Loading...
HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0113.2018 (7).ARBKAA.5A.75BCDEE.5FGH 2 11013 4 113 112A 112B 112C 2022 30 3' - 9 3 / 4 " 4' - 0 1 / 8 " 3' - 5 1 / 2 " 3' - 0 " EG. T TT T T 3' - 7 " TOP OF FF @ LWR BASEMENT +88'-10" TOP OF FF @ MAIN BASEMENT +89'-10" TOP OF FF @ GUEST BEDROOM +108'-4 1/2" TOP OF FF @ UPPER LEVEL +111'-7" TOP OF FF @ MAIN LEVEL 100'-0" TOP OF FF @ LIVING ROOM 98'-6" TOP OF FF @ GARAGE +99'-0" T T T T 7' - 1 1 " 2' - 0 " 2' - 0 " MECHANICAL EXHAUST CHASE TO MATCH FP CHIMNEYS 10 ' - 1 1 / 2 " NEW ROOF OVER GARAGE LOWER GUEST BEDROOM ON UPPER LEVEL PROPOSED TOPO EXISTING TOPO 21 ' - 6 " 12 ' - 5 1 / 2 " 24 ' - 5 1 / 8 " EXISTING ROOF HEIGHTS 0F STRUCTURE MANSARD HAS BEEN REMOVED 4'-0" 1 1 1 1 TOP OF FF @ MAIN BASEMENT +89'-10" 2 1.5 133.544.556 5104 107 207A 210 21 31 3' - 0 " 3' - 5 1 / 2 " T T T T TOP OF FF @ UPPER FLOOR +111'-7" TOP OF FF @ MAIN LEVEL 100'-0" TOP OF FF @ LIVING ROOM 98'-6" TOP OF FF @ GUEST BEDROOM +108'-4 1/2" STAIRS BEYOND TO MAIN LEVEL FLOOR LOWER LIVING ROOM 2' - 0 " 2' - 0 " EXISTING TOPO 24 ' - 9 5 / 8 " EXISTING ROOF HEIGHTS / STRUCTURE GAS METER *EXISTING LOCATION dimension is to regulator vent centerline 4'-0" 3'-0" GAS METER *PROPOSED LOCATION dimension is to regulator vent centerline 6'-7"6'-5" EXISTING GRADE BACK FROM EXISTING STAIRS PROPOSED GRADE BACK FROM NEW STAIRS 1 1 PROJECT SCALE PROPOSED ELEVATIONS 1/4" = 1'-0" 16019.00 A-201 DATE 05.26.2017 PERMIT 04.18.2018 CHANGE ORDER #1 COPYRIGHT 2017 THUNDERBOWL ARCHITECTS AS P E N , C O L O R A D O PA R C E L I D # 2 7 3 7 1 8 1 3 2 0 1 7 14 1 9 C R Y S T A L L A K E R D C TH U N D E R B O W L AR C H I T E C T S THUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 NORTH ELEVATION 1/4" = 1'-0" 1 A-201 EAST ELEVATION 1/4" = 1'-0" 2 A-201 DATE PERMIT 05.26.2017 ASI #1 11.28.2017 04/23/2018 A A.5 A.75 B C D E E.5 F G H H 104A10568 007A 008A 009 02 01 112E 206A 204B 26 28 TOP OF FF @ LIVING ROOM 98'-6" 1' - 0 " T T T T T T T T T T T T T T T 2' - 0 " 2' - 0 " 3' - 1 1 / 2 " 3' - 1 1 / 2 " TOP OF FF @ MAIN BASEMENT +89'-10" TOP OF FF @ MAIN LEVEL 100'-0" TOP OF FF @ UPPER LEVEL +111'-7" FIREPLACE VENT *FOLLOW ALL MANUFACTURER REQ'S AND CLEARENCES LOWER LIVING ROOM EXISTING TOPO EXISTING ROOF HEIGHTS OF STRUCTURE MANSARD HAS BEEN REMOVED 4 A503 1 A503 2 A503 EXISTING ROOF HEIGHTS OF STRUCTURE MANSARD HAS BEEN REMOVED 204C T 1 1 1 1.5 2 3 3.5 4 4.5 5 6 91011 107A 29 3' - 6 1 / 4 " 1' - 0 " 3' - 3 " T T 6' - 1 0 1 / 2 " 1' - 0 " TOP OF FF @ MAIN LEVEL +100'-0" TOP OF FF @ UPPER FLOOR +111'-7" TOP OF FF @ LOWER LEVEL +89'-10" EXISTING TOPO 20 ' - 4 " EXISTING ROOF HEIGHTS / STRUCTURE EXISTING ROOF HEIGHTS OF STRUCTURE MANSARD HAS BEEN REMOVED TOP OF FF @ GUEST BEDROOM +108'-4 1/2" 112D T T 32 PROPOSED TOPO 1 1 DATE PERMIT 05.26.2017 ASI #1 11.28.2017 PROJECT SCALE PROPOSED ELEVATIONS 1/4" = 1'-0" 16019.00 A-202 DATE 05.26.2017 PERMIT 04.18.2018 CHANGE ORDER #1 COPYRIGHT 2017 THUNDERBOWL ARCHITECTS AS P E N , C O L O R A D O PA R C E L I D # 2 7 3 7 1 8 1 3 2 0 1 7 14 1 9 C R Y S T A L L A K E R D C TH U N D E R B O W L AR C H I T E C T S THUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 SOUTH ELEVATION 1/4" = 1'-0" 1 A-202 WEST ELEVATION 1/4" = 1'-0" 2 A-202 04/23/2018