HomeMy WebLinkAboutFile Documents.506 E Main St.0010-2022-BCOM (6)JURY DELIBERATION
204
ATTORNEY
204B
ATTORNEY
205
COURT SECURITY
OFFICE
206
DISTRICT
COURTROOM
201
COUNTY COURTROOM
203
DISTRICT JUDGE'S
CHAMBERS
201B
COUNTY JUDGE'S
CHAMBERS
202B
RR
202A
IN CUSTODY RR
207
SECURE HALLWAY
202
201D
201E
202D
DN
DN
DN
DN
DN DN
DN
MEN
200D
WOMEN
200E
JURY RR
204A
V.I.F.
13' - 2"
HOLD
5' - 0"
11
'
-
2
1
/
2
"
7'
-
9
"
6' - 6 1/2"
VI.F.
7' - 2 1/2"9 1/2"
A9.10
6
19' - 5"
UP
FIN. TO M.O.
4' - 10"
A9.10
1
V.I.F.
6' - 3"
HALL
200BHALL
200
HALL
200C
4' - 1 1/2"
201C
202A
STAFF WORKSTATION
201C
ELEV.
211
F
A
A
B
F
B
B
A
201B
203B
A7.1
1
<E> CANOPY
BELOW
<E> CANOPY
BELOW
A9.2
4
DN
NF13NF13
3' - 10 1/2"
ALIGN
M.O.
3' - 4"
M.O.
3' - 4"R.O.
3' - 2"
2' - 4 1/2"
R.O.
3' - 2"
NF15
HOLD
1' - 9 1/2"
M.O.
3' - 4"ALIGN
NF16
204B204
200B
201
203202C
206 205
200E
200D
202
204A
LANDING
200A
PATCH 4" DIAM HOLE
WITH BRICK TO MATCH
A0.2
3
NF21
A9.13
6
A7.6
1
7"
1' - 3 1/2"
1' - 1"
A0.25
H
3' - 6"
2' - 0"
4' - 2"
1' - 5"
4' - 1"
3' - 6"
4
A9.1
A9.1
2
A9.13
A9.1
1
9' - 8"
NF31
NF31
G
1' - 0"
10"
1' CLEAR
1' - 6"
NF36
NF37
6
A9.1 7
A9.135
4
3
2
201A
2"
206A
1' - 2 1/2"
NF19
A9.14
1
1' FLOOR
207B
202B
1' FLOOR
1' - 6"
NF44
NF45
NF46
NF46
1
NF47
NF48
NF49
A9.15
1
9"
1' - 7 1/2"
2' - 2"
5' - 1 1/2"
3' - 5 1/2"
NF75
1' FLOOR
VIF
5' - 1 1/2"
200F
CLOSET
200F
NF77
NF81
NF82
NF83
NF84
NF84
5' MAX
4' MIN 2' - 0"
CLR
4' - 0"
7' - 10"
VIF
4' - 3"
7' - 0"
NF82
VIF
22' - 6"
7
19' - 6"
16' - 11"
VIF
6' - 7"
4' - 4"
4' - 4"
10' - 4 1/2"
3' - 6"2' - 7 1/2"
5' - 11"
4' - 3"
3' - 11 1/2"
3' - 11 1/2"
1' - 8"
4' - 3"
3' - 9 1/2"
1' - 9"
3' - 1"
6' - 5 1/2"
2' - 5"
4' - 0"
10' - 5"
6' - 2"
18' - 3"
VIF
4' - 1"
4' - 3"
10"
ALIGN EDGE OF JURY
RAIL W/ <E> DOOR TRIM
14' - 7"
1' - 3"
20' - 2 1/2"
1' - 4"
NF88
NF88
NF89 NF89
NF89
NF89
LEGEND
<E> WALL
<N> WALL
FLOOR
ELEVATION
32" CLEAR
ACCESSIBLE
PATH
-
101
X
KEYNOTE
DOOR TAG
WALL TYPE
GENERAL NOTES
1. PATCH AND REPAIR ALL FINISHES AFFECTED BY CONSTRUCTION. MATCH ADJACENT FINISH.
2. COORDINATE REUSE, SALVAGE, OR DISPOSAL OF ALL DEMO ITEMS WITH OWNER.
3. REMOVE & SALVAGE <E> WINDOW TREATMENTS. COORDINATE REINSTALLATION WITH
PITKIN COUNTY/ 9TH JUDICIAL DISTRICT.
4. FURNITURE BY OTHERS. SHOWN FOR REFERENCE.
5. PITKIN COUNTY TO BE RESPONSIBLE FOR REMOVING / RELOCATING ALL <E> FURNITURE.
6. REFER TO M, P, E, & S SHEETS FOR ADDITIONAL INFORMATION.
7. REFER TO FINISH PLANS AND RCPS FOR ADDITIONAL INFORMATION.
8. ALL REPOSITIONED COURTROOM FURNITURE TO PROVIDE 30" CLEAR.
9. REMOVE AND SALVAGE <E> SIGNAGE (FLAGS AND WALL MOUNTED). MODIFY FOR <N>
ROOM NAMES. INSTALL <N> TO MATCH <E> WHERE NEEDED.
10. REFER TO A 9.7 FOR ADDITIONAL CLERESTORY.
Project Number
Date
Drawn by
Checked by
Anderson Hallas
Architects, PC
ARCHITECTURE
HISTORIC PRESERVATION
COPYRIGHT 2019
ANY UNAUTHORIZED USE OF THESE DOCUMENTS
IS PROHIBITED WITHOUT THE WRITTEN CONSENT
OF:
ANDERSON HALLAS ARCHITECTS, P.C.
PLANNING
Issue
715 FOURTEENTH STREET
GOLDEN, COLORADO 80401
(303) 278-4378
FAX (303) 278-0521
Scale AS NOTED
6/9/2022 1:24:02 PM
A1.2
SECOND LEVEL
FLOOR PLAN
2017910
PI
T
K
I
N
C
O
U
N
T
Y
CO
U
R
T
H
O
U
S
E
R
E
M
O
D
E
L
PI
T
K
I
N
C
O
U
N
T
Y
,
C
O
1/18/2022
LWB
RAS/NAA
50
6
E
M
a
i
n
S
t
S
t
3
0
0
,
A
s
p
e
n
,
C
O
8
1
6
1
1
PERMIT
N
3/16" = 1'-0"1 SECOND LEVEL FLOOR PLAN
KEYNOTES
Key Value Keynote Text
NF13 PROVIDE <N> FLOOR MOUNTED WD
GUARDRAILS.
NF15 INFILL WALL WITH MASONRY, RE:
STRUC. PROVIDE SMOOTH AND
FLUSH FINISH TO MATCH <E> ADJ
FURRING AND FINISH.
NF16 MODIFY <E> WD BENCH TO PROVIDE
CLEAR FLOOR SPACE (30"W X 48"D).
CONTRACTOR SHALL PROVIDE FINISH
SURFACES TO MATCH <E>.
NF19 <E> DOOR TO BE FASTENED IN THE
CLOSED POSITION. <E> TRANSOM
ABOVE SHOULD HAVE MIRRORED
FILM APPLIED BEHIND GLASS.
REMOVE DOOR KNOB INFILL HOLE
WHERE WHERE HDWR REMOVED.
PROVIDE FLUSH FINISH WITH
SURROUNDING WD, PT TO MATCH.
NF21 REPAIR TRIM AT WALL WHERE DAIS
REMOVED.
NF31 PROTECT <E> SAFE DOORS TO
REMAIN IN PLACE.
NF36 INFILL <E> OPENING. MATCH <E> ADJ
FINISH.
NF37 PROVIDE <N> PLUMBING CHASE FOR
<N> ROOF DRAIN WITH 12" MIN INT
CLEAR. SIZE OF PIPE TO BE
CONFIRMED VIA DESIGN BUILD.
NF44 ADD ALT #2: COUNTY COURTROOM
203 INCLUDING JURY BOX, JUDGE
BENCH, WITNESS STAND, CLERKS
BENCH: <N> CPT, PATCH, REPAIR, PT
WALL. RE: DTLS A9.0.
NF45 <N> VERTICAL CHASE AND
ASSOCIATED STRUCTURAL WORK
AND FINISH REPAIR PART OF BASE
GMP.
NF46 PROVIDE DIRECTIONAL SIGNAGE.
SIGN SHALL INDICATE ACCESSIBLE
ROUTE & RESTROOMS LOCATED ON
MAIN LEVEL. SIGNAGE TO SHOW PLAN
OF MAIN LEVEL WITH RESTROOM
LOCATION PER IBC 1111.
NF47 INSTALL SALVAGE DOOR TRIM &
FRAME. ENLARGE <E> MO OPENING &
PROVIDE NEW 36" WD DOOR TO
MATCH <E>. PROVIDE <N> WD HEAD
TRIM & MODIFY FRAME FOR NEW
DOOR WIDTH. PROVIDE NEW
ACCESSIBLE HARDWARE.
NF48 PROVIDE 2X FRAMING TO CONCEAL
ALL <N> DATA AND POWER TO
JUDGE'S DAIS.
NF49 PROVIDE NEW STL EGRESS STAIR
AND SECURITY ENCLOSURE, RE:
STRUC.
NF75 INSTALL SALVADED DOOR &
TRANSOM TO MATCH REVEAL AT
DOOR 205. SET SALVAGED DOOR &
TRANSOM TOWARDS ATTORNEY 205.
PROVIDE FULL DEPTH ACOUSTIC
BATT INSULATION AT DOOR AND
TRANSOM OPENING. REMOVE DOOR
HARDWARE & PATCH WOOD DOOR
WHERE HARDWARE IS REMOVED.
LEAVE SALVAGED HARDWARE IN
DOOR CAVITY WHEN INFILL WALL IS
FRAMED. PROVIDE FILM ON BACKSIDE
OF TRANSOM TO MATCH DOOR 100C.
NF77 CONTRACTOR TO INFILL DOOR
UNDER STAIR WITH <N> FRAMING AND
GWB. <N> GWB FINISH TO BE IN THE
SAME PLANE AS THE <E> PLASTER.
FINISH GWB TO MATCH <E> PLASTER
TEXTURE. PROVIDE <N> WOOD BASE
AT INFILL TO MATCH <E>. PROVIDE
<N> WALL MOUNTED WATER BOTTLE
FILL STATION. CONTRACTOR TO
PROVIDE 24INCH X 24INCH ACCESS
PANEL, FCI TO CONFIRM ACCESS
PANEL SIZE & LOCATIONS W/ OWNER.
NF81 FCI TO CONFIRM POWER AND DATA
HAS BEEN ROUTED TO THE MAIN
LEVEL IT 106.
NF82 <N> AV RACK.
NF83 CONTRACTOR TO VERIFY DOOR 203
CAN OPEN 180 DEGREES.
NF84 REMOVE AND SALVAGE AUDIENCE
RAIL FOR RELOCATION.
NF88 EXISTING DOORS PROVIDE 30" CLEAR.
NF89 PROVIDE NEW EXIT SIGNAGE.
DRAWINGS BASED ON FLOOR PLANS
PROVIDED BY PITKIN COUNTY. CONTRACTOR
TO NOTIFY ARCHITECT OF ANY DEVIATIONS
FROM ACTUAL FIELD CONDITIONS, PRIOR TO
COMMENCING WITH WORK.
0 4' 8'12'
No. Description Date
1 ADDENDUM 01 4/26/2019
6 BUILDING
COMMENTS
9/04/2019
8 CHANGE ORDER
PHASE 1
4/02/2020
9 ASI#2 12/07/2021
10 PHASE III CHANGES 3/11/2022
06/14/202206/14/2022
denism