File Name: 40.Drainage Report Stamped.20210301.pdf Call out capture volume of each
set of pervious pavers. Show the
basin area that is routed to that
specific set of pervious pavers.
Follow Chapter 8 in the URMP to
show volume based on gravel
sub base depth and 30% void
space. Deduct the area that will
be pavers set on grade in the
tree driplines.
40.Drainage Report Stamped.20210301.pdf (10)
Page: [1] 36x24Plan
File Name: 40.Drainage Report Stamped.20210301.pdf Is there a gutter or downspout
along this edge of the roof? How
is drainage routed to the
flo-well?
Page: [1] 36x24Plan
File Name: 40.Drainage Report Stamped.20210301.pdf There has been reported
drainage issues along this
property line with runoff
sheetflowing across the property
line and causing issues for the
neighbor. Verify that all runoff
will infiltrate within the pervious
paver. While using tree canopy
credits is acceptable we also
want to make sure any drainage
issue across property lines is
addressed.
Page: [1] 36x24Plan
File Name: 40.Drainage Report Stamped.20210301.pdf Where is this downspout routed?
Is there enough paver area for it
to infiltrate instead of sheet
flowing across and onto the
neighbors property?
Page: [1] 36x24Plan
File Name: 40.Drainage Report Stamped.20210301.pdf Where is this downspout routed?
It does not make it to the
pervious pavers or raingarden.
Please address and clearly show
that each downspout is routed to
a BMP.
Call out capture volume of each set of pervious pavers. Show the basin area that is routed to that specific set of pervious pavers.
Follow Chapter 8 in the URMP to show volume based on gravel sub base depth and 30% void space. Deduct the area that will be
pavers set on grade in the tree driplines.
1
Is there a gutter or downspout
along this edge of the roof?
How is drainage routed to the
flo-well?
2
1362 19.4
3
88 13.4
Basin
Area WQCV
sqft cuft
Title:
Drainage
Re
v
i
s
i
o
n
#
21
0
S
W
e
s
t
E
n
d
S
t
r
e
e
t
As
p
e
n
,
C
o
l
o
r
a
d
o
Job No.Drawn by:
Date:
File:
PE:QC:
2020-474
JAK
02.17.2021
RB
Sack-Linework-BM
RB
Da
t
e
By
:
Pe
r
m
i
t
S
e
t
Pr
o
j
e
c
t
M
i
l
e
s
t
o
n
e
:
There has been reporteddrainage issues along this
property line with runoff
sheetflowing across the
property line and causingissues for the neighbor. Verifythat all runoff will infiltrate withinthe pervious paver. While usingtree canopy credits is
acceptable we also want to
make sure any drainage issue
across property lines is
addressed.
Where is this downspout
routed? Is there enough paver
area for it to infiltrate instead of
sheet flowing across and onto
the neighbors property?
Where is this downspout
routed? It does not make it to
the pervious pavers or
raingarden. Please address and
clearly show that each
downspout is routed to a BMP.
Page: [1] 36x24Plan
File Name: 40.Drainage Report Stamped.20210301.pdf Show this walkway is treated for
WQCV. The landscape buffer
BMP is an acceptable method.
Page: [1] 36x24Plan
File Name: 40.Drainage Report Stamped.20210301.pdf The drainage report states runoff
will be treated by the pervious
pavers and any additional runoff
routed to the rain gardens. Given
the elevations of this downspout
that is not feasible. Show basins
based on the BMP they are
routed to so it can be determined
the specific BMP has capacity
for the tributary area.
Page: 10
File Name: 40.Drainage Report Stamped.20210301.pdf Show calculations for this table.
How is required and provided
WQCV being calculated?
Page: 10
File Name: 40.Drainage Report Stamped.20210301.pdf This column is the amount of
WQCV needed after accounting
for the pervious pavers and tree
canopy credits.
If I'm reading this correctly you
are saying the extra WQCV for
each basin will be routed to the
raingardens in basin 6. However
Basins 1 and most of 6 are not
routed to the raingardens.
Please address.
Page: 10
File Name: 40.Drainage Report Stamped.20210301.pdf Where is the rain garden that
treats a part of Basin 1? A rain
garden is not shown on the
plans. Is this the flow-well?
Show this walkway is treated for
WQCV. The landscape buffer
BMP is an acceptable method.
The drainage report states
runoff will be treated by the
pervious pavers and any
additional runoff routed to the
rain gardens. Given the
elevations of this downspout
that is not feasible. Show
basins based on the BMP they
are routed to so it can be
determined the specific BMP
has capacity for the tributary
area.
Input
Calculation
Sub Basin
Basin
Name Total Area
Imp.
Area
Imperv-
iousness
Req'd WQCV
(depth)
Req'd WQCV
(vol.) Decid. Area Conif. Area
Perv. Paver
Area
Rain
Garden
Vol.
Perv.
Paver
Ratio
Grass
Buffer
Ratio
Canopy
Credit
Perv. Paver
Credit
Eff. Imp.
Area
Eff. Imperv-
iousness
Eff. WQCV
(depth)
Net
WQCV
(#)(sq. ft.)(sq. ft.)(%)(in)(cu. ft.)(sq. ft.)(sq. ft.)(sq. ft.)(cu. ft.)(sq. ft.)(sq. ft.)(sq. ft.)(%)(in)(cu. ft.)
1 NE 1241 1051 85%0.188 19.4 0.0 0.00 0.0 18 2 1 0.0 0 1051 84.7%0.188 1.06
2 East 1362 1089 80%0.171 19.4 0.0 0.00 187.0 0 2 1 0.0 374 715 52.5%0.102 11.61
3 SE 1688 821 49%0.095 13.4 305.0 462.00 285.0 0 2 1 184.4 570 67 3.9%0.014 2.00
4 SW 2132 709 33%0.070 12.4 443.0 295.00 144.0 0 2 1 155.0 288 266 12.5%0.033 5.90
5 West 1516 829 55%0.106 13.5 0.0 183.00 150.0 0 2 1 54.9 300 474 31.3%0.067 8.42
6 NW 1061 676 64%0.126 11.1 0.0 154.00 99.5 37 2 1 46.2 199 431 40.6%0.082 -29.77
Total 9000 5175 58%0.8 89 748 1094 866 55.3 440 1731.0 3004 38%0.49 -0.8
Legend
Show calculations for this table.
How is required and provided
WQCV being calculated?
erv.
aver
atio
Grass
Buffer
Ratio
Canopy
Credit
Perv. Paver
Credit
Eff. Imp.
Area
Eff. Imperv-
iousness
Eff. WQCV
(depth)
Net
WQCV
(sq. ft.)(sq. ft.)(sq. ft.)(%)(in)(cu. ft.)
2 1 0.0 0 1051 84.7%0.188 1.06
2 1 0.0 374 715 52.5%0.102 11.61
2 1 184.4 570 67 3.9%0.014 2.00
2 1 155.0 288 266 12.5%0.033 5.90
2 1 54.9 300 474 31.3%0.067 8.42
2 1 46.2 199 431 40.6%0.082 -29.77
This column is the amount of
WQCV needed after accounting
for the pervious pavers and tree
canopy credits.
If I'm reading this correctly you
are saying the extra WQCV for
each basin will be routed to the
raingardens in basin 6.
However Basins 1 and most of
6 are not routed to the
raingardens. Please address.
CV
Decid. Area Conif. Area
Perv. Paver
Area
Rain
Garden
Vol.
Perv.
Paver
Ratio
Grass
Buffer
Ratio
Canopy
Credit
Perv. Pa
Cred
(sq. ft.)(sq. ft.)(sq. ft.)(cu. ft.)(sq. ft.)(sq. ft
9.4 0.0 0.00 0.0 18 2 1 0.0
9.4 0.0 0.00 187.0 0 2 1 0.0
3.4 305.0 462.00 285.0 0 2 1 184.4
2.4 443.0 295.00 144.0 0 2 1 155.0
3.5 0.0 183.00 150.0 0 2 1 54.9
Where is the rain garden that
treats a part of Basin 1? A rain
garden is not shown on the
plans. Is this the flow-well?
Page: [4] C2 Site Plan
File Name: 90.Civil Permit Set.20210301.pdf Show the Public Improvements
on the south side of the property
along Hyman Ave. Including
ramps. Verify all public
improvements meet City
Standards.
90.Civil Permit Set.20210301.pdf (19)
Page: [4] C2 Site Plan
File Name: 90.Civil Permit Set.20210301.pdf The project has triggered a
major engineering review. With
this trigger the whole site must
be brought in to compliance with
all public improvement
standards. This includes
removing the head in parking
and replacing it with parallel on
street parking. Show this on the
site plan.
Page: [4] C2 Site Plan
File Name: 90.Civil Permit Set.20210301.pdf The landscape plans call this
area out as mortar set pavers.
Clarify on the civil plans what
areas are pervious pavers and
used as a BMP and what areas
are not.
Page: [4] C2 Site Plan
File Name: 90.Civil Permit Set.20210301.pdf Call out excavation depth for the
pervious pavers in the driplines
of these trees. Verify with Parks
Dept the trees can withstand the
proposed excavation.
Page: [4] C2 Site Plan
File Name: 90.Civil Permit Set.20210301.pdf Clarify which pipes are
perforated underdrain pipes and
which are conveyance pipes.
Show the Public Improvementson the south side of theproperty along Hyman Ave.Including ramps. Verify allpublic improvements meet CityStandards.
The project has triggered amajor engineering review. Withthis trigger the whole site must
be brought in to compliancewith all public improvementstandards. This includesremoving the head in parkingand replacing it with parallel on
street parking. Show this on thesite plan.
The landscape plans call this
area out as mortar set pavers.
Clarify on the civil plans what
areas are pervious pavers and
used as a BMP and what areas
are not.
Call out excavation depth forthe pervious pavers in the
driplines of these trees. Verify
with Parks Dept the trees can
withstand the proposedexcavation.
Clarify which pipes are
perforated underdrain pipes and
which are conveyance pipes.
Page: [4] C2 Site Plan
File Name: 90.Civil Permit Set.20210301.pdf The sidewalk must be replaced
with an ADA compliant sidewalk.
The sidewalk shall be 5' in width
with a 5' landscape buffer
between the back of curb and
edge of sidewalk.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf Show that drainage is routed
from the alley to the city gutter.
What is the design of the
transition?
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf Verify no excavation will take
place on the neighbors property
to install this curb.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf the slope in this area exceeds
2:1, how will it be stabilized to
ensure no impacts to the
neighbor?
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf The curb transition needs to
happen onsite so the pan is flush
in the alley and a snow plow will
not clip this corner.
How is drainage from the east
routed to the new valleypan?
The infrastructure in the ROW
must be a public benefit and
serve the whole alley.
Demonstrate this is the case.
The sidewalk must be replaced
with an ADA compliant
sidewalk. The sidewalk shall be
5' in width with a 5' landscape
buffer between the back of curb
and edge of sidewalk.
Show that drainage is routed
from the alley to the city gutter.
What is the design of the
transition?
Verify no excavation will take
place on the neighbors property
to install this curb.
21
0
S
W
e
s
t
E
n
d
S
t
r
e
e
t
As
p
e
n
,
C
o
l
o
r
a
d
o
8
1
6
1
1
11
8
W
e
s
t
S
the slope in this area exceeds
2:1, how will it be stabilized to
ensure no impacts to the
neighbor?
The curb transition needs to
happen onsite so the pan is
flush in the alley and a snow
plow will not clip this corner.
How is drainage from the east
routed to the new valleypan?
The infrastructure in the ROW
must be a public benefit and
serve the whole alley.
Demonstrate this is the case.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf On grade pavers do not have the
pervious paver sub base to
provide WQCV volume. Show
extents of sub base and verify
there is adequate volume within
the proposed pervious pavers.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf In the drainage report address
how runoff is routed in to this
lower raingarden.
Show how the upper rain garden
overtops into the lower
raingarden.
Show enough spot elevations to
demonstrate the overflow route
of runoff above the WQCV to the
ROW.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf What extent of grading needs to
happen within the dripline of the
trees to accommodate the new
pervious paver patio? Call out
enough existing and proposed
spot elevations so that Parks
Dept can verify the patio is
acceptable within the driplines of
the trees.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf Show enough spot elevations to
demonstrate how this pipe
daylights in to the raingarden.
Re
v
i
s
i
o
n
#
Jo
Dr
D
On grade pavers do not have
the pervious paver sub base toprovide WQCV volume. Show
extents of sub base and verifythere is adequate volume within
the proposed pervious pavers.
In the drainage report address
how runoff is routed in to this
lower raingarden.
Show how the upper rain
garden overtops into the lower
raingarden.
Show enough spot elevations to
demonstrate the overflow route
of runoff above the WQCV to
the ROW.
What extent of grading needs tohappen within the dripline of thetrees to accommodate the newpervious paver patio? Call outenough existing and proposedspot elevations so that ParksDept can verify the patio is
acceptable within the driplines
of the trees.
Show enough spot elevations to
demonstrate how this pipe
daylights in to the raingarden.
Page: [5] C3 Grading Plan
File Name: 90.Civil Permit Set.20210301.pdf This concrete valleypan is not a
standard installation for an alley.
Can the alley be repaved to a
v-shaped alley to meet City alley
standards?
It is the goal of the Right of Way
program to limit unnecessary
installations in the ROW so that
there are not additional
constraints for future ROW
needs. Why is this valleypan
needed? It appears the alley
drains to the north.
All infrastructure in the ROW
should provide a public benefit.
Explain how this infrastructure
serves the whole alley.
Verify that the valleypan will not
disrupt plowing operations.
Page: [6] C4 Drainage Plan
File Name: 90.Civil Permit Set.20210301.pdf Call out volume capacity of each
individual BMP. Call out area
that is tributary to that individual
BMP. Clearly show that the BMP
has adequate volume for the
area that is draining to it.
Page: [9] C7 Civil Details
File Name: 90.Civil Permit Set.20210301.pdf Provide a spec of the sand set
Tao Grey Pavers with DG gaps.
Demonstrate these pavers meet
the standards of the pervious
pavers in Chapter 8 of the
URMP.
Page: [9] C7 Civil Details
File Name: 90.Civil Permit Set.20210301.pdf Ful infiltration pervious pavers
are called out on the plan view.
Provide a detail.
This concrete valleypan is not a standard installation for
an alley. Can the alley be repaved to a v-shaped alley
to meet City alley standards?
It is the goal of the Right of Way program to limit
unnecessary installations in the ROW so that there are
not additional constraints for future ROW needs. Why is
this valleypan needed? It appears the alley drains to the
north.
All infrastructure in the ROW should provide a public
benefit. Explain how this infrastructure serves the whole
alley.
Verify that the valleypan will not disrupt plowing
operations.
Call out volume capacity of
each individual BMP. Call out
area that is tributary to that
individual BMP. Clearly show
that the BMP has adequate
volume for the area that is
draining to it.
Provide a spec of the sand set Tao Grey Pavers with DG gaps. Demonstrate
these pavers meet the standards of the pervious pavers in Chapter 8 of the
URMP.
Ful infiltration pervious pavers are called out on the plan view. Provide a detail.
Page: [9] C7 Civil Details
File Name: 90.Civil Permit Set.20210301.pdf Call out on the site plan where
snowmelted pervious pavers are
proposed.
Page: [1] L1.0
File Name: 90.Landscape Plan.20210301.pdf Show raingardens and
appropriate rain garden
plantings on the landscape
sheets.
90.Landscape Plan.20210301.pdf (6)
Page: [1] L1.0
File Name: 90.Landscape Plan.20210301.pdf What is this wall? It is not shown
on the Civil grading plan. Is it
existing or proposed?
Page: [1] L1.0
File Name: 90.Landscape Plan.20210301.pdf Civil plans call out an asphalt
alley. landscape plans call out a
gravel alley.
Page: [1] L1.0
File Name: 90.Landscape Plan.20210301.pdf Irrigation will be needed in the
new landscape buffer along
West End St.
Call out on the site plan where
snowmelted pervious pavers
are proposed.
ADU
B
Show raingardens and
appropriate rain garden
plantings on the landscape
sheets.
GARAGE
SWEDISH (NARROW) ASPENS FOR
WINDOW AND SECOND STORY
SCREENING
SAND-SET ANTIQUE GRANITE
PAVERS
What is this wall? It is not
shown on the Civil grading plan.
Is it existing or proposed?
CONCRETE GARAGE APRON
TIE INTO GRAVEL ALLEY
Civil plans call out an asphalt
alley. landscape plans call out
a gravel alley.
EXCEED 30" IN
HEIGHT
Irrigation will be needed in the
new landscape buffer along
West End St.
Page: [1] L1.0
File Name: 90.Landscape Plan.20210301.pdf The civil plans call out the patios
as pervious pavers. The
landscape plans call the patios
out as sandset pavers. Please
make all sheets consistent. If the
patios are to be used as
stormwater treatment areas
sandset pavers do not meet the
standards of the URMP. Please
address.
Page: [1] L1.0
File Name: 90.Landscape Plan.20210301.pdf Demonstrate the TAO Grey
Pavers with planted gaps meet
the pervious paver specs of the
Urban Runoff Management Plan.
SAND-SET TAO GRAY PAVERS WITH DG
GAPS
SHRUB SCREEN
NON-IRRIGATED DG CRUSHER FINES
OR HIGH AGAINST THE BASE OF TRU
50% SOIL PEP / 50% SMALL NUGGET.
10. VERIFY LOCATIONS OF PERTINEN
SECTIONS. IF ANY PART OF THIS PLA
CONTACT LANDSCAPE ARCHITECT F
11. ANY DISTURBANCE UNDER EXIST
OF THE CITY FORESTER PRIOR TO C
EXISTING TREES; NO HEAVY EQUIPM
1 - TOPSOIL OF IRRIGATED GRASSE
TURF), SHRUBS, PERENNIALS, AND
DEPTH OF AT LEAST 6 INCHES (6”) C
LEAST 5 PERCENT (5%) ORGANIC M
2 - TREE SOIL SHOULD HAVE A MIN
AND SUBSOIL LAYERS SHALL BE SA
LEAST 6 INCHES (6”) AND HAVE 5 PE
AND SUBSOIL SHALL HAVE AT LEAS
MATTER BY WEIGHT.
3 - A MINIMUM OF FOUR (4) CUBIC Y
AMENDMENT PER ONE-THOUSAND
BE REQUIRED AS NECESSARY TO M
SPECIFICATION.
4 - SOIL AMENDMENT ORGANIC MA
CLASS II COMPOST.
SOIL AND MULCH
The civil plans call out the
patios as pervious pavers. The
landscape plans call the patios
out as sandset pavers. Please
make all sheets consistent. If
the patios are to be used as
stormwater treatment areas
sandset pavers do not meet the
standards of the URMP. Please
address.
U
P
MASTER
MORTAR SET TAO GRAY PAVING - 110 SF
SAND-SET TAO GRAY PAVERS WITH
PLANTED GAPS
Demonstrate the TAO Grey
Pavers with planted gaps meet
the pervious paver specs of the
Urban Runoff Management
Plan.