Page: C6 GRADING AND DRAINAGE
Author: mikeh
Date: 7/30/2020 3:36:44 PM
File Name: Updated Civil Plans.1419 Crystal Lake
Rd.2019.11.pdf
How is drainage from the north
east portion patio conveyed to
the BMP? Appears to sheet flow
into green space. Detention is
required for all impervious areas.
Updated Civil Plans.1419 Crystal Lake Rd.2019.11.pdf (2)
Page: C6 GRADING AND DRAINAGE
Author: mikeh
Date: 7/30/2020 3:36:28 PM
File Name: Updated Civil Plans.1419 Crystal Lake
Rd.2019.11.pdf
How is drainage from the
southern portion of the patio
conveyed to the BMP? Appears
to sheet flow into green space.
Detention is required for all
impervious areas.
How is drainage from the north east portion
patio conveyed to the BMP? Appears to sheet
flow into green space. Detention is required for
all impervious areas.
How is drainage from the southern portion of the
patio conveyed to the BMP? Appears to sheet
flow into green space. Detention is required for all
impervious areas.