HomeMy WebLinkAboutFile Documents.1320 Mountain View Dr.0013-2020-BCHO (20)Generated by REScheck-Web Software
Compliance Certificate
Project 1320 Mountain View
Energy Code:2015 IECC
Location:Aspen, Colorado
Construction Type:Single-family
Project Type:New Construction
Orientation:Bldg. faces 0 deg. from North
Conditioned Floor Area:4,790 ft2
Glazing Area 25%
Climate Zone:7 (9922 HDD)
Permit Date:
Construction Site:
1320 Mountain View
Aspen, CO
Owner/Agent:
1320 Mountain View LLC
623 E Hopkins Ave
Aspen, CO 81611
Designer/Contractor:
Thunderbowl Architects
300 S Spring St
Suite 201
Aspen, CO 81611
ryan@thunderbowlarchitects.com
Permit Number:
Compliance: Passes using UA trade-off
6.0% Better Than Code Maximum UA:722 Your UA:679
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
KITCHEN/DR Ceiling: Flat Ceiling or Scissor Truss 522 57.0 15.0 0.018 9
LR Ceiling: Flat Ceiling or Scissor Truss 633 57.0 15.0 0.018 11
BR Ceiling: Flat Ceiling or Scissor Truss 1,743 57.0 15.0 0.018 31
SOUTH LR Wall: Wood Frame, 16" o.c.
Orientation: Unspecified
324 26.0 6.6 0.037 7
Door: Glass Door (over 50% glazing)
Orientation: Unspecified
100 0.310 31
Window: Vinyl Frame
Orientation: Unspecified
32 0.270 9
SOUTH LR Wall upstairs: Wood Frame, 16" o.c.
Orientation: Unspecified
210 26.0 6.6 0.037 4
Door: Glass Door (over 50% glazing)
Orientation: Unspecified
100 0.310 31
WEST Wall UPSTAIRS: Wood Frame, 16" o.c.
Orientation: Unspecified
474 26.0 6.6 0.037 17
Window: Vinyl Frame
Orientation: Unspecified
8 0.270 2
WEST Wall DNSTAIRS: Wood Frame, 16" o.c.
Orientation: Unspecified
373 26.0 6.6 0.037 11
Window: Vinyl Frame
Orientation: Unspecified
10 0.270 3
Project Title: 1320 Mountain View
Data filename:Page 1 of 11
12/23/19Report date:01/27/2020
06/25/2020
bonniem
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Window copy: Vinyl Frame
Orientation: Unspecified
54 0.270 15
WEST Wall garage UPSTAIRS: Wood Frame, 16" o.c.
Orientation: Unspecified
124 26.0 6.6 0.037 5
north Wall UPSTAIRS: Wood Frame, 16" o.c.
Orientation: Unspecified
262 26.0 6.6 0.037 7
Window: Vinyl Frame
Orientation: Unspecified
6 0.270 2
Window copy: Vinyl Frame
Orientation: Unspecified
66 0.270 18
north Wall DNSTAIRS: Wood Frame, 16" o.c.
Orientation: Unspecified
221 26.0 6.6 0.037 4
Door: Glass Door (over 50% glazing)
Orientation: Unspecified
87 0.310 27
Window: Vinyl Frame
Orientation: Unspecified
9 0.270 2
Window copy: Vinyl Frame
Orientation: Unspecified
9 0.270 2
WEST BEDROOM Wall: Wood Frame, 16" o.c.
Orientation: Unspecified
203 26.0 6.6 0.037 8
MUDROOM: Wood Frame, 16" o.c.
Orientation: Unspecified
40 26.0 6.6 0.037 1
Window: Vinyl Frame
Orientation: Unspecified
8 0.270 2
UPSTAIRS EAST BEDROOM: Wood Frame, 16" o.c.
Orientation: Unspecified
114 26.0 6.6 0.037 4
north LR Wall: Wood Frame, 16" o.c.
Orientation: Unspecified
139 26.0 6.6 0.037 1
Door: Glass Door (over 50% glazing)
Orientation: Unspecified
58 0.310 18
Window: Vinyl Frame
Orientation: Unspecified
58 0.270 16
north DR Wall: Wood Frame, 16" o.c.
Orientation: Unspecified
122 26.0 6.6 0.037 2
Door: Glass Door (over 50% glazing)
Orientation: Unspecified
75 0.310 23
WEST DR Wall copy: Wood Frame, 16" o.c.
Orientation: Unspecified
102 26.0 6.6 0.037 3
Window: Vinyl Frame
Orientation: Unspecified
33 0.270 9
EAST LR Wall: Wood Frame, 16" o.c.
Orientation: Unspecified
407 26.0 6.6 0.037 13
Door: Glass Door (over 50% glazing)
Orientation: Unspecified
23 0.310 7
Window: Vinyl Frame
Orientation: Unspecified
18 0.270 5
Window copy: Vinyl Frame
Orientation: Unspecified
18 0.270 5
Floor: Slab-On-Grade (Unheated)
Insulation depth: 0.5'
252 19.0 0.959 242
Basement: Masonry Block w/ Empty Cells
Orientation: Unspecified
Wall height: 6.8'
Depth below grade: 6.8'
Insulation depth: 6.8'
2,395 19.0 10.0 0.030 72
Project Title: 1320 Mountain View
Data filename:Page 2 of 11
12/23/19Report date:01/27/2020
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Notes:
Contractor:Steeplechase Construction 124 Totterdown Rd Aspen, CO 81611
Project Title: 1320 Mountain View
Data filename:Page 3 of 11
12/23/19Report date:01/27/2020
Inspection Checklist
Requirements: 100.0% were addressed directly in the REScheck software
REScheck Software Version : REScheck-Web
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 4 of 11
12/23/19Report date:01/27/2020
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1
[FO4]1
Conditioned basement wall
insulation R-value. Where interior
insulation is used, verification
may need to occur during
Insulation Inspection. Not
required in warm-humid locations
in Climate Zone 3.
R-_____
R-_____
R-_____
R-_____
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[FO5]1
Conditioned basement wall
insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.2.9
[FO6]1
Conditioned basement wall
insulation depth of burial or
distance from top of wall.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 5 of 11
12/23/19Report date:01/27/2020
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 6 of 11
12/23/19Report date:01/27/2020
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 7 of 11
12/23/19Report date:01/27/2020
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 8 of 11
12/23/19Report date:01/27/2020
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 9 of 11
12/23/19Report date:01/27/2020
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 10 of 11
12/23/19Report date:01/27/2020
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: 1320 Mountain View
Data filename:Page 11 of 11
12/23/19Report date:01/27/2020
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
32.60Above-Grade Wall
29.00Below-Grade Wall
19.00Floor
72.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.31Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
01/27/2020