Loading...
HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0044-2020-BCHO (9)Engineering Markup Summary_Round 1 7-30-2020 Page: C6 GRADING AND DRAINAGE Author: mikeh Date: 7/30/2020 3:36:44 PM File Name: Updated Civil Plans.1419 Crystal Lake Rd.2019.11.pdf How is drainage from the north east portion patio conveyed to the BMP? Appears to sheet flow into green space. Detention is required for all impervious areas. Updated Civil Plans.1419 Crystal Lake Rd.2019.11.pdf (2) Page: C6 GRADING AND DRAINAGE Author: mikeh Date: 7/30/2020 3:36:28 PM File Name: Updated Civil Plans.1419 Crystal Lake Rd.2019.11.pdf How is drainage from the southern portion of the patio conveyed to the BMP? Appears to sheet flow into green space. Detention is required for all impervious areas. How is drainage from the north east portion patio conveyed to the BMP? Appears to sheet flow into green space. Detention is required for all impervious areas. How is drainage from the southern portion of the patio conveyed to the BMP? Appears to sheet flow into green space. Detention is required for all impervious areas.