Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0010-2022-BCOM (6)JURY DELIBERATION 204 ATTORNEY 204B ATTORNEY 205 COURT SECURITY OFFICE 206 DISTRICT COURTROOM 201 COUNTY COURTROOM 203 DISTRICT JUDGE'S CHAMBERS 201B COUNTY JUDGE'S CHAMBERS 202B RR 202A IN CUSTODY RR 207 SECURE HALLWAY 202 201D 201E 202D DN DN DN DN DN DN DN MEN 200D WOMEN 200E JURY RR 204A V.I.F. 13' - 2" HOLD 5' - 0" 11 ' - 2 1 / 2 " 7' - 9 " 6' - 6 1/2" VI.F. 7' - 2 1/2"9 1/2" A9.10 6 19' - 5" UP FIN. TO M.O. 4' - 10" A9.10 1 V.I.F. 6' - 3" HALL 200BHALL 200 HALL 200C 4' - 1 1/2" 201C 202A STAFF WORKSTATION 201C ELEV. 211 F A A B F B B A 201B 203B A7.1 1 <E> CANOPY BELOW <E> CANOPY BELOW A9.2 4 DN NF13NF13 3' - 10 1/2" ALIGN M.O. 3' - 4" M.O. 3' - 4"R.O. 3' - 2" 2' - 4 1/2" R.O. 3' - 2" NF15 HOLD 1' - 9 1/2" M.O. 3' - 4"ALIGN NF16 204B204 200B 201 203202C 206 205 200E 200D 202 204A LANDING 200A PATCH 4" DIAM HOLE WITH BRICK TO MATCH A0.2 3 NF21 A9.13 6 A7.6 1 7" 1' - 3 1/2" 1' - 1" A0.25 H 3' - 6" 2' - 0" 4' - 2" 1' - 5" 4' - 1" 3' - 6" 4 A9.1 A9.1 2 A9.13 A9.1 1 9' - 8" NF31 NF31 G 1' - 0" 10" 1' CLEAR 1' - 6" NF36 NF37 6 A9.1 7 A9.135 4 3 2 201A 2" 206A 1' - 2 1/2" NF19 A9.14 1 1' FLOOR 207B 202B 1' FLOOR 1' - 6" NF44 NF45 NF46 NF46 1 NF47 NF48 NF49 A9.15 1 9" 1' - 7 1/2" 2' - 2" 5' - 1 1/2" 3' - 5 1/2" NF75 1' FLOOR VIF 5' - 1 1/2" 200F CLOSET 200F NF77 NF81 NF82 NF83 NF84 NF84 5' MAX 4' MIN 2' - 0" CLR 4' - 0" 7' - 10" VIF 4' - 3" 7' - 0" NF82 VIF 22' - 6" 7 19' - 6" 16' - 11" VIF 6' - 7" 4' - 4" 4' - 4" 10' - 4 1/2" 3' - 6"2' - 7 1/2" 5' - 11" 4' - 3" 3' - 11 1/2" 3' - 11 1/2" 1' - 8" 4' - 3" 3' - 9 1/2" 1' - 9" 3' - 1" 6' - 5 1/2" 2' - 5" 4' - 0" 10' - 5" 6' - 2" 18' - 3" VIF 4' - 1" 4' - 3" 10" ALIGN EDGE OF JURY RAIL W/ <E> DOOR TRIM 14' - 7" 1' - 3" 20' - 2 1/2" 1' - 4" NF88 NF88 NF89 NF89 NF89 NF89 LEGEND <E> WALL <N> WALL FLOOR ELEVATION 32" CLEAR ACCESSIBLE PATH - 101 X KEYNOTE DOOR TAG WALL TYPE GENERAL NOTES 1. PATCH AND REPAIR ALL FINISHES AFFECTED BY CONSTRUCTION. MATCH ADJACENT FINISH. 2. COORDINATE REUSE, SALVAGE, OR DISPOSAL OF ALL DEMO ITEMS WITH OWNER. 3. REMOVE & SALVAGE <E> WINDOW TREATMENTS. COORDINATE REINSTALLATION WITH PITKIN COUNTY/ 9TH JUDICIAL DISTRICT. 4. FURNITURE BY OTHERS. SHOWN FOR REFERENCE. 5. PITKIN COUNTY TO BE RESPONSIBLE FOR REMOVING / RELOCATING ALL <E> FURNITURE. 6. REFER TO M, P, E, & S SHEETS FOR ADDITIONAL INFORMATION. 7. REFER TO FINISH PLANS AND RCPS FOR ADDITIONAL INFORMATION. 8. ALL REPOSITIONED COURTROOM FURNITURE TO PROVIDE 30" CLEAR. 9. REMOVE AND SALVAGE <E> SIGNAGE (FLAGS AND WALL MOUNTED). MODIFY FOR <N> ROOM NAMES. INSTALL <N> TO MATCH <E> WHERE NEEDED. 10. REFER TO A 9.7 FOR ADDITIONAL CLERESTORY. Project Number Date Drawn by Checked by Anderson Hallas Architects, PC ARCHITECTURE HISTORIC PRESERVATION COPYRIGHT 2019 ANY UNAUTHORIZED USE OF THESE DOCUMENTS IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF: ANDERSON HALLAS ARCHITECTS, P.C. PLANNING Issue 715 FOURTEENTH STREET GOLDEN, COLORADO 80401 (303) 278-4378 FAX (303) 278-0521 Scale AS NOTED 6/9/2022 1:24:02 PM A1.2 SECOND LEVEL FLOOR PLAN 2017910 PI T K I N C O U N T Y CO U R T H O U S E R E M O D E L PI T K I N C O U N T Y , C O 1/18/2022 LWB RAS/NAA 50 6 E M a i n S t S t 3 0 0 , A s p e n , C O 8 1 6 1 1 PERMIT N 3/16" = 1'-0"1 SECOND LEVEL FLOOR PLAN KEYNOTES Key Value Keynote Text NF13 PROVIDE <N> FLOOR MOUNTED WD GUARDRAILS. NF15 INFILL WALL WITH MASONRY, RE: STRUC. PROVIDE SMOOTH AND FLUSH FINISH TO MATCH <E> ADJ FURRING AND FINISH. NF16 MODIFY <E> WD BENCH TO PROVIDE CLEAR FLOOR SPACE (30"W X 48"D). CONTRACTOR SHALL PROVIDE FINISH SURFACES TO MATCH <E>. NF19 <E> DOOR TO BE FASTENED IN THE CLOSED POSITION. <E> TRANSOM ABOVE SHOULD HAVE MIRRORED FILM APPLIED BEHIND GLASS. REMOVE DOOR KNOB INFILL HOLE WHERE WHERE HDWR REMOVED. PROVIDE FLUSH FINISH WITH SURROUNDING WD, PT TO MATCH. NF21 REPAIR TRIM AT WALL WHERE DAIS REMOVED. NF31 PROTECT <E> SAFE DOORS TO REMAIN IN PLACE. NF36 INFILL <E> OPENING. MATCH <E> ADJ FINISH. NF37 PROVIDE <N> PLUMBING CHASE FOR <N> ROOF DRAIN WITH 12" MIN INT CLEAR. SIZE OF PIPE TO BE CONFIRMED VIA DESIGN BUILD. NF44 ADD ALT #2: COUNTY COURTROOM 203 INCLUDING JURY BOX, JUDGE BENCH, WITNESS STAND, CLERKS BENCH: <N> CPT, PATCH, REPAIR, PT WALL. RE: DTLS A9.0. NF45 <N> VERTICAL CHASE AND ASSOCIATED STRUCTURAL WORK AND FINISH REPAIR PART OF BASE GMP. NF46 PROVIDE DIRECTIONAL SIGNAGE. SIGN SHALL INDICATE ACCESSIBLE ROUTE & RESTROOMS LOCATED ON MAIN LEVEL. SIGNAGE TO SHOW PLAN OF MAIN LEVEL WITH RESTROOM LOCATION PER IBC 1111. NF47 INSTALL SALVAGE DOOR TRIM & FRAME. ENLARGE <E> MO OPENING & PROVIDE NEW 36" WD DOOR TO MATCH <E>. PROVIDE <N> WD HEAD TRIM & MODIFY FRAME FOR NEW DOOR WIDTH. PROVIDE NEW ACCESSIBLE HARDWARE. NF48 PROVIDE 2X FRAMING TO CONCEAL ALL <N> DATA AND POWER TO JUDGE'S DAIS. NF49 PROVIDE NEW STL EGRESS STAIR AND SECURITY ENCLOSURE, RE: STRUC. NF75 INSTALL SALVADED DOOR & TRANSOM TO MATCH REVEAL AT DOOR 205. SET SALVAGED DOOR & TRANSOM TOWARDS ATTORNEY 205. PROVIDE FULL DEPTH ACOUSTIC BATT INSULATION AT DOOR AND TRANSOM OPENING. REMOVE DOOR HARDWARE & PATCH WOOD DOOR WHERE HARDWARE IS REMOVED. LEAVE SALVAGED HARDWARE IN DOOR CAVITY WHEN INFILL WALL IS FRAMED. PROVIDE FILM ON BACKSIDE OF TRANSOM TO MATCH DOOR 100C. NF77 CONTRACTOR TO INFILL DOOR UNDER STAIR WITH <N> FRAMING AND GWB. <N> GWB FINISH TO BE IN THE SAME PLANE AS THE <E> PLASTER. FINISH GWB TO MATCH <E> PLASTER TEXTURE. PROVIDE <N> WOOD BASE AT INFILL TO MATCH <E>. PROVIDE <N> WALL MOUNTED WATER BOTTLE FILL STATION. CONTRACTOR TO PROVIDE 24INCH X 24INCH ACCESS PANEL, FCI TO CONFIRM ACCESS PANEL SIZE & LOCATIONS W/ OWNER. NF81 FCI TO CONFIRM POWER AND DATA HAS BEEN ROUTED TO THE MAIN LEVEL IT 106. NF82 <N> AV RACK. NF83 CONTRACTOR TO VERIFY DOOR 203 CAN OPEN 180 DEGREES. NF84 REMOVE AND SALVAGE AUDIENCE RAIL FOR RELOCATION. NF88 EXISTING DOORS PROVIDE 30" CLEAR. NF89 PROVIDE NEW EXIT SIGNAGE. DRAWINGS BASED ON FLOOR PLANS PROVIDED BY PITKIN COUNTY. CONTRACTOR TO NOTIFY ARCHITECT OF ANY DEVIATIONS FROM ACTUAL FIELD CONDITIONS, PRIOR TO COMMENCING WITH WORK. 0 4' 8'12' No. Description Date 1 ADDENDUM 01 4/26/2019 6 BUILDING COMMENTS 9/04/2019 8 CHANGE ORDER PHASE 1 4/02/2020 9 ASI#2 12/07/2021 10 PHASE III CHANGES 3/11/2022 06/14/202206/14/2022 denism