is proposed to captured eet of runoff. Remaining WQCV is treated by the reduction in effective area provided by the 104 square foot tree canopy credit. See Appendix A for the ocation of BMPs in this basin. Please check all areas in the narrative for Basin D and ensure they are consistent with the rest of the Drainage Report. jk ,extent of property from South to North @? ;D F@HDℎ 8?B < 3_8:;DC@? ;D ?@9Dℎ 8?B jk ID < 7912.54 ID 100 ID } k, & >•kk , and 100-year storm return period runoff coefficients can e Urban Drainage and Flood Control District (UDFCD) eria Manual (USDCM) >~ 0.86Ck.^^ 0.4621 >•k 0.81C T 0.057 0.5147 >•kk 0.47C T 0.426 0.6916 ntration, =€ Use Figure 3.3 of the URMP as opposed to Urban Drainage Tables for runoff coefficients. 25' - 5 1/2" 4 PROPERTY LINE 10' SETBACK Soil nails extend in dripline and directly below trees. Verify with Parks Dept if this is permissible. L 5' SETBACK PROPERTY LINE 4' - 5 1/2" 1 " Soil nails extend below a significant tree. Verify with Parks Department this is permissible. 7915 Sod MH Gravel Alley avel Alley 2" Fence ncrete Pavers Set In Grass ac Shrub The existing gravel parking area must be removed and replaced with sod. The parking area is not permitted int he City ROW.THE EXISTING GRAVEL PARKING AREA HAS BEEN REMOVED ON ALL LANDSCAPE PLANS. 10/16/2019 Page: 4 File Name: Landscape Plans. 533 W HALLAM.pdf A raingarden is shown on the civil sheets but not the landscape plans. Verify all sheets are consistent. Page: 4 File Name: Landscape Plans. 533 W HALLAM.pdf The Civil plans show the pervious pebble section extending to the property line. The landscape plans show about half of the area pebbles and the other half creeping speedwall. The full area is used for WQCV in the civil plans. Ensure both sets align and the required area and volume is provided for WQCV. The depth of the "paver" section cannot exceed what is in the URMP. Page: 2 File Name: Shoring Plans. 533 W HALLAM.pdf Soil nails extend in tree drip lines and below tree trunks. Verify with Parks Dept this is permissible. Shoring Plans. 533 W HALLAM.pdf (1) FA DLDL DLCS Sod A raingarden is shown on the civil sheets but not the landscape plans. Verify all sheets are consistent. 791 4 CS Pervious Paver Proposed Grou Proposed Lilacs Existing Trees O Property Line Mexican Beach Pebbles For Civil's Drainage The Civil plans show the pervious pebble section extending to the property line. The landscape plans show about half of the area pebbles and the other half creeping speedwall. The full area is used for WQCV in the civil plans. Ensure both sets align and the required area and volume is provided for WQCV. The depth of the "paver" section cannot exceed what is in the URMP. 25' - 5 1/2" PROPERTY LINE Soil nails extend in tree drip lines and below tree trunks. Verify with Parks Dept this is permissible. RAINGARDEN IS SHOWN ON ALL LANDSCAPE PLANS. PLANTS HAVE BEEN REMOVED AND COORDINATED WITH CIVIL PLANS. 10/16/2019