Loading...
HomeMy WebLinkAboutFile Documents.533 W Hallam St.0285.2018 (128).ARBKParks Markup Summary3 Page: [4] C1 Demolition Plan Author: davidr File Name: Civil - Comment Response Drawings.pdf Place red X on trees being removed to clearly define them. [4] C1 Demolition Plan (1) Page: [7] C4 Grading & Drainage Plan Author: davidr File Name: Civil - Comment Response Drawings.pdf State limits on this note that were discussed with the City Forester and provide documentation. [7] C4 Grading & Drainage Plan (2) Page: [7] C4 Grading & Drainage Plan Author: davidr File Name: Civil - Comment Response Drawings.pdf No excavation, thus no snowmelt will be allowed in this area to minimize further impacts to tree roots. Sand set pavers will be allowed at grade. This will also eliminate the need for any drain or piping. Page: 2 Author: davidr File Name: Shoring - 533 W Hallam.pdf Show trees on this plan sheet that may be impacted by both micro-piling and soil nailing. 2 (1) Page: IR-2 Irrigation Plan Author: davidr File Name: Irrigation - Comment Response Drwg's_228.pdf Move all irrigation accoutrament against foundation of house to minimize impacts to tree root zones. IR-2 Irrigation Plan (1) Place red X on trees being removed to clearly define them. State limits on this note that were discussed with the City Forester and provide documentation. No excavation, thus no snowmelt will be allowed in this area to minimize further impacts to tree roots. Sand set pavers will be allowed at grade. This will also eliminate the need for any drain or piping. 10 9 5' - 2 1/2" 4' - 0" 11 1/4" 17' - 8" 8 86' - 0 1/2" 37' - 8 1/2"25' - 5 1/2" 4 1 PROPERTY LINE 10' SETBACK A B C E UP UP UP CRAWLACCESS H MEDIA UCREF ELEV.CLO. CRAWLSPACEACCESS D L 5' SETBACK W K PROPERTY LINE 5' - 2 1/2"64' - 4 3/8" 86' - 0 1/2" 12' - 0 1/8"4' - 5 1/2" 10 9 8 3 2 1 PR O P E R T Y L I N E TUB 5' S E T B A C K 10 ' S E T B A C K BEN C H BEN C H BEN C H TUB BEN C H 10' S E T B A C K 1' - 8 " 16' - 8 1 / 4 " PR O P E R T Y L I N E 42' - 5 1 / 2 " PR O P E R T Y L I N E 12' - 0 1 / 4 " 7' - 1 " 4' - 6 " 6" Begin/End WallMicropile Turn Line 3Ground Nail Turn Line 4Ground Nail Turn Line 6Micropile Temporary Ground Nail Wall Temporary Micropile Cap/Wall 0+ 3 0 Gra d e - 5 1+10Grade-5 1+9 0 Gra d e - 5 2+50 Grade-5 0+2 0 0+4 0 0+6 0 0+ 8 0 1+00 1+20 1+4 0 1+6 0 1+8 0 2+0 0 2+20 2+40 2+60 Ground Nails below Grade Turn Lines 1 and 2Change Micropile to Ground Nail Turn Line 5 Change Ground Nail to Micropile Show trees on this plan sheet that may be impacted by bothmicro-piling and soilnailing. THIS EMERG E N C Y E S C A P E GRATE M U S T R E M A I N C L E A R AND UNOBST R U C T E D A T A L L TIMES THIS EMER G E N C Y E S C A P E GRATE MUS T R E M A I N C L E A R AND UNOBS T R U C T E D A T A L L TIMES THIS EMER G E N C Y E S C A P E GRATE M U S T R E M A I N C L E A R AND UNOBS T R U C T E D A T A L L TIMES C FS Turf Area Dripline Between Pavers (see Legend and Valve Schedule) 1" 1"34" 34"34" 34" 1" 34" 34" 1" 114" 11.95 1" 1 215.1 1" 2 1" 3 1" 4 5 1.65 1" 5 6 0.31 1" 6 70.39 1" 7 80.44 1" 8 9 0.54 1" 9 1" 10 2.70 1" 10 11 14.3 1"11 12 0.73 1" 12 13 2.38 1" 13 14 0.50 1" 14 150.37 1" 15 34" 1" 1" "1 Gr a n d J u n c t i o n Pi p e & S u p p l y Thi s d r a w i n g i s p r o v i d e d f o r r e c o m m e n d a t i o n o n l y . I t i s f o r t h e a i d & s e r v i c e o f o u r c u s t o m e r s & i s n o t t o b e c o n s t r u e d a s a PRO F E S S I O N A L E N G I N E E R E D D E S I G N . T h i s d e s i g n i s d o n e p e r c u s t o m e r s r e q u e s t , a n d i n f o r m a t i o n i s s u p p l i e d t o Gra n d J u n c t i o n P Sup p l y by t h e c u s t o m e r . A n y c h a n g e s , a d d i t i o n s , o r o m i s s i o n s w i l l e f f e c t t h e d e s i g n a n d p e r f o r m a n c e o f t h i s s y s t e m . D u e t o n o n - i n s p e c t i o n o f s i t e l o c a t i o n a n d c o n s t r u c t i o n p r o c e d u r e s . GR A N D J U N C T I O N P I P E & S U P P L Y IS N O T R E S P O N S I B L E F O R D A M A CA N B E D O N E T O E X I S T I N G T R E E S A N D S H R U B S D U R I N G T R E N C H I N G A N D I N S T A L L A T I O N O F S P R I N K L E R S Y S T E M . CO P Y R I G H T N O T I C E : T h i s d r a w i n g i s a n i n s t r u m e n t o f s e r v i c e a n d i s t h e p r o p e r t y o f Gra n d J u n c t i o n P i p e & S u p p l y . N o r e p r o d u c t i o n o f t h i s s h e e t i n w h o l e o r p a r t , f o r t h i s o r a n y o t h e r p r o j e c t , s h a l l b e d o n e w i t h o u t a u t h o r i z a t i o n f r o m Gra n d J u n c t i o n P i p e & Pro j e c t T i t l e : Drawn By: Designed By: Checked By: Drawing Numb Drawing Scale: Page: Design Date: PR FIN FO CO AS Job Status: Sheet No. File Name: DU N C A N R E S I D E N C E SHEET TITLE CALL 2 BUSINESS BEFORE YOU DIG, FOR THE MARKING MEMBE I have complied with the criteria of the Water Efficient Landscaping Standards and applied them accordingly for the efficient use of water in the irrigation design plan. NORTH 0 2.5 5 10 SCALE: 1" = 5' 2 J.D J.D 2018 1" 11-27 12-19-201 ADDED DESIGN WELS SECTION IR 2018-0 Irrigati J. 10-04-201 REVISED PER C & W.E.L.S. INST Move all irrigationaccoutrament againstfoundation of house tominimize impacts totree root zones. Page: L.4.02 Water Ef ciency Landscaping Standards Author: davidr File Name: Landscape - Comment Response Drwg's_42.pdf Per City Code 13.20: the dripline of a trees is determined by using the longest branch on the tree. Minimum offset for limits of excavation may have been determined by the previous City Forester, Please provide any documentation that corroborates this. L.4.02 Water Ef ciency Landscaping Standards (1) 7914 Sod Dripline Of Cottonwood Established By Parks Department Via Phone on 09/12/18 Per City Code 13.20: the dripline of a trees is determined by using the longest branch on the tree. Minimum offset for limits of excavation may have been determined by the previous City Forester, Please provide any documentation that corroborates this.