HomeMy WebLinkAboutFile Documents.533 W Hallam St.0285.2018 (127).ARBKParks Markup Summary 2
Page: [4] C1 Demolition Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
Use existing post holes for future
fence
[4] C1 Demolition Plan (5)
Page: [4] C1 Demolition Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
abandon existing water line in
place.
Page: [4] C1 Demolition Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
Carefully remove all existing
pavers and structures in
driplines of trees
Page: [4] C1 Demolition Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
Use existing post holes for future
fence
Page: [4] C1 Demolition Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
carefully remove valve boxes
from driplines of trees and
abandon piping in place
18"
20"
Use existing post holes
for future fence
"
2"
R
#
Job No.
Drawn by:
Date:
File:
QC:
abandon existing water
line in place.
12"18"
20"
10"
4"8"
8"
30"
Carefully remove all
existing pavers and
structures in driplines
of trees
3"
2"
6"
18"
12"
12"
8"
Use existing post holes
for future fence
20"
carefully remove valve
boxes from driplines of
trees and abandon
piping in place
Page: [6] C3 Utility Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
Air spading required at limits that
were put forth by City Forester
for micro-pile walss and soil
nailing.
[6] C3 Utility Plan (1)
Page: [7] C4 Grading & Drainage Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
move 4" underdrain from dripline
of tree.
[7] C4 Grading & Drainage Plan (2)
Page: [7] C4 Grading & Drainage Plan
Author: davidr
File Name: Civil Plans. 533 W HALLAM.pdf
move 8' trench drain and 4"
underdrain from driplines of tree.
Air spading required at
limits that were put
forth by City Forester
for micro-pile walss
and soil nailing.
move 4" underdrain
from dripline of tree.
move 8' trench drain
and 4" underdrain
from driplines of tree.