CITY COUNCIL WORK SESSION
May 5, 2025
4:00 PM, City Council Chambers
427 Rio Grande Place, Aspen
I.Work Session
I.A Willoughby Park Funding
Zoom Meeting Instructions
Join from PC, Mac, iPad, or Android:
https://us06web.zoom.us/j/85310186981?pwd=CuPDybX1Ya0cyLn1BMsGpHY1bfb8b2.1
Passcode:81611
Join via audio:
Dial: +1 346 248 7799
Webinar ID: 853 1018 6981
Passcode: 81611
International numbers available: https://us06web.zoom.us/u/kcRhSdH18b
Willoughby Park Funding Memo 5-5-25.docx
1
1
MEMORANDUM
TO:Mayor and City Council
FROM:Mike Tunte, Landscape Architect and Construction Manager
Matt Kuhn, Parks and Open Space Director
THROUGH:Austin Weiss, Director of Parks and Recreation
MEETING DATE:May 5, 2025
RE:Lift One Corridor Funding Work Session
REQUEST OF COUNCIL:
The goal of this work session is to update City Council on the developing timeline for the Lift One
corridor project and the scale of financial commitment required. Staff are requesting direction on
discretionary aspects of the Willoughby Park / Lift One Corridor project, including the prioritization of
the pool house conversion with its associated costs.
BACKGROUND:
The Willoughby Park project is part of the broader Lift One Corridor plan approved by voters in 2019.
The project united the City of Aspen with the developers OKO Group and Lift One Lodge, the Aspen
Skiing Company, and the Aspen Historical Society to work together bring the lift down to Dean Street,
where skiing began in Aspen with the dedication of Lift 1 in 1947. The resulting unified plan went to a
public vote and narrowly passed in March 2019. Since then, the project has moved forward with the
completion of multiple agreements and the submission of building permit applications for both lodges.
The Lift One Corridor Project encompasses several parcels of land from the corner of South Aspen Street
and Dean Street to just above the current base of Lift 1A. The redevelopment of the corridor includes
the construction of a new telemix lift, base area, and skier return located closer to Dean Street. The
project also involves the relocation and rehabilitation of historic buildings such as the Skiers Chalet
Lodge and Steakhouse, and the restoration of the original Lift 1 towers and gantry.
The city played a pivotal role in conceptualizing an integrated approach to lowering the chairliftand
skiing access, and ensuring better connectivity between parks and open spaces in the area in both
summer and winter.
With the Dolinsek family offering the transfer of their family’s property in 2014 to become a park, the
Parks and Open Space department gained a large parcel of land that could be joined with neighboring
Willoughby Park for multiple seasons of enjoyment. In planning this new park, the primary goal was to
build and maintain a public park that would serve as a green oasis in a rapidly developing part of town.
Secondarily, skiing across the park would also be allowed. This vision came to fruition with the
2
dedication of Dolinsek Gardens in 2023 and the park now stands as a testament to the city's
commitment to preserving green spaces for public enjoyment and environmental sustainability.
The second crucial action was a land exchange. This exchange effectively consolidated and unified
Willoughby Park and Lift 1A Park, with the Dolinsek Gardens as a separate but adjacent park to the new
parcel. By doing so, it created a seamless network of parks and open spaces, enhancing accessibility and
connectivity for residents and visitors alike. Additionally, this land exchange allowed for the relocation of
the historic Lift 1A resource in Willoughby Park, ensuring that this important piece of the area's heritage
remains intact for future generations to appreciate.
Previous ownership
Current ownership
Land exchange
DOLINSEK
.76 AC
3
DISCUSSION:
Ordinances and Parks Responsibility
City Council passed Ordinances No. 38 (Lift One Lodge) and No. 39 (Gorsuch Haus) in 2018 following the
approval of the Aspen electorate. Ordinance No. 38 outlines the terms of approval for the Lift One
Project and most of the City-related agreements. This ordinance authorizes the development Lift One
Lodge and includes improvements on City-owned property, such as the redesigned Willoughby Park, ski
corridor, lift alignment,and the Dean Street Plaza
The Parks Department is expected to play a significant role in the Lift One Corridor project by
undertaking several key responsibilities. The Ordinance states in Section 12, in part :
It is also stated that Parks is tasked with completing the final grading and applying topsoil that meets
departmental standards in the City park areas.
Funding
The funding for the Lift One Project is a critical component of the overall park planning strategy. The City
of Aspen has committed a fixed amount of $4,360,000, which is being held in escrow,to support the
public-facing elements of the project along Dean Street.Separately, Section 12 also places the
responsibility to make certain improvements on the Parks and Open Space department. The cost of
these improvements was not contemplated by the Ordinance, and represents a significant financial
investment that requires further appropriation by City Council.
Parks Department responsibilities in green
4
For example, while the developer is responsible for relocating the historic pool house and ensuring
appropriate utility connections, the Parks Department is tasked with its renovation. Currently, the plan
is to convert the pool house into a public restroom, although it could alternatively be repurposed as a
storage shed. Depending on the final decisions regarding historic restoration, construction costs, and
timing with potential cost escalations, the conversion of the pool house into a restroom is currently
estimated to cost between $450,000 and $750,000.
As the project is drawing closer to breaking ground, integrating the appropriate funding required by the
Parks and Open Space (100) Fund into the broader departments’capital planning efforts is essential.
Additionally, with possible softening of sales tax revenue in 2027 due to the closure of the Aspen
Airport, increased scrutiny and effort is being placed on overall project timing across the department.
The project aligns with the Parks Department's goals of enhancing public spaces and ensuring
connectivity between parks and open spaces. Staff are currently prioritizing the funding of this project
over other possible projects, and will be including allocations in 2026 that will allow for the City to retain
an owner’s representative to engage on the project.
Next steps
Moving forward, the Parks Department will continue collaborating with Lift One Lodge on the approach
to contracting. This collaboration is essential to ensure that all aspects of the project are aligned and
that the responsibilities of each party are clearly defined. The department will also work closely with
finance, procurement and the City attorney to review the draft capital plan to determine the best way to
contract this work. We anticipate site work and expenses to commence in 2026 and increase in 2027.
We are looking to Council to confirm the City’s support for this project as a high priority for the Parks
and Open Space department, and in the 2026 capital planning discussion, be prepared to commit the
estimated funds. Staff are also looking for Council direction on whether the pool house conversion and
its associated costs should be prioritized. Councils’guidance will help us ensure that the project aligns
with our broader park planning efforts and resource allocation throughout the remaining 2026 budget
preparation work.
FINANCIAL/BUDGET IMPACTS:
The Parks and Open Space Department has adapted a financial model that estimates project costs based
on recent projects and unit quantities. Based on this model, the Parks and Open Space department
Existing pool house Pool house renovation and reuse
5
anticipates that that those portions of the project that are Parks responsibility will be $4,579,760 and
are further outlined below. (Please note that this figure is in addition to the $4,360,000):
ENVIRONMENTAL IMPACTS:
The Lift One Corridor Project is a significant undertaking that involves extensive excavation,
construction, and site work, all of which have notable environmental impacts. The scale of the project
means that there will be substantial disruption to the landscape, including the removal of trees and
vegetation, changes to the natural terrain, and potential impacts on local wildlife. The construction
activities will also generate noise, dust, and increased traffic, affecting the surrounding community and
environment. Despite efforts to mitigate these effects, this approved project's environmental footprint
is considerable and unavoidable.
Capital Project Budget Estimate
Item Description of Work Qty.Type Unit Cost Sub Amount Multiplier Total
Public Outreach Outreach and Communications 6 Month 3,000.00$ 18,000.00$ 1.000 18,000.00$
Construction Cost Construction Hard Costs $/SF (Après Plaza
Bathroom)
375 SF 1,200.00$ 450,000.00$ 1.000 450,000.00$
Construction Hard Costs $/SF (Entry Plaza,
walk, stairs, après deck)
12000 SF 80.00$ 960,000.00$ 1.000 960,000.00$
Construction Hard Costs $/SF (Dolinsek
green space)
15000 SF 40.00$ 600,000.00$ 1.000 600,000.00$
Construction Hard Costs $/SF (Willoughby
green space)
32000 SF 40.00$ 1,280,000.00$ 1.000 1,280,000.00$
Design Estimate 10% of Estimated $/SF Hardscape
Construction Cost
12000 SF 80.00$ 960,000.00$ 0.100 96,000.00$
10% of Estimated $/SF Softscape
Construction Cost
47000 SF 40.00$ 1,880,000.00$ 0.100 188,000.00$
Permit Fees City of Aspen Permit Fees 1 Lump Sum 35,000.00$ 35,000.00$ 1.000 35,000.00$
Construction
Manager/Owners Rep
Project Management, Coordination,
Oversight, Consulting etc.
24 Month 10,000.00$ 240,000.00$ 1.000 240,000.00$
Permit Required
Inspections/Testing Agents
1% of Estimated $/SF Construction Cost.
Structural welds, Concrete Cylinder Tests,
Soil Compaction test, Soil Percolation tests
47000 SF 80.00$ 3,760,000.00$ 0.010 37,600.00$
Special Inspectors 0.5% of Estimated $/SF Construction Cost.
Roof Inspectors, Water proofing
Inspectors and Window Testing Inspectors
47000 SF 80.00$ 3,760,000.00$ 0.005 18,800.00$
Surveying 50 cents/SF of the project SITE. Required
Prior To Design Team Involvement, As-
builts, Updated Plats etc.
59000 SF 0.50$ 29,500.00$ 2.000 59,000.00$
Estimate 3,982,400.00$
15% Contingency 597,360.00$
Budget Total 4,579,760.00$
6
ALTERNATIVES:
Staff are currently proceeding that all costs for the project are within the Parks Fund (100), however
Council could direct staff to analyze alternative scenarios for funding such as delaying portions of the
project.
Staff are currently proceeding with the plan to convert the pool house to be a public restroom, but
Council may also direct staff to defer or cancel this and use the structure as a simple storage shed
instead.
CITY MANAGER COMMENTS:
7