Loading...
HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (53).ACBK                               Parks Department Comments    Date: May 25, 2017      Permit# 0007.2016.ACBK  From: David Radeck, Permit Tech, City of Aspen, Phone 970‐429‐2025, david.radeck@cityofaspen.com      1. New Civils showing details and cross sections of the east sidewalk where it abuts the Parks  property.  This has been provided in the Civil Set.   2. 30” of good soil in planting strip between curb and sidewalk for new trees.  This note has been added to Sheet L2.0.   3. 2” maximum excavation for sidewalk along Hopkins in existing driplines of trees and there is  to be no cutting of any roots that are 2” or larger without the consent of the City Forester.  This note has been added to Sheet L2.0.     City of Aspen Received 6/27/17 Building Department