HomeMy WebLinkAboutFile Documents.503 N 4th St.0074.2017 (10).ARBKPROJECT ADDRESS:503 North 4th Street
Aspen, CO 81611
2.0 PROJECT INTRODUCTION
2.1 DISTURBANCE AREA
2.2 LOCATION
2.3 DESCRIPTION
3.0 PROJECT DOCUMENTATION
3.1 PERMITS / OTHER DOCUMENTS
3.2 PUBLIC NOTIFICATION
3.3 PROJECT SIGN
3.4 CONTACT DESIGNATION
4.0 PROJECT IMPLEMENTATION
4.1 DATES OF CONSTRUCTION
4.2 HOURS OF CONSTRUCTION
4.3 PHASING OF CONSTRUCTION
4.4 ADJOINING PROPERTY OWNERS
4.5 PROJECT FENCING
4.6 PUBLIC HEALTH AND WELFARE
4.7 NATURAL ENVIRONMENT
5.0 PARKING MANAGEMENT
5.1 PARKING MANAGEMENT FORM
5.2 EMERGENCY VEHICLE ACCESS
5.3 CONSTRUCTION PARKING DETAILS
5.4 STAGING AREAS Not needed. Staging for material in garage
Not Applicable, no outside work in scope
CMP will be followed to maintain the standards and requirements outlined.
Parking permits will not be needed. Limited subcontractors onsite each day and will use
exist. driveway and garage
Access will be maintained at all times.
Parking permits will not be needed. Limited subcontractors onsite each day.
Directory of contacts on a separate document. All key personnel and emergency
numbers included and available on site.
Project commencement planned for May, 2017
M-F 7:30AM-5:30PM, Saturday 9-5, and no work Sundays and Holidays
All work completed before August, 2017
Requirements understood. No impact or endangerment.
Roughly 1,572 of interior space only sq.ft.
See vicinity map on plans
Interior renovation
N/A
Include all permits / inspections with the Permit Set of Plans. Copies of all Ordinances
included with the CMP
Completed.
Completed.
1
City of Aspen
Received
5/2/17
Building Department
0074.2017.ARBK
5.5 TRAILER, MATERIALS, TEMP
FACILITIES
6.0 TRAFFIC CONTROL
6.1 GENERAL
6.2 HAUL ROUTES
6.3 ONSITE VEHICLE LIMITATIONS
6.4 DELIVERY REQUIREMENTS
6.5 TRAFFIC CONTROL PLAN
7.0 PEDESTRIAN PROTECTION
7.1 GENERAL
8.0 SEDIMENT AND EROSION CONTROL
8.1 REQUIREMENTS
8.2 SMUGGLER MT RESTRICTIONS
9.0 FUGITIVE DUST CONTROL
9.1 DUST CONTROL PLAN N/A
9.2 REQUIREMENTS
10.0 EMISSIONS
10.1 GENERAL
10.2 EMISSIONS FROM DIESEL ENGINES
11.0 NOISE SUPPRESSION
11.1 GENERAL
11.2 NOISE SUPPRESSION PLAN
11.3 REQUIREMENTS
11.4 SPECIFIC RESTRICTIONS
12.0 ENFORCEMENT
12.1 CONSTRUCTION MITIGATION
OFFICER
12.2 CORRECTIVE ACTION
12.3 INSPECTION REPORTS
no outdoor temp facilities are needed.
Not req.
N/A
Construction workers will commute and carpool in the work trucks, none of which are
larger than typical 2 axle trucks.
No more than 1 delivery vehicle will be scheduled at a time. Deliveries will be pre-
scheduled.
N/A- due to low volume and work location.
May not be applicable- no pedestrian corridor / sidewalks.
N/A
N/A
N/A
N/A
N/A
Exterior noise at the lot line shall be kept below 80 decibels.
Read and acknowledged
Proper suppression will be implemented on all equipment.
Timing requirements understood.
No manufacturing will take place.
Read and acknowledged
Read and acknowledged
2
City of Aspen
Received
5/2/17