Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (40).ACBK0054.2019.ACBK_506 E Main St_CMP1.pdf Page: [3] C3.0 SITE LAYOUT PLAN Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf Deliveries in this area will have to be staged very carefully so as not to block alley or Jail Trail. Jail Trail is the only access to the parking garage as stairs are closed for a separate process. Check with Engineering Dept before scheduling any large deliveries in this area. PCCH CMP FINALVersion 1.0 4-12-19.pdf (9) Page: [3] C3.0 SITE LAYOUT PLAN Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf Any work in this area that will block the sidewalk, even for a delivery, will require a Temporary Encroachment Permit Page: [3] C3.0 SITE LAYOUT PLAN Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf No construction parking will be allowed in this alley. Page: [3] C3.0 SITE LAYOUT PLAN Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf Please show location of necessary items for a site plan. These include: job trailer, porta potty, waste management and recycling containers, and on site material staging areas. Page: 2 Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf Please provide copy of Certificate of Completion of City of Aspen Construction Management Plan Online Training Course. Course can be found at CMPAspen.com Deliveries in this area will have to be staged very carefully so as not to block alley or Jail Trail. Jail Trail is the only access to the parking garage as stairs are closed for a separate process. Check with Engineering Dept before scheduling any large deliveries in this area. 24" Any work in this area that will block the sidewalk, even for a delivery, will require a Temporary Encroachment Permit No construction parking will be allowed in this alley. PI T K I N C O U N T Y No. Please show location of necessary items for a site plan. These include: job trailer, porta potty, waste management and recycling containers, and on site material staging areas. 12-18..............................................................................................................TRAFFIC CO 19-22 .....................................SEDIMENT & EROSION CONTROL, FUGITIVE DUST CO 23.................................................................................................................................EMI 24 ..............................................................................................................NOISE SUPPR Please provide copy of Certificate of Completion of City of Aspen Construction Management Plan Online Training Course. Course can be found at CMPAspen.com Acknowledged Acknowledged Acknowledged Dumpster, port a potties and material storage areas added to site map. Our office will be in the jail building so there will be no job trailer. Recycling will be handled with FCI dump trailer. It will be stored off site and utilized when needed. Completed, verification attached APPROVED Page: 6 Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf This project is in the CRA. You will be responsible for following all applicable work restrictions. See CMP Requirements Manual section 4.2 Page: 11 Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf No construction parking will be allowed in Galena Plaza alley. Page: 12 Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf This statue is not applicable for construction deliveries. Construction deliveries are only allowed during allowable construction hours Page: 22 Author: patrickh File Name: PCCH CMP FINALVersion 1.0 4-12-19.pdf Are you planning on using acoustical barriers at this site? If so, please provide more information (type, size, exact location, and how they are supported). day from 7:30AM to 5:30PM and Saturdays as rmed on Sundays) 0db will take place between the hours of 9AM d) ekend ls on a Friday or Monday Resort Area and outside the Commercial Core: mas Week, Holiday Season (days leading up to ood and Wine Festival are not applicable. This project is in the CRA. You will be responsible for following all applicable work restrictions. See CMP Requirements Manual section 4.2 SITE MANAGEMENT Parking Management Construction workers will be encouraged to carpool to the pro Emergency Vehicle Access & Ordinance 35 Continuous emergency vehicle access will be maintained to th Staging Areas Specify construction staging areas See attached Project Site Logistics Plan for locations No construction parking will be allowed in Galena Plaza alley. This statue is not applicable for construction deliveries. Construction deliveries are only allowed during allowable construction hours NOISE SUPPRESSION erating noises greater than 70db will be performed Monday thru Friday from ly. Plan ers at the project site are planned and will include a combination of temporary he west side of the project site—reference site logistics plan and attached noise barriers. contractors to follow the appropriate “Noise Blocking Methods” for any noise greater than 70 decibels. When appropriate, equipment will be fitted the following: ial Grade combustion engine exhaust silencers ic hand power tools will be fitted with a silencer on the air exhaust port hrouds/intake & exhaust mufflers adening material (line hoppers, storage bins or chutes) Are you planning on using acoustical barriers at this site? If so, please provide more information (type, size, exact location, and how they are supported). Acknowledged Acknowledged We were not planning on installing barriers around the site due to the small amount of work that is outside and a majority of that work is between the jail and the courthouse. We will utilize sound barriers for specific operations such as concrete demo and sawcutting. Acknowledged