HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (53).ACBK Parks Department Comments
Date: May 25, 2017
Permit# 0007.2016.ACBK
From: David Radeck, Permit Tech, City of Aspen, Phone 970‐429‐2025, david.radeck@cityofaspen.com
1. New Civils showing details and cross sections of the east sidewalk where it abuts the Parks
property.
This has been provided in the Civil Set.
2. 30” of good soil in planting strip between curb and sidewalk for new trees.
This note has been added to Sheet L2.0.
3. 2” maximum excavation for sidewalk along Hopkins in existing driplines of trees and there is
to be no cutting of any roots that are 2” or larger without the consent of the City Forester.
This note has been added to Sheet L2.0.
City of Aspen
Received
6/27/17
Building Department