resolution.council.062-25
RESOLUTION #062 (Series of 2025) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CHANGE ORDER FOR CITY PROJECT #2024- O51, PARK AVE IZ�TFRASTRUCTURE IMPROVEMENTS, BETV'iTEEN THE CITY OF ASPEN AND STUTSMAN GERBAZ INC., AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a change order between the City Council and Stutsman Gerbaz Inc., a true and accurate copy of which is attached hereto as "Exhibit A", and, WHEREAS, City Council considered and approved the agreement at a regular council meeting on April 22, 2025: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF That the City Council of the City of Aspen hereby approves the Change Order to the agreement between The City of Aspen and Stutsman Gerbaz Inc., a copy of which is annexed hereto and incorporated herein, and does hereby authorize the Interim City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 22nd day of April, 2025 . 1 Richards, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, Apri122nd, 2025. Nicole Henning, City Clerk Docusign Envelope ID: 7CCD4lB8-A5E147D2-AF2E-E70F77241624 Resolution #062 - 2025 Exhibit A 11 Change Order PROJECT: (Name and address) 1111 1111 Lai 1110 TOTI111 I I A I City of Aspen- Park Avenue Improvement Project. Project 2024-051 Aspen, CO OWNER: (Nunte and address) City of Aspen 127 Rio Grande Place Aspen, CO 81611 CONTRACT INFORMATION: Contract For: General Construction Date: August 13, 2024 ARCHITECT: (Name uttd address) Not applicable CHANGE ORDER INFORMATION: Change Order Number, I Date: April 10, 2025 CONTRACTOR: (Name and address) Shrtsman-Gerbaz, Inc. 30376 Highway 82 Sno vmass, CO 81654 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of'the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) See attached the Stutsman-Gerbaz, Inc. Change Order #1 proposal dated April 9, 2025 for details, additions and use of bid allowances. The original Contract Sum was $ 1,544,708.06 The net change by previously authorized Change Orders $ 0.00 Tlie Contract Stun prior to this Change Order was $ 15544,708.06 The Contract Sum will be increased by this Change Order in the amount of $ 725,509.03 The new Contract Sum including this Change Order will be $ 272705217.09 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be October 31, 2025 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Tinie, that have been authorized by Constt action Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Not required ARCHITECT (First name) SIGNATURE PRINTED NAME AND TITLE DATE Stutsman-Gerbaz, Inc. (Fit•m n SIGNATURE Shay Stutsman- Presidetrt PRINTED NAME AND TITLE DATE Citv of . OWNER (F�r•tn�taltte)�.� � , I � SIGNATURE Pete Streckerinterim City Manager PRINTED NAME AND TITLE 4/23/2025 � 513:27 PM MDT DATE AIA Document G701 — 2017. Copyright ©1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Instltute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 13:46:35 ET on 04/10/2025 under Order No.2114456543 which expires on 06/15/2025, is not for resale, is licensed for one-time use only, and may only be used In accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, s-mail docinfo@aiacontracts.com. User Notes: (3139ADA48) Docusign Envelope ID: 7CCD41B8-A5E1-47D2-AF2E-E70F77241624 Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 Park Avenue Improvements 9-Apr-25 Change order Request 1 Bid Item Description General Qty Units Installation of 2 - 8" Gate Valves 1 8" Gate Valves 2 EA General Storm Drainage add to revised depths 1 Credit if were allowed to shallow up the the install 1 LS Added Traffic control added scope 1 Added days due to scope increase 30 Days Added items due to bid schedule adds. 1 Full Depth Asphalt Removal 1087 SF 2.1 Asphalt Mill and Overlay-2 inch 1,350 SF 4 Driveway Concrete Demo 267.5 SF 5 Sidewalk Concrete Removal 403 SF Surface Infrastructure 13 HMA (Grade SX) (Roadway) 591 SF 13.1 4"Solid Double Yellow Pavement Marking 315 if 13.2 2'x10' White Crosswalk Pavement Marking �5 ea 13.3 R1-6 Crosswalk Sign 1 ea 18.1 6"floating sidewalk 125 SF Added bi direction ramp 1 ea Stormwater Improvements 30 Neenah 3280-B Combination Inlet 1 EA 33 15" Storm Lateral 20.24 LF Pothole Allowance 1 Pothole allowance as needed 1 LS Shoring Design Installation of micropile/cap per design 165 LF Mobilization 1 EA Original Bid Allowance per 70 LF of Micropile 1 LS Tota l