HomeMy WebLinkAboutFile Documents.409 E Hyman Ave.0058.2019 (7).ACBK1 Bonnie Muhigirwa From:Bonnie Muhigirwa Sent:Tuesday, September 3, 2019 4:21 PM To:andyduckett-emke@andarch.com; rebeccasilva@andarch.com; jodi.smith@pitkincounty.com; Patrick Rawley Cc:Phil LeHue; Denis Murray; Amy Simon; Mike Metheny Subject:Pitkin County Courthouse Plan Review Comments Round 2 Rebecca and Team,    As we discussed on Friday afternoon, there are a few remaining items that need to be corrected before we can complete  the review on the courthouse permit.  This email is to summarize the corrections needed for Building and Historic  Preservation, there may also be items from Engineering which will come separately.      1. Railings on the south staircase were not reviewed or approved by the Historic Preservation Commission.  HP  requests that the applicant delete them as they are an alteration to a character defining feature of the  building.  Building is willing to accept the omission of the handrails under section 1203.9 on the IEBC for historic  grand stairways, and 1201.2 which allows relief where compliance would be damaging  to the contributing  historic features.    2. Replacement of the front doors was not proposed or reviewed during the HPC review. Please provide a cut  sheet for the replacement of door 100A for review by HP.  The new doors shall also be compliance with ICC  A117.1‐2009 section 404.    3. Your responses state that existing Women’s Room 114 and Men’s Room 113 on the Main Level will be made  fully compliant per 2015 IEBC 1204.1.4, but elsewhere state that doors 113 and 114 do not provide the 32” clear  opening.  At least one men’s and one women’s restroom need to be fully compliant.    4. Plans need to show directional signage locations that will direct occupants to the accessible toilets per IBC 1111.   5. Per the door schedule, door 00D to Men’s Room 00D on the lower level has a clear width that exceeds 32”.  Can  the stall be revised to provide a fully accessible restroom on this level?      6. All signatures including the contractor, special inspection agency, and fabricator need to be provided on the  special inspection agreement.    When all items from all agencies have been addressed, please be in touch with your permit coordinator, Phil, to  coordinate the resubmittal.  Feel free to call or email me if you would like to discuss any of these items.    Regards,    Bonnie Muhigirwa Plans Examiner Community Development 130 S Galena St. Aspen, CO 81611 p 970.429.2787 c 970.309.5119 www.cityofaspen.com 2 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure  pursuant to applicable law.  If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it.  Further,  the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.  If applicable, the information and opinions  contained in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factual  representations that may or may not be accurate.  The opinions and information contained herein do not create a legal or vested right or any claim of detrimental  reliance.