Loading...
HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (57).ACBKforumphi.com | p. 970.279.4109 | f. 866.770.5585 Aspen: 715 W. Main St, #204 Aspen, CO 81611 Basalt: 104 Midland Ave, #202 Basalt, CO 81621 FORUM PHI | 200 S Aspen Clarification #4 Submitted on Nov 13, 2017 REMP Summary RRemp Fee $ 145,887.18 CRemp Fee $ 76,615.38 Total Remp Fee $ 222,502.56 PV Panel Offset $ 126,643.00 Geothermal Offset $ 50,400.00 Total Offset $ 177,043.00 Total Fees Due $45,459.56 11/27/17 PROJECT ADDRESS: Parcel ID #: Permit Number: CONTACT INFORMATION : Owner: Name:City:Dallas Address:State:TX Email:Zip Code:75201 Phone: Cell Phone: Owner's Representative : Name:City:Aspen Address:State:CO Email:Zip Code:81611 Phone: Cell Phone:970-274-9598 ` A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Hydro Snowmelt Electric Snowmelt Pool Spa Existing To be Removed Existing to Remain 0.00 sqft 0.00 sqft New 3235.00 sqft 161.75 sqft 58.25 sqft Total on site 3235.00 sqft 0.00 sqft 161.75 sqft 58.25 sqft Difference 3235.00 sqft 0.00 sqft 161.75 sqft 58.25 sqft Total Snowmelt on site Difference Boiler Efficiency 97.50%100.00%97.50%97.50% Mitigation Fee 22,562.05$ 10,514.87$ Total Fee for Mitigation:145,887.18$ B.ON-SITE RENEWABLE CREDITS Qty Type Supplemental System REMP Credit Use PV Worksheet 20.26 kW KiloWatts Photovoltaic System 126,643.00$ 0 Square Feet Hot Water Panels -$ Use GSHP Cert 360,000 BTU per hour Ground Source Heat Pump 50,400.00$ Total Mitigation Credits:177,043.00$ Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 23.34 or How many square feet of SHW (solar hot water) would I need?1167.10 R-REMP Fee:145,887.18$ Amount Previously Paid on This Permit:177,043.00$ TOTAL R-REMP FEE :(31,155.82)$ Refund (includes minus $750):30,405.82$ C. PREPARED BY:Date:25-Sep-17 Print Name: Signature: Phone & EMail: REVIEWED:Date: 970-279-4157 3235.00 sqft 3235.00 sqft 2009 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM City of Aspen Version 11 Updated July 13, 2016 200 S Aspen, Aspen, CO 81611 273707337001 0007-2017-ACBK DCBD2 LLC $112,810.26 Lori Gerety 970-797-4880 lgerety@forumphi.com 2100 Ross Ave, Suite 3300 td@dundon.co Ryan Walterscheid c/o Forum Phi 715 W Main St, Suite 204 rwalterscheid@forumphi.com 11/13/17 11/27/17 NT 12/18/17 -31,155.82 PROJECT ADDRESS: Parcel ID #: Permit Number: CONTACT INFORMATION : Owner: Name:City:Dallas Address:State:TX Email:Zip Code:75201 Phone: Cell Phone: Owner's Representative : Name:City:Aspen Address:State:CO Email:Zip Code:81611 Phone: Cell Phone:970-274-9598 A.COMMERCIAL RENEWABLE ENERGY MITIGATION PROGRAM Hydro Snowmelt Electric Snowmelt Pool Spa Existing To be Removed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New 1245.00 sqft Total on site 1245.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Difference 1245.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total Snowmelt on site Difference Boiler Efficiency 97.50%100%80.00%80.00% Mitigation Fee -$ -$ Total Fee for Mitigation:$76,615.38 B.ON-SITE RENEWABLE CREDITS Qty Type Supplemental System REMP Credit Use PV Worksheet 0.00 kW KiloWatts Photovoltaic System -$ 0 Square Feet Hot Water Panels -$ Use GSHP Cert 0 BTU per hour Ground Source Heat Pump -$ Total Mitigation Credits:-$ Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 12.26 or How many square feet of SHW (solar hot water) would I need?341.04 R-REMP Fee:76,615.38$ Amount Previously Paid on This Permit:-$ TOTAL R-REMP FEE :76,615.38$ Refund (includes minus $750):-$ C. PREPARED BY:Date:9/25/17 Print Name: Signature: Phone & EMail: REVIEWED:Date: 1245.00 sqft $76,615.38 2009 IECC COMMERCIAL RENEWABLE ENERGY MITIGATION PROGRAM City of Aspen Version 11 Updated July 13, 2016 200 S. Aspen St. Aspen, CO 273707337001 0007-2017-ACBK DCBD2 LLC 970-279-4157 Lori Gerety 970-797-4880 lgerety@forumphi.com 2100 Ross Ave, Suite 3300 td@dundon.co Ryan Walterscheid c/o Forum Phi 715 W Main St, Suite 204 rwalterscheid@forumphi.com 1245.00 sqft 11/13/17 11/27/17 NT 12/18/17 -31,155.82 from CREMP = total of: $45,459.56 Project Address: I.Please list the following information Designer Certification: Installer Accreditation: Division of Water Resources Permit: II.GSHP System Design Specifications Number of Loops: Depth of Loops:ft. Total Loop Length:ft. Total System Capacity @ 32 oF EWT:tons ARI 330 or ISO 13256-1System Performance:COP III.Attach the following information with application. A. GSHP unit performance sheets certified by ARI 330 or ISO 13256-1. B. Designer Certification Sheets C. Installer Certification Sheets D. Division of Water Resource Permit IV.PREPARED BY:Date: Print Name: Signature: Phone & EMail: REVIEWED:Date: GROUND SOURCE HEAT PUMP SOURCE CERTIFICATION City of Aspen 200 South Aspen, Aspen, CO 81611 Agency AEE CGD Number:16 IGSHPA Number:12131-994 Note: Installer provides DWR license/permit 12 350 8400 23.6 3.1 Coefficient of Performance of the system must be at least 3 as per American Research Institute Standard performance method (ARI 330) or ISO 13256-1 for closed loop earth-coupled heat pump systems (for hydronic systems use an output temperature of 115 degrees F) or equivalent procedure. NOTE: A GSHP is an energy-efficient option that significantly reduces energy use and minimizes REMP payments. The REMP payment associated with a GSHP is used to offset the coal powered electricity over 20 years. This option is calculated on REMP summary sheet. 1/3/17 Terry Proffer 303-424-1622 tproffer@gomajornow.com 11/27/17 NT 12/18/17 11/27/17 NT 12/18/17 0 10 20 30 40 50 60 70 80 90 0 87.00%93.20%97.60%99.90%100%98.00%93.90%87.80%80.00%70.70% 10 87.00%93.10%97.40%99.70%99.80%97.70%93.60%87.60%79.90%70.70% Collector 20 87.00%92.80%96.90%99.00%99.10%97.10%93.00%87.10%79.60%70.70% Aspect 30 87.00%92.40%96.10%98.00%97.90%95.90%92.00%86.20%79.00%70.50% Degrees 40 87.00%91.80%95.00%96.60%96.40%94.30%90.50%85.00%78.10%70.00% From 50 87.00%91.00%93.70%94.80%94.30%92.20%88.50%83.20%76.70%69.10% TRUE 60 87.00%90.00%92.00%92.70%91.90%89.60%86.00%80.90%74.70%67.60% South 70 87.00%89.00%90.10%90.20%89.00%86.60%82.90%78.10%72.20%65.50% 80 87.00%87.90%88.10%87.40%85.70%83.00%79.30%74.60%69.10%62.80% 90 87.00%86.70%85.80%84.30%82.10%79.10%75.20%70.60%65.30%59.50% 0 5 (derrived)10 20 incrementa l Δ 30 33.7 (derrived 40 incrementa l Δ 50 60 70 80 90 0 87.00%93.20%97.60%99.90%100%100%98.00%93.90%87.80%80.00%70.70% 10 87.00%90.05%93.10%97.40%99.70%99.80%99.80%0.20%97.70%93.60%87.60%79.90%70.70% 15 (derrived)87.00%89.98%92.95%97.15%99.20%99.25%99.30% Collector 20 87.00%89.90%92.80%96.90%99.00%99.10%99.10%0.70%97.10%93.00%87.10%79.60%70.70% Aspect 30 87.00%89.70%92.40%96.10%98.00%97.90%97.90%1.20%95.90%92.00%86.20%79.00%70.50% Degrees 40 87.00%89.40%91.80%95.00%96.60%96.40%96.40%1.50%94.30%90.50%85.00%78.10%70.00% From 50 87.00%89.00%91.00%93.70%1.80%94.80%94.30%94.30%2.10%92.20%88.50%83.20%76.70%69.10% TRUE 60 87.00%88.50%90.00%92.00%2.10%92.70%91.90%91.90%2.40%89.60%86.00%80.90%74.70%67.60% South 70 87.00%88.00%89.00%90.10%2.50%90.20%89.60%89.00%2.90%86.60%82.90%78.10%72.20%65.50% 80 87.00%87.45%87.90%88.10%2.80%87.40%86.55%85.70%3.30%83.00%79.30%74.60%69.10%62.80% 90 87.00%86.85%86.70%85.80%3.10%84.30%83.20%82.10%3.60%79.10%75.20%70.60%65.30%59.50% 100 87.00%86.20%85.40%3.40%80.90%79.70%78.50%4.00% 105 87.00%85.85%84.70%3.60%77.30%75.90%74.50%4.50% Collector Tilt, Degrees From Horizontal Hotel Lenado REMP Offset Collector Tilt, Degrees From Horizontal 11/27/17