HomeMy WebLinkAboutFile Documents.503 N 4th St.0074.2017 (10).ARBKPROJECT ADDRESS:503 North 4th Street Aspen, CO 81611 2.0 PROJECT INTRODUCTION 2.1 DISTURBANCE AREA 2.2 LOCATION 2.3 DESCRIPTION 3.0 PROJECT DOCUMENTATION 3.1 PERMITS / OTHER DOCUMENTS 3.2 PUBLIC NOTIFICATION 3.3 PROJECT SIGN 3.4 CONTACT DESIGNATION 4.0 PROJECT IMPLEMENTATION 4.1 DATES OF CONSTRUCTION 4.2 HOURS OF CONSTRUCTION 4.3 PHASING OF CONSTRUCTION 4.4 ADJOINING PROPERTY OWNERS 4.5 PROJECT FENCING 4.6 PUBLIC HEALTH AND WELFARE 4.7 NATURAL ENVIRONMENT 5.0 PARKING MANAGEMENT 5.1 PARKING MANAGEMENT FORM 5.2 EMERGENCY VEHICLE ACCESS 5.3 CONSTRUCTION PARKING DETAILS 5.4 STAGING AREAS Not needed. Staging for material in garage Not Applicable, no outside work in scope CMP will be followed to maintain the standards and requirements outlined. Parking permits will not be needed. Limited subcontractors onsite each day and will use exist. driveway and garage Access will be maintained at all times. Parking permits will not be needed. Limited subcontractors onsite each day. Directory of contacts on a separate document. All key personnel and emergency numbers included and available on site. Project commencement planned for May, 2017 M-F 7:30AM-5:30PM, Saturday 9-5, and no work Sundays and Holidays All work completed before August, 2017 Requirements understood. No impact or endangerment. Roughly 1,572 of interior space only sq.ft. See vicinity map on plans Interior renovation N/A Include all permits / inspections with the Permit Set of Plans. Copies of all Ordinances included with the CMP Completed. Completed. 1 City of Aspen Received 5/2/17 Building Department 0074.2017.ARBK 5.5 TRAILER, MATERIALS, TEMP FACILITIES 6.0 TRAFFIC CONTROL 6.1 GENERAL 6.2 HAUL ROUTES 6.3 ONSITE VEHICLE LIMITATIONS 6.4 DELIVERY REQUIREMENTS 6.5 TRAFFIC CONTROL PLAN 7.0 PEDESTRIAN PROTECTION 7.1 GENERAL 8.0 SEDIMENT AND EROSION CONTROL 8.1 REQUIREMENTS 8.2 SMUGGLER MT RESTRICTIONS 9.0 FUGITIVE DUST CONTROL 9.1 DUST CONTROL PLAN N/A 9.2 REQUIREMENTS 10.0 EMISSIONS 10.1 GENERAL 10.2 EMISSIONS FROM DIESEL ENGINES 11.0 NOISE SUPPRESSION 11.1 GENERAL 11.2 NOISE SUPPRESSION PLAN 11.3 REQUIREMENTS 11.4 SPECIFIC RESTRICTIONS 12.0 ENFORCEMENT 12.1 CONSTRUCTION MITIGATION OFFICER 12.2 CORRECTIVE ACTION 12.3 INSPECTION REPORTS no outdoor temp facilities are needed. Not req. N/A Construction workers will commute and carpool in the work trucks, none of which are larger than typical 2 axle trucks. No more than 1 delivery vehicle will be scheduled at a time. Deliveries will be pre- scheduled. N/A- due to low volume and work location. May not be applicable- no pedestrian corridor / sidewalks. N/A N/A N/A N/A N/A Exterior noise at the lot line shall be kept below 80 decibels. Read and acknowledged Proper suppression will be implemented on all equipment. Timing requirements understood. No manufacturing will take place. Read and acknowledged Read and acknowledged 2 City of Aspen Received 5/2/17 Building Department