Loading...
HomeMy WebLinkAboutagenda.hpc.20250409AGENDA ASPEN HISTORIC PRESERVATION COMMISSION April 9, 2025 4:30 PM, City Council Chambers - 3rd Floor 427 Rio Grande Place Aspen, CO 81611 I.ROLL CALL II.MINUTES III.PUBLIC COMMENTS IV.COMMISSIONER MEMBER COMMENTS V.DISCLOSURE OF CONFLICT OF INTEREST VI.PROJECT MONITORING VI.A HPC Project Monitoring Reports VII.STAFF COMMENTS VIII.CERTIFICATE OF NO NEGATIVE EFFECT ISSUED VIII.A HPC Certificates of No Negative Effect IX.CALL UP REPORTS IX.A HPC Call Up Reports X.SUBMIT PUBLIC NOTICE FOR AGENDA ITEMS XI.SUBSTANTIAL AMENDMENT XII.OLD BUSINESS XIII.NEW BUSINESS HPC Project Monitoring Reports20250409.pdf HPC Certificates of No Negative Effect.20250409.pdf HPC Call Up Reports.20250409.pdf 1 1 XIV.ADJOURN XV.NEXT RESOLUTION NUMBER TYPICAL PROCEEDING FORMAT FOR ALL PUBLIC HEARINGS (1 Hour, 15 Minutes for each Major Agenda Item) 1. Declaration of Conflicts of Interest (at beginning of agenda) 2. Presentation of proof of legal notice (at beginning of agenda) 3. Applicant presentation (10 minutes for minor development; 20 minutes for major development) 4. Board questions and clarifications of applicant (5 minutes) 5. Staff presentation (5 minutes for minor development; 10 minutes for major development) 6. Board questions and clarifications of staff (5 minutes) 7. Public comments (5 minutes total, or 3 minutes/ person or as determined by the Chair) 8. Close public comment portion of hearing 9. Applicant rebuttal/clarification (5 minutes) 10. Staff rebuttal/clarification (5 minutes) End of fact finding. Chairperson identifies the issues to be discussed. 11. Deliberation by the commission and findings based on criteria commences. No further input from applicant or staff unless invited by the Chair. Staff may ask to be recognized if there is a factual error to be corrected. If the item is to be continued, the Chair may provide a summary of areas to be restudied at their discretion, but the applicant is not to re-start discussion of the case or the board’s direction. (20 minutes) 12. Motion. Prior to vote the chair will allow for call for clarification for the proposed resolution. Please note that staff and/or the applicant must vacate the dais during the opposite presentation and board question and clarification session. Both staff and applicant team will vacate the dais during HPC deliberation unless invited by the chair to return. Updated: March 7, 2024 2 2 Project Monitoring Reports Historic Preservation Commission April 9, 20243 MO N I T O R I N G C O M M I T T E E AS S I G N M E N T S & P R O J E C T S T A T U S Kara Thompson 300 E. Hyman Change Order Under Review 201 E. Main Temporary Certificate of Occupancy Issued 333 W. Bleeker Change Order Issued Skier’s Chalet Steakhouse Building Permit Under Review 720 E. Hyman Change Order Under Review 304 E. Hopkins Change Order Under Review 312 W. Hyman Building Permit Issued 520 E. Cooper Building Permit Issued 1020 E. Cooper Building Permit Under Review 110 W. Main, Hotel Aspen Change Order Issued Lift 1 ski lift Building Permit Under Review 134 E. Bleeker Closed Roger Moyer 227 E. Main Change Order Issued 135 E. Cooper Change Order Under Review Skier’s Chalet Lodge Building Permit Under Review 202 E. Main Building Permit Under Review 611 W. Main Building Permit Under Review 132 W. Hopkins Building Permit Issued 500/510 E. Durant Building Permit Issued 211 W. Main Temporary Certificate of Occupancy Issued 4 MO N I T O R I N G C O M M I T T E E AS S I G N M E N T S & P R O J E C T S T A T U S Jodi Surfas 202 E. Main Building Permit Under Review 611 W. Main Building Permit Under Review 602 E. Hyman Building Permit Issued 820 E. Cooper Building Permit Under Review 227 E. Bleeker Change Order Issued Unassigned 304 E. Hopkins Change Order Under Review 233 W. Bleeker Building Permit Issued 214 W. Bleeker Building Permit Under Review 128 E. Main Building Permit Issued 414-420 E. Cooper, Red Onion/JAS Building Permit Issued Barb Pitchford 121 W. Bleeker Building Permit Under Review 312 W. Hyman Building Permit Issued 132 W. Hopkins Building Permit Issued 214 W. Bleeker Building Permit Under Review 630 W. Main Building Permit Under Review 420 W. Francis Changer Order Under Review 135 W. Francis Land Use Approved 227 E. Bleeker Change Order Issued 215 E. Hallam Land Use Approved 5 MO N I T O R I N G C O M M I T T E E AS S I G N M E N T S & P R O J E C T S T A T U S Kim Raymond 630 W. Main Building Permit Under Review 205 W. Main Land Use Approved 216 W. Hyman Building Permit Issued 335 Lake Ave.Building Permit Under Review 434 E. Cooper, Bidwell Change Order Under Review Unassigned 420 W. Francis Change Order Under Review 400 E. Cooper Change Order Issued 414-420 E. Cooper, Red Onion/JAS Building Permit Issued 134 E. Bleeker Closed Dakota Severe 434 E. Cooper (Bidwell)Change Order Under Review 6 43 4 E . C o o p e r A v e . - Installing snow-melting tubing under the concrete sidewalk and historic pavers on the east side of 434 E. Cooper Ave. and under historic Pedestrian Mall pavers for the five feet immediately south. 7 21 1 W . M a i n S t . - Installation of Mail Boss Quadruple Mail Manager locking mailbox and post at intersection of front walkway and sidewalk. 8 82 0 E . C o o p e r A v e . - Increasing the height of the sliding doors and lowering the height of the gable-end windows on the second story of the south facade of the new addition. 9 82 0 E . C o o p e r A v e . - Installing a roof vent in the northeast corner of the historic resource - Installing chimney on the east instead of the west slope of the historic front-gable roof - Installing black snow guards to the east side of historic resource 10 82 0 E . C o o p e r A v e . - Installing a planter box on the patio east of the connector and spiral staircase - Removing the water closet window from the second story of the west facade of the new addition 11 12 8 E . M a i n S t . - Installing TRA Snow and Sun Snow Brackets, matching existing, to slope above mechanical equipment on north side of the north building. 12 33 3 W . B l e e k e r S t . - Maintaining previously installed new ridge beam for which historic rafters were altered in the historic outbuilding - Maintaining previously installed new fenestration framing for which historic Framing members were altered in the historic outbuilding. Maintaining previously installed new beams and rafters for which historic rafters were altered in the historic primary building 13 33 3 W . B l e e k e r S t . historic framing members were altered in the historic primary building - Maintaining previously installed new studs, blocking, and other framing elements for which historic framing members were altered in the historic primary building -Maintaining previously installed new fenestration framing for which historic framing members were altered in the historic primary building -Maintaining previously installed new steel structural diaphragm for which historic 14 33 3 W . B l e e k e r S t . - Applying a self- adhering waterproofing membrane with mastic on the bottom two feet of historic framing material on the east and north walls of the garage. Conditions: - No additional alteration to historic material may occur without approval explicitly permitting said alteration. - Inspections by HP staff must periodically occur. 15 40 0 E . C o o p e r A v e . - Extending the exterior wall on the west façade to enlarge the bottom stair landing to meet Building Code. 16 31 2 W . H y m a n A v e . - Installing closed-cell spray-foam insulation instead of rigid foam and batt insulation in all framed walls of the historic resource consistent with the attached drawing AP P R O V E D PR O P O S E D 2X4 FRAMING (EXISTING)CLOSED CELL SPRAY FOAM b EX I S T I N G 2X4 FRAMINGBATT INSULATION b SHEATHING SHEATHING (EXISTING) 17 31 2 W . H y m a n A v e . Conditions: -A stucco/drainable house wrap or the like must be installed between the spray foam and all historic material -A HP inspection of the wrap must be completed prior to the spray foam installation. 18 41 4 -418 E. C o o p e r A v e . - Changing approved sandstone pavers in front of 414-416 E. Cooper Ave. to exposed aggregate concrete and a gray concrete band. 19 41 4 -418 E. C o o p e r A v e . Conditions: - HP Staff to assess paint removal tests. - HP Staff to assess and document structures after paint is removed. - The back side of the Red Onion shall not be painted. - Brick repairs require separate approval. - Removing existing paint with a chemical stripper. - Limewashing brick and painting wood. 20 42 0 E. C o o p e r A v e . - Removing existing paint with a chemical stripper. - Repairing masonry. - Repainting masonry. Conditions: - HP Staff to assess paint removal tests. - HP Staff to assess and document structures after paint is removed. - The back side of the Red Onion shall not be painted. - Brick repairs require separate approval. - Staff strongly encourages and recommends that the Red Onion building NOT be painted again. Staff encourages the applicant to explore alternatives such as a red tinted lime wash. 21 63 0 W . M a i n S t . - Replacing the existing, non- historic sliding window on the west facade of the historic resource with an in-swinging French casement window Conditions: Existing casing and sill nosing is to be maintained in place except where missing or degraded beyond repair. 22 Certificates of No Negative Effect Historic Preservation Commission April 9, 202423 63 5 W . B l e e k e r S t . Replacing 5 non-historic wood windows in kind. 24 13 0 S . G a l e n a S t . - Brick testing (Shear, Deformability, Mortar Flexural Bond Strength, and Anchor) - Repointing where mortar is disturbed - Interior brick replacement where brick fails Conditions: - Testing locations TBD on site with HP staff - Mortar mixture to be reviewed/approved on site with HP staff - Replacement brick to be reviewed/approved by HP staff 25 32 0 E . H y m a n A v e . - Installation of a black metal and acrylic theater sign with interior Condition: Lighting must be subtle and concealed, complying with Sec. 26.510.070 and 26.512. lighting on the south façade of the elevator shaft. 26 41 4 N . F i r s t S t . - Installation of backyard putting green with regrading not to exceed 2 feet. 27 21 1 W . H o p k i n s A v e . - Installation of a hot tub at least 4-feet west of the historic resource, and at least 5- feet-6-inches behind (south of) the front façade of, the historic resource and behind (south of) the existing west side yard fence. 28 -Enlarging the awning -Adding halo lighting to the pin-mounted sign letters -Painting all metal fenestration frames and pin-mounted signs black 40 0 E . H y m a n A v e . , B-20 1 -B-20 2 , B -30 1 -Replacing door and sidelight with a window atop a brick bulkhead -Replacing the awning, sign and light fixture with an extended awning, and repairing the brick. 29 40 0 E . H y m a n A v e . , B-20 1 -B-20 2 , B -30 1 - Replacing rooftop mechanical units with two HVAC units on existing dunnage and one packaged rooftop unit. - Replacing the chamfered corner entry paver with honed black granite and painting the logo inlay black Condition: Relocating the existing signs to the cornice is not approved. 30 10 9 N . S e c o n d S t . Installing a 5-foot- tall, red-cedar- picket-on- blackened-steel- rail fence on the south side yard of the historic resource. Condition: Spacing between the pickets must be at least 1/2 the width of the picket, or the fence boards must be staggered on either side of the fence rail to avoid blocking public views of the resource; and, the fence must not attach/connect to the historic resource.31 Call Up Reports Historic Preservation Commission April 9, 202432 33 7 L a k e A v e . 335 LAKE AVE. existing historic resource (Lot A) 337 LAKE AVE. proposed development (Lot B) Lot A Lot B 33