HomeMy WebLinkAboutFile Documents.183 Red Mountain Rd.0038.2018 (67).ARBKParks Markup Summary
Page: 3
Author: davidr
File Name: Civil Set.183 Red Mtn Rd.2018.01.pdf
Utilities must not go through this
area as it will impact tree roots.
A better route would be through
the elevated driveway where a 7'
trench could occur without
impacting tree roots.
3 (3)
Page: 3
Author: davidr
File Name: Civil Set.183 Red Mtn Rd.2018.01.pdf
This access for utilities is Parks
choice to lessen impacts to tree
roots.
Page: 3
Author: davidr
File Name: Civil Set.183 Red Mtn Rd.2018.01.pdf
Impacts to native vegetation will
require approval of City Forester.
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
this needs to be called out as
City of Aspen seed mixes.....
5 (7)
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
See Tree Removal Permit for
specific requirements for this
project. This tree removal permit
must be posted on site and
available during inspections.
XW
L
XW
L
XW
L
XW
L
XW
L
XGA
S
XG
A
S
XG
A
S
XG
A
S
XGA
S
XG
A
S
XG
A
S
XGA
S
XGA
S
XGA
S
XGA
S
XG
A
S
XG
A
S
XGA
S
XG
A
S
XGA
S
XG
A
S
XGA
S
XGA
S
XG
A
S
X
fo
fo
fo
fo
fo
fo
fo
XUT
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XUT
XU
T
XGA
S
XGA
S
XG
A
S
XG
A
S
PROPOSED UTILITIES.
SEE SHEET 5.0
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
CONTRACTOR TO SAW
CUT EXISTING ASPHALT
AND REPLACE IN KIND
PER COA STANDARDS.
CONTRACTOR TO SAW
CUT EXISTING CURB &GUTTER AND REPLACEIN KIND.STAIRS. SEELANDSCAPE
ARCHITECTS PLANS.E
EXISTINGCARPORT TOREMAIN
OPRIS ESNGINEERING
CIVIL CONSULTANTS
14237.0 JOB NO.
DATE:02-21-
502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313
DESIGNED BY
DRAWN BY
CHECKED BY
JPS 06/2
JPS
NA
CA
N
O
P
Y
H
O
U
S
E
83
R
E
D
M
O
U
N
T
A
I
N
R
O
A
D
TY
O
F
A
S
P
E
N
,
C
O
L
O
R
A
D
O
BU
I
L
D
I
N
G
P
E
R
M
I
T
06/2
07/0
Utilities must not go
through this area as it
will impact tree roots.
A better route would
be through the
elevated driveway
where a 7' trench
could occur without
impacting tree roots.
XW
L
XW
L
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
XGAS
XGAS
XGAS
fo
fo
fo
fo
fo
fo
fo
f
o
f
o
X
U
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
X
x
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
PROPOSED MOUNTABLECURB. SEE SHEET C8.0
FOR DETAILS
HEATED CONCRETE. SEEMECHANICAL ENGINEERSPLANS FOR DETAIL
FFE: 7850.25'
START VERTICAL CURB. SEE
DETAIL ON SHEET C8.0
MATCH EXISTING CURB
6' WIDE SIDEWALK.
HANDICAP RAMP PER COA
STANDARDSRE-GRADE AND RE-VEG AREA
TO MATCH PROPOSED
SIDEWALK
PROPOSED MOUNTABLECURB. SEE SHEET C8.0FOR DETAILS
CONTRACTOR TO SAW
CUT EXISTING ASPHALT
AND REPLACE IN KINDPER COA STANDARDS.
DA
02/2
TITL
This access for utilities
is Parks choice to
lessen impacts to tree
roots.
GA
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
AS
XG
A
S
XG
A
S
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
x x x x x
PROPOSED MOUNTABLE
CURB. SEE SHEET C8.0
FOR DETAILS
PROPOSED ELEVATED
AUTOCOURT ELEV: 7850.19. SEE
STRUCTURAL ENGINEERS PLAN
FOR DETAILS.
START VERTICAL CURB. SEE
DETAIL ON SHEET C8.0
6' WIDE SIDEWALK.
SHADY
L
A
N
E
HANDICAP RAMP PER COA
STANDARDSRE-GRADE AND RE-VEG AREA
TO MATCH PROPOSED
SIDEWALK
PROPOSED MOUNTABLE
CURB. SEE SHEET C8.0
FOR DETAILS
CONTRACTOR TO SA
CUT EXISTING ASPHA
AND REPLACE IN KIN
PER COA STANDARD
Impacts to native
vegetation will require
approval of City
Forester.
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
sp
prope
r
t
y
line
pr
o
p
e
r
t
y
l
i
n
e
h u n t e r c r e e k
rio
grande
trailpedestrian
bridge
de
fire place
flood hazard line
tree
pro
t
e
c
t
i
o
n
zo
n
e
12 Aspen Populus tremuloides 5" cal.single stem
10 Cottonwood Populus angustifolia 4" cal.
SHRUBS:
tbd various 5 gal.
PERENNIALS:
580 s.f.various 1 gal.Hydrozone B (medium)
GROUNDCOVERS:
1,288 s.f. Lawn Sod (tbd)Hydrozone C (high)
10,467 s.f. Native Grasses Seed Hydrozone A (low)
Note: All areas disturbed and not otherwise noted, to be re-seeded with Pitkin County 'non-irrigated mix'. Areas
within 15' setback from stream to be revegetated with Pitkin County 'mountain meadow mix'.
this needs to be called
out as City of Aspen
seed mixes.....
See Tree Removal
Permit for specific
requirements for this
project. This tree
removal permit must
be posted on site and
available during
inspections.
SE Response: The proposed gas and water
service lines have been rerouted to the south side
of the driveway; please re. to Civil Sheet C-4.0
SE Response: The proposed gas and water
service lines have been rerouted to the south side
of the driveway; please re. to Civil Sheet C-5.0
SE Response: A note has been added to Civil
Sheet C-5.0 that instructs the contractor to
coordinate with City of Aspen Parks Department on
removal of existing vegetation to accommodate
proposed sidewalk
Seed mixes are detailed on
sheet L2.05, including a
revised planting plan.
Note on landscape drawing
L2.05 for vegetation review
City of Aspen Forester prior
to
construction of sidewalk.
Tree removal permit to be
posted on site, with specific
project requirements
included.
02/13/2019
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
Call 970-920-5120 for inspection
of this tree protection fencing
PRIOR to any Activity.
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
change this to read: Tree
protection fencing must be
installed at the tree dripline.
Tree dripline is measured by
taking the longest branch and
drawing a circle around the trunk
of the tree.
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
all trees planted in the Top of
Slope area will require approval
of the City of Aspen Forester.
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
ENG is calling for sidewalk in
this area along with a 5' planting
strip along new curb
Page: 5
Author: davidr
File Name: Landscape Set.183 Red Mtn Rd.2018.01.pdf
Distance from trunks of trees will
need to be determined by City
Forester.
T
Tree Protection Zone
- no dumping, storing of materials, etc
- fencing a min. of 30 inches from
existing trees
Proposed Trees (typ.)
- 3' of sandy loam tree soil
- 6" of sandy loam topsoil with 5%
organic matter
Call 970-920-5120 for
inspection of this tree
protection fencing
PRIOR to any Activity.
T
Tree Protection Zone
- no dumping, storing of materials, etc
- fencing a min. of 30 inches from
existing trees
Proposed Trees (typ.)
- 3' of sandy loam tree soil
- 6" of sandy loam topsoil with 5%
change this to read:
Tree protection
fencing must be
installed at the tree
dripline. Tree dripline
is measured by taking
the longest branch
and drawing a circle
around the trunk of the
tree.
S
T
G
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
DN
existing carport(to remain)
proposed residence
spa
property line
prope
r
t
y
line
pro
p
e
r
t
y
li
n
e
property line
pr
o
p
e
r
t
y
li
n
e
proposed access / elevated driveway
r e
d
m
o
u
n t a
i n
r o
a
d
h u n t e r c r e e k
h u n t e r c r e e k
h u n t e r c r e e k
riograndetrailpedestrianbridge
s h a d y
pedestrian access to Red Mtn Rd.
exterior walkway
exterior walkway
garage
entry
top of bank
15' top of bank setback
setback
15
'
s
e
t
b
a
c
k
25
'
se
t
b
a
c
k
lawn
native grasses
native grasses
perennial beds
pool
deck
lawndeck
patio
patio
fire place
native grasses
address mo
flood
haza
r
d
line
flood hazard line
tree protection zone
tree protection zonetree protection zone10' setback
tree prote
c
t
i
o
n
zone
Tree Protection Zone- no dumping, storing of materials, etc- fencing a min. of 30 inches fromexisting trees
Proposed Trees (typ.)- 3' of sandy loam tree soil - 6" of sandy loam topsoil with 5% organic matter (Class I or II compost)- subsoil layers to contain 1 - 3% organic matter (Class I or II compost)
Topsoil in all revegetated ares to include 6" of sandy loam, with 5% organic material (Class I or !! compost)
Hydrozone A - low (native grasses)
Hydrozone B - medium (ornamental perennial plantings)
Hydrozone C - CST / Cool Season Turf
Irrigation Controller
Native Grasses (hydrozone A)- subsoil shall have a min. of 1-3% of organic matter of Class 1 or 2 compost
Bio-Retention Swale - see civil for more details
I have complied with the criteria of the Water Efficient Landscaping Standards and applied them for the efficient use of water in the landscape design plan.
Amy Capron Barrow, PLA, ASLAPrincipal
Land Design 39
PLANTING LEGEND:
symbol quantity common name scientific name size notesEVERGREEN TREES: 4 Colorado Blue Picea pungens 14' B&B full shapeSpruce
5 Colorado Blue Picea pungens 16' B&B full shapeSpruce
3 Subalpine Fir Pinus aristata 10' B&B full shape
5 Subalpine Fir Pinus aristata 12' B&B full shape
DECIDUOUS TREES:
8 Aspen Populus tremuloides 3" cal.single stem
12 Aspen Populus tremuloides 5" cal.single stem
10 Cottonwood Populus angustifolia 4" cal.
SHRUBS: tbd various 5 gal.
PERENNIALS: 580 s.f.various 1 gal.Hydrozone B (medium) GROUNDCOVERS: 1,288 s.f. Lawn Sod (tbd)Hydrozone C (high)
10,467 s.f. Native Grasses Seed Hydrozone A (low)
Note: All areas disturbed and not otherwise noted, to be re-seeded with Pitkin County 'non-irrigated mix'. Areas within 15' setback from stream to be revegetated with Pitkin County 'mountain meadow mix'.
R 12'-0"
R 15'-0"
all trees planted in the
Top of Slope area willrequire approval of the
City of AspenForester.
AeccDbCogoPoint (AeccLand100)
AeccDbCogoPoint (AeccLand100)
DN
pr
o
p
e
r
t
y
l
i
n
e
proposed access / elevated driveway
r e
d
m
o
u
s h a d y l a n e
garage
25
'
s
e
t
b
a
c
k
address monument
n zone
ntroller
es (hydrozone A)
oil shall have a min. of 1-3% of organic matter of
1 or 2 compost
Swale - see civil for more details
R 12'-0"
L.2.05
Landscape
Plan
Design
Development
revisions
date:September 20, 2017
September 25, 2017
October 2, 2017
October 9, 2017
November 20, 2017
December 8, 2017
January 2, 2018 (revised)
scale: 1" = 10'-0"
north
ENG is calling for
sidewalk in this area
along with a 5' planting
strip along new curb
property line
setback
1
5
'
s
e
t
b
a
c
k
tree protection zone10' setback
d them for the efficient use of water in the landscape design plan.
Distance from trunks
of trees will need to be
determined by City
Forester.
SE Response: The proposed detached sidewalk
has been coordinated with Engineering and is
reflected on the revised plan set.
Tree protection fencing
inspection from City of
Aspen Forester will take
place prior to any activity.
Note on sheet L2.05
modified to read 'fencing to
be installed at tree dripline'.
Sidewalk is now included on
planting plan.
Planting plan note on sheet
L2.05 dictates that all trees
planted within top of slope /
stream
setback must be approved
by City of Aspen Forester.
Note on planting plan / sheet
L2.05 states that distance of
boulder wall to tree trunks to
be approved by City
Forester.
02/13/2019