Loading...
HomeMy WebLinkAboutFile Documents.219 N Monarch St.0179.2017 (42).ARBK Cit of As®en.Water;{Efficient Landsca•,in: Ordinan City of Aspen Parks&ce; Recreation Dept. Pre fission Packet Completeness Review p 585 Cemetery Lane ro r•'"AlOn & DocumentationChecklist Aspen,CO 81611 (970)920-5120 Effective June 22, 2017, City of Aspen Water Efficient Landscaping Standards, Ordinance#16, Series 2017, shall apply to the following projects that use City of Aspen potable water: Landscaping, grading,installing or disturbing hardscapes, additions to structures, etc. that meet the requirements of a Major Engineering Review (a disturbance area greater than 1,000 square feet) and 25% of the entire site OR All interior alterations with a work area that affects 50% or greater of the existing gross square footage Links to the Water Efficient Landscaping Standards, the Water Budget Analysis & Calculation Sheet and the Water Ordinance Fact Sheet can be found at: www.cityofaspen.com/water. For assistance in compiling required documentation package, including water budget calculations, please contact Molly Somes at the City of Aspen Parks Department at 970.920.5582 or at efficientlandscape@cityofaspen.com. WATER SUPPLY INFORMATION If water is to be provided by City of Aspen,Applicant must answer the following questions. 1. Is the property already receiving City of Aspen water service? C (Yes ❑ No 2. Is there a well or wells on the property? ❑ Yes No 3. Are there other water sources/supplies on the property? ❑ Yes No If yes,name other water sources/supplies: 4. Are there existing city water taps to be disconnected? I Yes ❑No REQUIRED INFORMATION AND DOCUMENT CHECKLIST PROJECT INFORMATION • Date: 07/26/2017 Project Address: 219 N Monarch Street Project Type(e.g.New Construction,Redevelopment,Remodel,Addition): New Construction Total Property Sq.Ft.: 9,020 *Disturbance Area Sq. Ft.: 3,076 *Disturbance Area is defined as the external area of the building site where the ground is disturbed,which includes,but is not limited to: soil grading,landscaping,removing impervious area,adding impervious area,replacing impervious area,layback a reas, and stock pile areas. Total Landscape Area Sq.Ft.: 4,219 Total Irrigated Area Sq.Ft.: 4,219 Last Updated: 8/4/2017 Page 1 of 2 CAtto Efficient Landscaping Ordinance Information & Documentation Checklist Project Applicant Name: Michael Edinger Project Applicant Phone#: 719.331.921 1 Irrigation System Installer Name: Roaring Fork Landscabt etion System Installer Phone#963.8887 Landscape Installer Name:groundskeepers Landscape Installer Phone#: 948®1 122 AUTHORIZED OWNER INFORMATION Owner Name: laemcat Iic Mailing Address—Street: 219 n monarch Mailing Address—City, State, Zip: aspen CO 81611 City Water Account Number: Phone: contact michael Email: SUMISSION PACKET CHECKLIST (Due at time of building permit application if landscape compliance is required) REQUIREMENTS: COMMENTS: SUBMITTAL COMPLIANCE: Site Plan 51 Yes ❑ No Identified Disturbance Area Shown as part of the Site Plan Dit Yes ❑ No Landscape Design Plan with Soil Required Components Listed in Information Landscaping Standards Di Yes ❑ No ' Irrigation Design Plan Required Components Listed in Landscaping Standards Yes CI No I Water Budget Analysis& Calc. Sheet Provided by City Staff and Online LI Yes ❑ No Pools& Water Features(ponds, Is there apool,spa or water feature? No fountains, etc.) p ❑ Yes F-� Are pool and spa covers installed? ❑ Yes ❑ No n/a Do features use a recirculating water system and/or recycled water if available? ❑ Yes ❑ No see irrigation plan APPLICANT ACKNOWLEDGEMENT I/we agree to comply with the requirements of the City of Aspen Water Efficient Landscaping Standards and submit a complete Landscape and Irrigation Documentation Package. Michael Edinger Digitally signed by Michael Edinger DN:cn=Michael Edinger,o,ou,email=michael@aliusdc.com,c=US 07/21/2017 Date:2017.08.04 09:37:28-06'00' Applicant Signature Date michael edinger 719.331.9211 Print Name Contact Phone# FOR INTERNAL USE ONLY: . /CHECKLIST ACCEPTED&REVIEW BY: — ' ,� DATE: vv/� CHECKLIST WARRANTS LANDSCAPING ORDINANCE COMPLIANCE: gYes ❑ No Last Reviewed: 8/4/2017 Page 2 of 2