Loading...
HomeMy WebLinkAboutFile Documents.430 W Hallam St.0291.2017 (100).ARBK430 W Hallam_BuildingComments_1 Page: 1 File Name: Demolition Notification Application.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Prior to permit issuance, the approved application and license to demolish must be provided to the Building Department. You must also provide a final air clearance asbestos abatement report. Demolition Notification Application.430 W Hallam.2017.11.pdf (1) Page: A-405 RADON DETAIL File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Rather than showing all possible methods of radon mitigation, select which radon mitigation method will be used for this project. Provide foundation details showing the soil gas retarder as well as pipe locations on the floor/roof plans. Plan Set.430 W Hallam.2017.11.pdf (10) Page: A-503 EXTERIOR CONSTRUCTION DETAILS File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: Air sealing general note Color: A continuous air barrier is required per 2015 IECC table R402.4.1.1 Indicate the continuity of the air barrier and where it is located throughout the building. Note locations that require caulking, sealing, taping, etc. Note which components are included in the air barrier such as spray foam, gypsum, housewrap, and/or exterior insulation. You may have all of the above but you need to pick one continuous barrier and stick to it. It needs to follow the thermal barrier. The better detail you provide, the easier it will be for the contractor and inspector to be successful. This is a new 2015 code requirement in lieu of a blower door test. Page: A-605 EXTERIOR DOR & WINDOW SCHEDULE File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Label which windows are required to be safety glazed per R308.4. Prior to permit issuance, the approved application and license to demolish must be provided to the Building Department. You must also provide a final air clearance asbestos abatement report. DRAWING ISSUANCE INDEX ID NAME PERMIT - Z SET PERMIT - A SET ISSUED DATE 10/31/17, 11:13 AM 11/8/17, 3:40 PM STEVENWILSON402127 STAT E OF COLOR A DO L I C ENSED ARC HITECT COPYRIGHT PROJECT NO: DRAWN BY: FORUM PHI LLC Aspen CO 81611 430 W Hallam St DATE OF PUBLICATION 11/9/17 BMD 1636 Aspen:715 West Main Street, #204Aspen, Colorado 81611 Basalt:104 Midland Ave, #202Basalt, CO 81612 forumphi.comp: 970.279.4157f: 866.770.5585 foundationarea.Eachradonventpipeshallterminateabovethe rooforshallbeconnectedtoasingleventthatterminatesabove APPENDIXF gasketedorotherwisesealed lid.Sumps pointinasub-slabdepressurizationsys- shallextendto allfoundation walls enclosing thecrawl spacearea. APPENDIXF TYPICALSUB-SLABDEPRESSURIZATIONPASSIVERADONSYSTEM PASSIVERADONSYSTEMVENTEDTHROUGHSUMP SLAB GRADEGRAVEL POLYETHYLENESHEETING.. ATIIC BASEMENT LIVINGAREA ~-. ..,..........,""""-+O'T--rr~--------t 1------1 PASSIVERADONSYSTEMUSING DRAIN-TILELOOP SUB-MEMBRANEDEPRESSURIZATIONSYSTEM FORCRAWLSPACE ATTIC .. LIVINGAREA BASEMENT DRAIN TILELOOP POLYETHYLENESHEETING ATTIC LIVINGAREA ... FIGUREAF102 RADON-RESISTANTCONSTRUCTIONDETAILSFORFOURFOUNDATIONTYPES 2009INTERNATIONALRESIDENTIALCODE®789 Rather than showing all possible methods of radon mitigation, select which radon mitigation method will be used for this project. Provide foundation details showing the soil gas retarder as well as pipe locations on the floor/roof plans. DRAWING ISSUANCE INDEX ID NAME PERMIT - Z SET PERMIT - A SET ISSUED DATE 10/31/17, 11:13 AM 11/8/17, 3:40 PM STRUCT E CT R RUCT RUCT RUCT T.O. SLAB REF STRUCT T.O. BEAM REF STRUCT CT A continuous air barrier is required per 2015 IECC table R402.4.1.1 Indicate the continuity of the air barrier and where it is located throughout the building. Note locations that require caulking, sealing, taping, etc. Note which components are included in the air barrier such as spray foam, gypsum, housewrap, and/or exterior insulation. You may have all of the above but you need to pick one continuous barrier and stick to it. It needs to follow the thermal barrier. The better detail you provide, the easier it will be for the contractor and inspector to be successful. This is a new 2015 code requirement in lieu of a blower door test. Label which windows are required to be safety glazed per R308.4. Page: Grade-2 Temporary Micropile Wall Location File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Provide architectural detail to illustrate how waterproofing and rigid insulation will be provided where foundation wall abuts micropile wall. Page: GX-1 GEOTHERMAL SITE PLAN File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Final design ready for construction must be provided for plan review and permit issuance. Provide full stamped engineered design of geothermal system and loop field. Page: L500 SITE DETAILS File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Provide final plans, ready for construction Page: L500 SITE DETAILS File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Provide a more detailed pervious snowmelt detail showing that the insulation has openings that provide the required permiability (at least 30%) and that the insulation value is increased to account for the holes (typically 3" R15 blueboard). Please refer to the City of Aspen's pervious snowmelt insulation perforation calculator for more information. Page: M-110 CRAWL SPACE HVAC PLAN File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Ventilation scheduleon M601 calls for ERV to run 20 min/hour, not continuously. Please clarify. Proposed Micropile Cap Location Micropile Wall Turn Line 1 0+ 4 0 Gra d e - 5 0+805.1' Micropile Wall Turn Lines 4 and 5 0+ 2 0 0+ 4 0 0+ 6 0 Provide architectural detail to illustrate how waterproofing and rigid insulation will be provided where foundation wall abuts micropile wall. BLOCK 35 ALLEY Final design ready for construction must be provided for plan review and permit issuance. Provide full stamped engineered design of geothermal system and loop field. Drawn By:DHM DESIGN Date:2017.10.30 Scale:AS NOTED SITE DETAILS Provide final plans, ready for construction 1.DETAIL HAS BEEN PROVIDED TO ILLUSTRATE D 2.FINAL STONE TYPE AND PAVER DIMENSIONS TO BY OWNER AND TO PAIR WITH ARCHITECTURE STONE COBBLE OR CONCRETE PAVER 3/4" MORTAR SETTING BED 1" MORTAR BED FOR SNOWMELT TUBING CONCRETE SLAB; CONCRETE DIMENSION AND REINFORCING PER STRUCTURAL ENGINEER INSULATION TYPE: T.B.D. STRUCTURAL FILL; DEPTH AND TYPE PER STRUCTURAL ENGINEER SNOWMELT TUBING PAVER WIDTH TO BE 112" - 2 12" DEPENDING ON FINAL PAVER SELECTION BY OWNER NOTES: 1.SEE CIVIL DRAWINGS FOR EXTENTS OF SNOWMELT SYSTEM. 2.THIS DETAIL HAS BEEN PROVIDED TO ILLUSTRATE DESIGN INTENT. 3.SEE CIVIL DRAWINGS FOR PAVING ELEVATION, SITE DRAINAGE, AND DRAIN INLET LOCATIONS. 4.FINAL SLAB CROSS-SECTION TO BE COORDINATED WITH M.E.P., CIVIL, AND GEOTECHNICAL ENGINEER, INCLUDING DIMENSIONS, EXPANSION/CONTRACTION JOINTING, AND SUBGRADE PREP/COMPACTION 5.PAVING TO BE STONE OR PRE-CAST CONCRETE PAVERS. PAVER SIZE, LAYOUT, AND SPACING T.B.D. BASED ON OWNER SELECTION. MORTAR JOINTS. FILL AND RAKE SMOOTH. WIDTH TO BE APPROVED BY LANDSCAPE ARCHITECT NOTES: 1.EXPANSION JOINTS TO BE PLACED AS PER CIVIL SPECIFICATIONS. 2.FINAL PAVING CROSS SECTION AND SPECIFICATIONS PER CIVIL. 3.ADD WATER REPELLANT TO STONE PER SPECIFICATIONS. 4" COMPACTED ROAD BASE, CLASS 6 COMPACTED SUBGRADE STEPPING STONES5 L500 TUMBLED CONCRETE PAVERS- SNOWMELTED 1"= 1'- 0" 6 L500 MORTAR SET STONE PAVING 1"= 1'- 0" 4 L500 Provide a more detailed pervious snowmelt detail showing that the insulation has openings that provide the required permiability (at least 30%) and that the insulation value is increased to account for the holes (typically 3" R15 blueboard). Please refer to the City of Aspen's pervious snowmelt insulation perforation calculator for more information. G H SHEET DETAIL NOTES: ERV TO SERVE WHOLE HOUSE VENTILATION ALONG WITH VENTING THE CRAWL SPACE. RUN CONTINUOUSLY, SEE VENTILATION SCHEDULE ON PAGE M1.1 FOR REQUIRED CFM. 1 NER MS) Ventilation scheduleon M601 calls for ERV to run 20 min/hour, not continuously. Please clarify. Page: M-601 MECHANICAL SEQ & PIPING DIAGRAM File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Page: M-602 MECHANICAL SCHEDULES File Name: Plan Set.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Architecturals show 8,500 sf of floor area. M-601 calls for ERV to run 20 min/hour rather than continuously. Changing these two variables increases the required ventilation rate to be ~300 cfm. Clarify whether the ventilation will be running continuously, or increase the size if it will be run intermittently. Page: 4 File Name: Special Inspection and Testing Agreement.430 W Hallam.2017.11.pdf Author: bonniem Subject: PlanCheck Color: Owner's signature is required on the special inspection agreement. Special Inspection and Testing Agreement.430 W Hallam.2017.11.pdf (1) URE IN THE .), P-10a ATER UPPLY S 5°F ALL START, T THE WITH A OW CLOSE TO S SENSED 38°F (ADJ.). PPLY LED, ORS. THE SORS AND, ED FANS. OND STAGE R Y CALL FOR VALVE ON ANY E SHALL . ON A ALL L RUN. ON RADIANT ZONES WITHOUT FLOOR SENSORS: RADIANT ZONES WITHOUT FLOOR SENSORS SHALL BE CONTROLLED ACCORDING TO SPACE TEMPERATURE SENSORS AND SHALL OPERATE AS FIRST STAGE HEAT. ON A CALL FOR HEAT, THE ASSOCIATED ZONE VALVE(S) SHALL OPEN. RADIANT ZONES WITH FLOOR SENSORS: RADIANT ZONES WITH FLOOR SENSORS SHALL BE CONTROLLED ACCORDING TO SPACE TEMPERATURE SENSORS AND FLOOR TEMPERATURE SENSORS. ON A CALL FOR FIRST STAGE HEATING, THE ASSOCIATED ZONE VALVE(S) SHALL OPEN FULLY TO MEET THE SPACE SETPOINT. ALL BATHROOM ZONES SHALL HAVE A MINIMUM FLOOR TEMPERATURE SETPOINT, AND THE ASSOCIATED ZONE VALVE(S) SHALL OPEN/CLOSE TO MAINTAIN THAT TEMPERATURE. ALL COMMON AREA ZONES SHALL HAVE AN HOURLY MAXIMUM TEMPERATURE SETPOINT TO PREVENT OVERHEATING WITH SOLAR GAINS. HUMIDIFIERS: THE HUMIDIFIERS SHALL BE CONTROLLED ACCORDING TO HUMIDITY SENSORS AT THE RETURN GRILLES. ON A CALL FOR HUMIDITY, ALL SUPPLY ZONE DAMPERS SHALL OPEN AND THE FAN SHALL START. THE HUMIDIFIERS SHALL BE LOCKED OUT DURING COOLING OPERATION. ERV-1: THE ENERGY RECOVERY UNITS SHALL BE CONTROLLED BY A PERCENTAGE TIMER AND SHALL OPERATE 20 MINS. (ADJ.) EACH HOUR. PRIOR TO THE ERV STARTING, THE ASSOCIATED MOTORIZED DAMPERS SHALL OPEN. HUMIDISTATIC OVERRIDE IF SPACE RELATIVE HUMIDITY EXCEEDS 60% (ADJ.). BATH EXHAUST FANS: THE BATH EXHAUST FANS SHALL BE CONTROLLED BY A WALL MOUNTED SWITCH AND A TIMER. THE FAN SHALL RUN FOR 10 MIN. (ADJ.) AFTER THE SWITCH IS TURNED OFF. EF-18 - GARAGE EXHAUST FAN: THE GARAGE EXHAUST FAN SHALL BE INTERLOCKED WITH A CARBON MONOXIDE SENSOR AND THE GARAGE DOORS. WHENEVER CARBON MONOXIDE LEVELS EXCEED THE SETPOINT, THE FAN SHALL START AND RUN UNTIL LEVELS DROP BELOW THE SETPOINT. WHENEVER EITHER GARAGE DOOR CLOSES, THE FAN SHALL RUN FOR 15 MINS. (ADJ.) Architecturals show 8,500 sf of floor area. M-601 calls for ERV to run 20 min/hour rather than continuously. Changing these two variables increases the required ventilation rate to be ~300 cfm. Clarify whether the ventilation will be running continuously, or increase the size if it will be run intermittently. Project Address: 430 West Special Inspection Agency: West Slope Testing Owner: Engineer/ Architect I have read and a Signature: Signature: Si�:;%£ Owner's signature is required on the special inspection agreement. forumphi.com | p. 970.279.4109 | f. 866.770.5585 Aspen: 715 W. Main St, #204 Aspen, CO 81611 Basalt: 104 Midland Ave, #202 Basalt, CO 81621 FORUM PHI | 430 W Hallam St Clarifications Plan Check ***Numbers correspond with numbering found on comments PDF*** 1. Asbestos - The final asbestos abatement report and license to demolish will be submitted to the Building Department once all other comments are addressed. The existing home is currently being rented and the Owner wishes to continue to do so. The mitigation will occur once all departments have signed off on all other aspects of the permit. 2. A-405 - The sheet A-405 shows the single method of radon mitigation that we will be using for this project. F- 1 on sheet A-501 shows the soil gas/vapor retarder. The proposed floor plans show the location of radon ventilation via keynote 60. 3. A-503 - Air sealing note added to detail sheets A -503, A-504 and A-505. Air barrier details added on sheet A-502. 4. A-605 - Safety glazing is shown on exterior door schedules - sheets A-603, A-604, and A-605 for the windows where it is required per R308.4. 5. Grade-2 - Garage foundation wall next to the micropile wall extends down 42”. The full height foundation wall in the same location is at least 3’ from the micropile wall. The micropile wall serves as the footer for the garage, see detail 7/A-502. 6. GX-1 - Sheet GX-1 updated for construction. 7. L500 - Landscape drawing set updated for construction. 8. L500 - All snowmelt details shown in Civil drawing set. 9. M-110 - Sequence of Operation ERV-1 note on sheet M-601 revised to show ERV to run continuously. Sheet Detail Note #1 on sheet M-110 to remain. 10. M-601 - Sequence of Operation ERV-1 note on sheet M-601 revised to show ERV to run continuously. 11. M-602 - Ventilation Calculations on sheet M-602 updated for ERV-1 to run continuously. 12. Special Inspections - The Special Inspection and Testing Agreement form will be provided after all other comments have been addressed.