Loading...
HomeMy WebLinkAboutFile Documents.520 S Riverside Ave.0182.2019 (4).ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ Commerical MultiͲ&amily Single &amily Use of Building Class of Work New Addition Alteration Repair ________ Yes No Will there be any roofͬwall penetrations͍ NOTICE: This permit becomes null and void if work or construction authorinjed is not commenced within ϭϴϬ days, or if construction or work is suspended or abandoned for a period of ϭϴϬ days at any time aŌer work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) MidžedͲUse IFFR Tenant Finish Demolition Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%) CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County Use Tax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____>avatory (tash Basin) ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ____>aundry Bar, Utility Sink ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Eĸciency Approved To Issue Issuance Date ApprovedReviewingDepartment Reviewer SiŐn-Oī NEW SQ FT Proũect saluation: Cost of project as defined in saluation Affadavit. SƋ Ft oĨ uildinŐ tork rea: Total square footage of interior area undergoing change or reconfiguration. hnit SƋ Ft: 'ross square footage, not &AR, of permitted unit. >ot Sinje: Total surveyed square footage of property. SƋ Ft oĨ Soil Disturďance: Exterior area of the lot where the ground is disturbed New SƋ Ft: Total added square footage for additions to net livable or net leasable space. uildinŐ Footprint: 'rade Ňoor square footage of the permitted structure. ,ardscape rea: Square footage of impervious lot surface. one District: Underlying njone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review • Projects involving less than 50% hardscape area and work affecting ϳϱй or greater of unit sq Ō • Projects involving greater than 50% hardscape area and work affecting ϱϬй or greater of unit sq Ō • Projects involving ϭ,ϬϬϬн sq Ō of soil disturbance area tater Eĸcient >andscapinŐ • Projects that trigger a major engineering review • Projects involving interior alterations affecting ϱϬй or more of edžisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 07/20/2019 0182.2019.ARBK DAM 8/14/19