Loading...
HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (42).ACBKCOMcheck Software Version 4.0.7.1 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 200 S Aspen St Aspen, CO 81611 Owner/Agent:Designer/Contractor: Aaron Humphrey Alpenglow Lighting Design, Inc 4341 CR 113 Carbondale, CO 81623 970-948-2637 aaron@alpenglowinc.com Project Information Energy Code: Hotel Lenado Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Hotel 18425 0.78 14427 14427Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures 1-Hotel LED 1: L1: RECESSED DOWNLIGHT: LED Other Fixture Unit 16W:1 160 18 2880 LED 1 copy 1: L1: RECESSED DOWNLIGHT: LED Other Fixture Unit 16W:1 45 18 Exempt Exemption:Sleeping Unit Lighting LED 3: L3: RECESSED SHOWER LIGHT: LED Other Fixture Unit 13W:1 9 12 108 LED 5: L5: LINEAR LED COVE/UNDERCAB SYSTEM: LED Other Fixture Unit 103W:1 3 100 300 LED 6: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 22 100 2200 LED 6 copy 2: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 28 60 Exempt Exemption:Sleeping Unit Lighting LED 6 copy 1: L5A: LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 19 60 Exempt Exemption:Furniture-mounted Supplemental Task Lighting LED 7: L6: 6" SURFACE SHALLOW: LED Other Fixture Unit 13W:1 14 14 Exempt Exemption:Sleeping Unit Lighting LED 8: L7: LED LINEAR LED COVE SYSTEM: LED Other Fixture Unit 103W:1 10 60 Exempt Exemption:Sleeping Unit Lighting LED 10: L9: 9" SURFACE SHALLOW: LED Other Fixture Unit 16W:1 55 17 935 LED 11: L10: ELEVATOR PIT LIGHT: LED Other Fixture Unit 40W:1 3 32 96 LED 12: L11: LINEAR INDUSTRIAL: LED Other Fixture Unit 40W:1 21 43 903 LED 13: L12: ADA SCONCE: LED Other Fixture Unit 46W:1 6 25 150 LED 14: L13: STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 28W:1 1 30 30 LED 15: L14: LINER SLOT (PER FOOT): LED Linear 8W:1 80 7 560 Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 91 ofPage 11/27/17 12/19 / 2 0 1 7 nickt E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures LED 17: L15A: DECORATIVE PENDANT: LED Other Fixture Unit 125W:1 1 160 160 LED 19 copy 1: L16: downlight: LED Other Fixture Unit 16W:1 43 10 430 LED 19: L17: DECORATIVE PENDANT: LED Other Fixture Unit 16W:1 5 50 250 LED 20: L18: FLOOR LAMP: LED Other Fixture Unit 16W:1 10 18 180 LED 21: L19: MINI BOLLARD: LED Other Fixture Unit 6.5W:1 5 9 45 LED 22: L20: READING LIGHT: LED Other Fixture Unit 13W:1 24 9 Exempt Exemption:Sleeping Unit Lighting LED 23: L21: DOWNLIGHT: LED Other Fixture Unit 28W:1 4 2 6 LED 24: L22: DECORATIVE: LED Other Fixture Unit 16W:1 6 10 60 LED 26: L24: LED TAPE: LED Other Fixture Unit 13W:1 8 50 Exempt Exemption:Sleeping Unit Lighting LED 27: L25: PENDANT: LED Other Fixture Unit 13W:1 2 30 60 LED 30: D: DECORATIVE: LED A Lamp 13W:1 28 14 392 LED 30: X1: EXIT: LED Other Fixture Unit 6.5W:1 18 6 Exempt Exemption:Exit Signs, Safety or Emergency Lighting 9745Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES: Design 32% better than code Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 92 ofPage Aaron J. Humphrey, President 11/09/17 11/27/17 12/19 / 2 0 1 7 nickt COMcheck Software Version 4.0.7.1 Exterior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 200 S Aspen St Aspen, CO 81611 Owner/Agent:Designer/Contractor: Aaron Humphrey Alpenglow Lighting Design, Inc 4341 CR 113 Carbondale, CO 81623 970-948-2637 aaron@alpenglowinc.com Project Information Energy Code: Hotel Lenado 2 (Neighborhood business district)Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / Unit D Tradable Wattage E Allowed Watts (B X C) SIDEWALK (Walkway < 10 feet wide)2590 ft of 0.7 Yes 1813 ROOF DECK (Special feature area)1445 ft2 0.14 Yes 202 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 2015 2015 600 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures SIDEWALK ( Walkway < 10 feet wide 2590 ft of walkway length): Tradable Wattage LED 1: L13: LED STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 46W:1 1 30 30 LED 5: L21: FRAME LIGHT (POWER SUPPLY): LED Other Fixture Unit 103W:1 7 100 700 LED 6: L2: RECESSED DOWNLIGTH: LED Other Fixture Unit 6.5W:1 1 12 12 LED 7: L23: SCONCE: LED Other Fixture Unit 95W:1 3 100 300 ROOF DECK ( Special feature area 1445 ft2): Tradable Wattage LED 1 copy 1: L13: LED STEPLIGHT (POWER SUPPLY): LED Other Fixture Unit 46W:1 1 30 30 LED 3: L18: FLOOR LAMP: LED Other Fixture Unit 16W:1 6 18 108 LED 4: L19: MINI BOLLARD: LED Other Fixture Unit 6.5W:1 2 9 18 1198Total Tradable Proposed Watts = Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 93 ofPage 11/27/17 12/19 / 2 0 1 7 nickt Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES: Design 54% better than code Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 94 ofPage Aaron J. Humphrey, President 11/09/17 11/27/17 12/19 / 2 0 1 7 nickt Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.7.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 95 ofPage X X X 11/27/17 12/19 / 2 0 1 7 nickt Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Exception: Lighting that is related to means of egress in stairways, ramps, corridors, or emergency routes. C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Exception: Lighting controlled by occupancy sensors. C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.5 [EL25]null Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 96 ofPage X X X X X X X X X X X 11/27/17 12/19 / 2 0 1 7 nickt 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 97 ofPage 11/27/17 12/19 / 2 0 1 7 nickt Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C405.5.1 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 98 ofPage X X X X X 11/09/17 Comments/Revisions: 1. Removed egress lighting exemption from interior common space fixtures. 2. Revised interior fixture counts to remove fixtures from AHU residential units. 3. Revised interior exemptions for sleeping unit lighting. 4. Moved certain exterior fixtures previously exempted as egress lighting on interior count to exterior count. 11/27/17 12/19 / 2 0 1 7 nickt Project Title: Data filename: Hotel Lenado C:\Users\stock\CloudStation\Active Projects\Forum Phi\200 S. Aspen St\Design\Calcs\Hotel Lenado Lighting 110717.cck 11/09/17Report date: 99 ofPage 11/27/17 12/19 / 2 0 1 7 nickt